Skip to main content
PermitBase

EV Charger / EVSE Permit (Electrical Permit) in San Luis, Arizona

The City of San Luis has no dedicated EV charger/EVSE permit type or fee line — unlike solar PV, which received a dedicated flat-fee tier explicitly labeled '(NEW) Solar Photovoltaic System Permit Fees' on the City's Development Services fee schedule, no equivalent EV-charger line exists on that same document as of this research pass. An EV charging station (Level 2 or DC fast charger) installation is instead processed and billed as a standard Electrical Permit, governed by the 2014 National Electrical Code (NEC) as adopted and amended by City of San Luis Ordinance No. 390, using the same itemized component fee schedule (base issuance fee plus per-circuit/per-panel add-ons) documented in this file's electrical-permit entry.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical permit required for the EV charger's dedicated circuit (branch circuit), any feeder circuit, and any service panel upgrade needed to support the charger's load
  • Governed by the 2014 NEC as adopted by City of San Luis Ordinance No. 390
  • Complete the Building/Electrical Permit Application listing the electrical subcontractor's name, phone, and license number
  • Contractor must hold a City of San Luis Business License and Arizona ROC license number Contractor
  • If the EV charger installation requires a service panel upgrade (e.g., to accommodate a new 40-60A circuit), that scope is billed under the same electrical permit's per-panel-size fee tier

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Issuance of each electrical permit (Residential)City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees, Electrical Code Fees — same base fee applied to any electrical permit including an EV charger circuit, since no dedicated EV-charger fee line exists
$50
Each feeder circuitIn addition to the base permit fee; applicable if the EV charger installation requires a new feeder circuit
$5
Each branch circuitIn addition to the base permit fee; the dedicated circuit run to a Level 2 EV charger would typically be billed under this line
$2
Each service entrance panel up to and including 200 ampsIn addition to the base permit fee; applicable only if the EV charger installation requires a panel upgrade or new service entrance
$20
Each service entrance panel up to and including 800 ampsIn addition to the base permit fee
$40

Review timeline

Plan reviewSan Luis’s published plan-review target
6–11 business days

How long did your EV Charger / EVSE Permit (Electrical Permit) permit actually take in San Luis?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Circuit wiring, box placement, and panel connections before walls are closed, if applicable

  2. 2

    Final

    Charger mounted, connections verified, panel labeled, verified per 2014 NEC before energizing

See the full San Luis inspection guide — scheduling & re-inspection fees →

Tips

  • Unlike solar PV, which has its own dedicated flat-fee tier ($150 or $350 by system size), San Luis has no dedicated EV-charger fee line — an EV charger circuit is billed under the standard Electrical Permit's itemized component fees (base $50 issuance plus per-circuit/per-panel add-ons).
  • Per the A.R.S. § 9-835 timeframes document, 'Residential Building – Elec./Plumb./Mech.' is 1/5/5 business days (11 total, 6 if no 2nd review needed) — the same timeframe category this file's electrical-permit entry documents, applied here since EV chargers fall under the same permit type.
  • If a panel upgrade is needed to support the EV charger's circuit, budget for the separate service-entrance-panel fee tier ($20-$60 depending on amperage) in addition to the base issuance and branch-circuit fees.

Frequently asked questions

San Luis requires an ev charger / evse permit (electrical permit) for: Electrical permit required for the EV charger's dedicated circuit (branch circuit), any feeder circuit, and any service panel upgrade needed to support the charger's load; Governed by the 2014 NEC as adopted by City of San Luis Ordinance No. 390; Complete the Building/Electrical Permit Application listing the electrical subcontractor's name, phone, and license number; Contractor must hold a City of San Luis Business License and Arizona ROC license number; If the EV charger installation requires a service panel upgrade (e.g., to accommodate a new 40-60A circuit), that scope is billed under the same electrical permit's per-panel-size fee tier. If your project isn't listed, confirm with City of San Luis Development Services Department — Building Safety Division at 928-341-8565 before starting work.

In San Luis, the published Issuance of each electrical permit (Residential) is: $50. Additional published fees: Each feeder circuit — $5; Each branch circuit — $2; Each service entrance panel up to and including 200 amps — $20; Each service entrance panel up to and including 800 amps — $40. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Same as any electrical permit: per the City's A.R.S. § 9-835 Building Permit Processing Time Frames document, 'Residential Building – Elec./Plumb./Mech.' has a 1-business-day administrative review, 5 business days for first plan review, and up to 5 more for a second review — 11 business days overall, or 6 if no second review is needed.

