Commercial Building Permit (New Construction, Addition, Shell Building) in Sahuarita, Arizona

Required for new commercial building construction, commercial additions, and shell buildings in the Town of Sahuarita. Reviewed against the 2024 IBC and Town of Sahuarita amendments, plus ICC A117.1-2009 accessibility standards. Submitted via Accela Citizen Access using the dedicated Commercial (New, Addition, Shell Building) Submittal Checklist. The Town treats tenant improvement work as a genuinely separate permit type from new/shell commercial construction: it is submitted on its own Commercial Tenant Improvement Submittal Checklist (see the commercial-tenant-improvement-permit entry), is billed under a distinct valuation-reduction fee tier (Town Code § 3.10.080(N)), and only the tenant-improvement permit — not the shell/new-building permit — receives a Certificate of Occupancy; the shell/new-building permit instead closes out with a Certificate of Completion.

Verified 2026-08-01 · Source

When you need this permit

  • Building permit required for new commercial building construction, commercial additions, and shell buildings; each building requires a separate permit
  • Reviewed against the 2024 IBC (effective July 1, 2026) and Town of Sahuarita amendments; ADA/accessibility review per the Accessible and Usable Buildings and Facilities ICC A117.1-2009
  • Full construction document set required, sealed by an Arizona Registered Design Professional: cover sheet with page index, site plan, floor plans, elevations (building heights must be shown for zoning review), building sections, foundation plans, framing plans, mechanical/plumbing/electrical plans, and fire sprinkler plans with hydraulic calculations if applicable (deferred submittal accepted for fire sprinkler plans and for truss calculations, noted on the cover sheet)
  • Structural calculations (when engineer-designed), Energy/COMCHECK or approved design program with S,D&J calculations, a soils/geotechnical report no more than 1 year old, specification sheets, and a completed/signed Contractor Form (contractor license number plus Sahuarita business license number) are all required uploads Contractor
  • At second resubmittal: Sahuarita or Pima County Industrial Wastewater Application (if applicable), Pima County Department of Environmental Quality (PDEQ) Construction Authorization (if applicable), Grading Permit approval from Public Works, and a Town of Sahuarita or Pima County Sewer Card depending on provider
  • A free, optional Pre-Application meeting with Planning & Zoning, Public Works, Fire, and Building Safety is recommended before starting a development plan (schedule via 520-822-8855)
  • A Pre-Construction meeting is required as the first inspection; during construction, fire flow and fire access per the adopted International Fire Code Appendix B & D are required before combustible materials are permitted on site
  • If the building owner does not own the property, a letter from the owner authorizing the building is required
  • Tenant improvements and additions to an existing shell require a separate permit (see commercial-tenant-improvement-permit) — utility clearances and Certificates of Occupancy are issued only under tenant-improvement permits, not the shell/new-building permit itself
  • Apply via Accela Citizen Access (aca.accela.com/TOS/Default.aspx); plan check fee must be paid before the application is deemed complete and plan review begins

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — Based on ValuationTown Code § 3.10.080(A) — the same valuation-based schedule applies to commercial and residential construction; no separate commercial-only valuation table is published. Valuation determined by the ICC square-foot construction-cost table (§ 3.10.080(M)).
$23.50 (valuation $1-$500) up through $5,608.75 + $3.65 per additional $1,000 above $1,000,000
Plan Review Fee, All StructuresTown Code § 3.10.080(B)(7)(a) — verified live via real-browser navigation of ecode360.com/49024348 on 2026-08-01
65% of the Building Permit Fee
Fire Protection PermitTown Code § 3.10.080(F); applies when a separate fire sprinkler/fire protection permit is issued for the fire suppression scope
10% of the Building Permit Fee
Zoning Clearance — Commercial and Industrial BuildingsTown Code § 3.10.040(A)(2)
$15.00 (up to 120 sq ft); $45.00 (121-1,000 sq ft); $15.00 per additional 500 sq ft increment above 1,000 sq ft

Review timeline

Plan reviewSahuarita’s published plan-review target
5–20 business days

How long did your Commercial Building Permit (New Construction, Addition, Shell Building) permit actually take in Sahuarita?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Pre-Construction Meeting

    Required as the first inspection, per the Commercial Submittal Checklist

  2. 2

    Foundation/Footing

    Before concrete pour

  3. 3

    Framing / Rough MEP

    Structural framing and mechanical/electrical/plumbing rough-in; truss calculations must be Town-approved before scheduling the shear bracing/exterior framing inspection when no architect/engineer of record has already stamped them

  4. 4

    Final / Certificate of Completion

    New-building/shell permits close out with a Certificate of Completion, not a Certificate of Occupancy — the C.O. is issued only under the associated tenant-improvement permit

See the full Sahuarita inspection guide — scheduling & re-inspection fees →

Tips

  • Per the Town's A.R.S. § 9-835 Building Permit Review Timeframes chart (updated 7/22/2024), 'Commercial: Addition, Alteration, New, Tenant Improvement' carries a 5-business-day administrative completeness review, then 20 business days for the first substantive review AND 20 business days for the second substantive review — unlike the residential addition/remodel category, the commercial second review window is not shortened to 10 days.
  • A shell/new commercial building permit does NOT receive a Certificate of Occupancy on its own — per the Town's own Commercial Submittal Checklist, 'Utility clearances and Certificate of Occupancies will only be issued for tenant improvement permits.' The shell permit instead closes with a Certificate of Completion, which is a prerequisite gate before any tenant-improvement permit inside that shell can receive its own final inspection and C.O.
  • Deferred submittals ARE allowed on the new/shell checklist for truss calculations and (with a note on the cover sheet) fire sprinkler plans and hydraulic calculations — this is a real difference from the Tenant Improvement checklist, which explicitly allows no deferred submittals at all.
  • A free, optional Pre-Application meeting (Planning & Zoning, Public Works, Fire, Building Safety) is available before formal submittal — schedule via 520-822-8855.
  • The Commercial Submittal Checklist (updated November 2024) still cites '2018 IFC Appendix B & D' for fire flow/access during construction, even though the Town's code-adoption page shows the 2024 IFC became mandatory effective July 1, 2026 — this checklist may not yet reflect the 2024 code-cycle update; confirm the governing fire code edition with Building Safety (buildapps@sahuaritaaz.gov) for an active submittal.

