San Luis building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in San Luis, Arizona.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- P.O. Box 3750 - 1090 E. Union Street, San Luis, AZ 85349
- Phone
- 928-341-8565
- jcampa@sanluisaz.gov
- Office hours
- City Hall general hours Mon-Fri 7 a.m.-6 p.m. Building Safety Division office line (928) 341-8565; dedicated Inspection Line/Hot Line for scheduling inspections is (928) 341-8564 (also available via online inspection scheduling). Building Permit Applications may be submitted with a complete set of plans/drawings (electronic PDF preferred; if hard copy, 2 sets for residential, 3 sets for commercial).
- Website
- Official site
Inspection sequence
Applies to: Plumbing Permit
- 1
Underground/Slab
Before concrete pour — verify pipe slope, materials, cleanouts
- 2
Rough-In
After pipes installed, before walls closed
- 3
Final
Fixtures connected, water heater and gas connections verified, no leaks
Applies to: Residential Addition / Remodel Permit
- 1
Foundation/Footing
Required before concrete pour for additions
- 2
Framing
Structural connections to existing structure
- 3
Final
Completed work verified against approved plans
Applies to: Residential Building Permit (New Construction)
- 1
Foundation/Footing
Before concrete pour
- 2
Framing
Structural framing and connections per 2018 IRC
- 3
Final
All work complete per approved plans; scheduled via the Inspection Hot Line (928) 341-8564
Applies to: Electrical Permit
- 1
Rough-In
Wiring, box placement, and panel connections before walls are closed
- 2
Final
Devices installed and panel labeled, verified per 2014 NEC
Applies to: EV Charger / EVSE Permit (Electrical Permit)
- 1
Rough-In
Circuit wiring, box placement, and panel connections before walls are closed, if applicable
- 2
Final
Charger mounted, connections verified, panel labeled, verified per 2014 NEC before energizing
Applies to: Fire Sprinkler Permit
- 1
Rough-In
Piping and head placement before ceiling/wall closure
- 2
Final
System flow test and inspection sign-off
Applies to: Manufactured Home / Park Model Placement Permit
- 1
Foundation/Set
Pit-set or ground-set foundation and tie-down verification
- 2
Final
Utility connections, electrical pedestal, and site improvements verified
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork and equipment placement before walls closed
- 2
Final
Equipment operational, clearances and combustion air verified
Applies to: Residential Solar Photovoltaic (PV) Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before energizing
- 2
Final
Panel mounting, roof penetration sealing, electrical connections, and interconnection point verified
Final inspection only: Demolition Permit
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the San Luis building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
San Luis building permits
Get alerts for San Luis
We'll email you when San Luis's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.