You'll need: Building/Electrical Permit Application. See the required-documents checklist on this page for details on each.

San Luis requires 2 inspection(s) for an ev charger / evse permit (electrical permit), in order: Rough-In, Final. Schedule each through City of San Luis Development Services Department — Building Safety Division (928-341-8565).

Apply through City of San Luis Development Services Department — Building Safety Division at P.O. Box 3750 - 1090 E. Union Street, San Luis, AZ 85349. Phone: 928-341-8565, email: jcampa@sanluisaz.gov. Office hours: City Hall general hours Mon-Fri 7 a.m.-6 p.m. Building Safety Division office line (928) 341-8565; dedicated Inspection Line/Hot Line for scheduling inspections is (928) 341-8564 (also available via online inspection scheduling). Building Permit Applications may be submitted with a complete set of plans/drawings (electronic PDF preferred; if hard copy, 2 sets for residential, 3 sets for commercial).. Official information: https://www.sanluisaz.gov/departments/development_services/building_safety/building_permits.php.

San Luis, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of San Luis independently adopts and administers its own construction codes through its Development Services Department, Building Safety Division. Source: City of San Luis Building Inspections & Codes page (sanluisaz.gov/departments/development_services/building_safety/building_inspections_codes).; 2018 International Building Code (IBC), adopted by reference as the City's current uniform building code. Source: City of San Luis Building Inspections & Codes page, 'Current Codes' list, verified live July 2026.; 2018 International Residential Code (IRC), adopted by reference as the City's current one- and two-family dwelling code. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2018 International Existing Building Code (IEBC), adopted by reference, governing repair, alteration, addition, and change of occupancy of existing buildings. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2018 International Swimming Pool and Spa Code (ISPSC), adopted by reference, governing swimming pool, spa, and pool barrier construction. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2018 International Property Maintenance Code (IPMC), adopted by reference, governing maintenance of existing structures and premises. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2014 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by reference — one edition behind the current 2023 NEC cycle used by several neighboring Arizona cities; independently confirmed still listed as current on the City's live Building Inspections & Codes page as of July 2026 (not simply carried over from a stale directory). Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2012 International Mechanical Code (IMC), adopted by reference — independently confirmed still listed as current on the City's live Building Inspections & Codes page as of July 2026. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2012 International Plumbing Code (IPC), adopted by reference — independently confirmed still listed as current on the City's live Building Inspections & Codes page as of July 2026. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2009 International Energy Conservation Code (IECC), adopted by reference — independently confirmed still listed as current on the City's live Building Inspections & Codes page as of July 2026; this is a notably older energy-code edition than most Arizona municipalities' current adoptions. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; All of the above codes (2018 IBC, IRC, IEBC, ISPSC, IPMC; 2014 NEC; 2012 IMC, IPC; 2009 IECC) are amended by City of San Luis Ordinance No. 390, per the City's Building Inspections & Codes page. The full text of Ordinance No. 390 was not separately located on the live site as a standalone downloadable document during this verification pass; the codes-adopted list itself is sourced directly to the City's official Building Inspections & Codes webpage, which is the authoritative live citation. Source: City of San Luis Building Inspections & Codes page (sanluisaz.gov/departments/development_services/building_safety/building_inspections_codes).; Manufactured homes and mobile homes: the City's Development Services fee schedule notes Manufactured Home (MH) Permit Fees for pit-set and ground-set installations are now referred to the 'State of AZ' rather than a City-set flat fee (Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing regulates factory-built construction/installation standards per A.R.S. § 41-4001 et seq.); the City separately issues a Building Permit Processing Time Frame track for 'Manufactured Home' and 'Park Model' placement (2 business days 1st review, 2 business days 2nd review, 5 business days overall). Source: City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees document; City of San Luis Building Permit Processing Time Frames (A.R.S. § 9-835 compliance document).. Local amendments apply — see the San Luis overview page for the full list.

No. Unlike solar PV, which has its own dedicated flat-fee tier, EV charger installations in San Luis are processed as a standard Electrical Permit: $50 base issuance fee plus itemized fees such as $2 per branch circuit, $5 per feeder circuit, and $20-$60 for a service panel if an upgrade is needed.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the San Luis building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.