Frequently asked questions

Sahuarita requires a commercial building permit (new construction, addition, shell building) for: Building permit required for new commercial building construction, commercial additions, and shell buildings; each building requires a separate permit; Reviewed against the 2024 IBC (effective July 1, 2026) and Town of Sahuarita amendments; ADA/accessibility review per the Accessible and Usable Buildings and Facilities ICC A117.1-2009; Full construction document set required, sealed by an Arizona Registered Design Professional: cover sheet with page index, site plan, floor plans, elevations (building heights must be shown for zoning review), building sections, foundation plans, framing plans, mechanical/plumbing/electrical plans, and fire sprinkler plans with hydraulic calculations if applicable (deferred submittal accepted for fire sprinkler plans and for truss calculations, noted on the cover sheet); Structural calculations (when engineer-designed), Energy/COMCHECK or approved design program with S,D&J calculations, a soils/geotechnical report no more than 1 year old, specification sheets, and a completed/signed Contractor Form (contractor license number plus Sahuarita business license number) are all required uploads; At second resubmittal: Sahuarita or Pima County Industrial Wastewater Application (if applicable), Pima County Department of Environmental Quality (PDEQ) Construction Authorization (if applicable), Grading Permit approval from Public Works, and a Town of Sahuarita or Pima County Sewer Card depending on provider; A free, optional Pre-Application meeting with Planning & Zoning, Public Works, Fire, and Building Safety is recommended before starting a development plan (schedule via 520-822-8855); A Pre-Construction meeting is required as the first inspection; during construction, fire flow and fire access per the adopted International Fire Code Appendix B & D are required before combustible materials are permitted on site; If the building owner does not own the property, a letter from the owner authorizing the building is required; Tenant improvements and additions to an existing shell require a separate permit (see commercial-tenant-improvement-permit) — utility clearances and Certificates of Occupancy are issued only under tenant-improvement permits, not the shell/new-building permit itself; Apply via Accela Citizen Access (aca.accela.com/TOS/Default.aspx); plan check fee must be paid before the application is deemed complete and plan review begins. If your project isn't listed, confirm with Town of Sahuarita Community Development Department — Building Safety Division at 520-822-8866 before starting work.

In Sahuarita, the published Building Permit Fee — Based on Valuation is: $23.50 (valuation $1-$500) up through $5,608.75 + $3.65 per additional $1,000 above $1,000,000. Additional published fees: Plan Review Fee, All Structures — 65% of the Building Permit Fee; Fire Protection Permit — 10% of the Building Permit Fee; Zoning Clearance — Commercial and Industrial Buildings — $15.00 (up to 120 sq ft); $45.00 (121-1,000 sq ft); $15.00 per additional 500 sq ft increment above 1,000 sq ft. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Per the Town's A.R.S. § 9-835 Building Permit Review Timeframes chart (updated 7/22/2024), the 'Commercial: Addition, Alteration, New, Tenant Improvement' category carries a 5-business-day administrative completeness review, 20 business days for the first substantive review, and 20 business days for the second substantive review.

You'll need: Commercial (New, Addition, Shell Building) Submittal Checklist; Contractor Form; Soils/Geotechnical Report; Site/Floor/Foundation/Framing Plans. Depending on your project, Sahuarita may also ask for: Structural Calculations. See the required-documents checklist on this page for details on each.

Sahuarita requires 4 inspection(s) for a commercial building permit (new construction, addition, shell building), in order: Pre-Construction Meeting, Foundation/Footing, Framing / Rough MEP, Final / Certificate of Completion. Schedule each through Town of Sahuarita Community Development Department — Building Safety Division (520-822-8866).

Apply through Town of Sahuarita Community Development Department — Building Safety Division at 375 W. Sahuarita Center Way, Sahuarita, AZ 85629. Phone: 520-822-8866, email: buildapps@sahuaritaaz.gov. Office hours: Office hours are not published on the Town's Permits and Inspections, Community Development, or Building Safety Division pages as of this review; permit submittal and inspection scheduling are handled online through Accela Citizen Access (aca-prod.accela.com/tos) rather than in-person counter hours. General phone contact: 520-822-8866. Source: Town of Sahuarita Permits and Inspections page and Building Safety Division staff directory (sahuaritaaz.gov/758/Building-Safety-Division).. Official information: https://sahuaritaaz.gov/848/Permits-and-Inspections.

Yes. Tenant improvements and additions inside an existing commercial shell require their own permit, submitted on the separate Commercial Tenant Improvement Submittal Checklist, not the Commercial (New, Addition, Shell Building) checklist used for new construction. See the commercial-tenant-improvement-permit entry.

Not under the shell/new-building permit itself. Per the Town's Commercial Submittal Checklist, Certificates of Occupancy and utility clearances are issued only under tenant-improvement permits; a new/shell commercial building permit closes out with a Certificate of Completion instead.

Sources & verification

Verified against official sources. Last reviewed 2026-08-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sahuarita building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Sahuarita.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.