Required for plumbing installation, alteration, or repair work in San Luis, governed by the 2012 International Plumbing Code (IPC) as adopted and amended by City of San Luis Ordinance No. 390.

Verified 2026-07-06 · Source

When you need this permit

  • Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping
  • Governed by the 2012 IPC as adopted by City of San Luis Ordinance No. 390
  • Complete Building Permit Application listing plumbing subcontractor name, phone, and license number

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Issuance of each plumbing permit (Residential)City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees, Plumbing Code Fees
$50
Issuance of each plumbing permit (Commercial)City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees
$50
Each plumbing fixture or trap (or set of fixtures on one trap)In addition to the base permit fee; includes water, drainage piping, and backflow protection
$7
Each water heater and/or ventIn addition to the base permit fee
$7
Each gas-piping system, 1-5 outletsIn addition to the base permit fee; each additional outlet is $2
$10
Each private sewage disposal systemIn addition to the base permit fee
$50
Each supplemental permit (original not expired/cancelled/finaled)City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees
$10

Review timeline

Plan reviewSan Luis’s published plan-review target
6–11 business days

How long did your Plumbing Permit permit actually take in San Luis?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Underground/Slab

    Before concrete pour — verify pipe slope, materials, cleanouts

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    Fixtures connected, water heater and gas connections verified, no leaks

See the full San Luis inspection guide — scheduling & re-inspection fees →

Tips

  • Per the A.R.S. § 9-835 timeframes document, 'Residential Building – Elec./Plumb./Mech.' is classified together at 1/5/5 business days (11 total, 6 if no 2nd review needed).
  • Water heater replacement is billed as a $7 add-on fee per unit under the plumbing permit's base $50 issuance fee, not a separate stand-alone permit type.

Frequently asked questions

Yes — a plumbing permit is required, consisting of the $50 base issuance fee plus a $7 per-water-heater/vent fee, per the City of San Luis Development Services fee schedule.

In San Luis, the published Issuance of each plumbing permit (Residential) is: $50. Additional published fees: Issuance of each plumbing permit (Commercial) — $50; Each plumbing fixture or trap (or set of fixtures on one trap) — $7; Each water heater and/or vent — $7; Each gas-piping system, 1-5 outlets — $10; Each private sewage disposal system — $50; Each supplemental permit (original not expired/cancelled/finaled) — $10. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Per the City's A.R.S. § 9-835 Building Permit Processing Time Frames document, plumbing work (grouped with electrical and mechanical as 'Residential Building – Elec./Plumb./Mech.') has a 1-business-day administrative review, 5 business days for first plan review, and up to 5 more for a second review — 11 business days overall, or 6 if no second review is needed.

You'll need: Building/Plumbing Permit Application. See the required-documents checklist on this page for details on each.

San Luis requires 3 inspection(s) for a plumbing permit, in order: Underground/Slab, Rough-In, Final. Schedule each through City of San Luis Development Services Department — Building Safety Division (928-341-8565).

Apply through City of San Luis Development Services Department — Building Safety Division at P.O. Box 3750 - 1090 E. Union Street, San Luis, AZ 85349. Phone: 928-341-8565, email: jcampa@sanluisaz.gov. Office hours: City Hall general hours Mon-Fri 7 a.m.-6 p.m. Building Safety Division office line (928) 341-8565; dedicated Inspection Line/Hot Line for scheduling inspections is (928) 341-8564 (also available via online inspection scheduling). Building Permit Applications may be submitted with a complete set of plans/drawings (electronic PDF preferred; if hard copy, 2 sets for residential, 3 sets for commercial).. Official information: https://www.sanluisaz.gov/departments/development_services/building_safety/building_permits.php.

San Luis, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of San Luis independently adopts and administers its own construction codes through its Development Services Department, Building Safety Division. Source: City of San Luis Building Inspections & Codes page (sanluisaz.gov/departments/development_services/building_safety/building_inspections_codes).; 2018 International Building Code (IBC), adopted by reference as the City's current uniform building code. Source: City of San Luis Building Inspections & Codes page, 'Current Codes' list, verified live July 2026.; 2018 International Residential Code (IRC), adopted by reference as the City's current one- and two-family dwelling code. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2018 International Existing Building Code (IEBC), adopted by reference, governing repair, alteration, addition, and change of occupancy of existing buildings. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2018 International Swimming Pool and Spa Code (ISPSC), adopted by reference, governing swimming pool, spa, and pool barrier construction. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2018 International Property Maintenance Code (IPMC), adopted by reference, governing maintenance of existing structures and premises. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2014 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by reference — one edition behind the current 2023 NEC cycle used by several neighboring Arizona cities; independently confirmed still listed as current on the City's live Building Inspections & Codes page as of July 2026 (not simply carried over from a stale directory). Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2012 International Mechanical Code (IMC), adopted by reference — independently confirmed still listed as current on the City's live Building Inspections & Codes page as of July 2026. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2012 International Plumbing Code (IPC), adopted by reference — independently confirmed still listed as current on the City's live Building Inspections & Codes page as of July 2026. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2009 International Energy Conservation Code (IECC), adopted by reference — independently confirmed still listed as current on the City's live Building Inspections & Codes page as of July 2026; this is a notably older energy-code edition than most Arizona municipalities' current adoptions. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; All of the above codes (2018 IBC, IRC, IEBC, ISPSC, IPMC; 2014 NEC; 2012 IMC, IPC; 2009 IECC) are amended by City of San Luis Ordinance No. 390, per the City's Building Inspections & Codes page. The full text of Ordinance No. 390 was not separately located on the live site as a standalone downloadable document during this verification pass; the codes-adopted list itself is sourced directly to the City's official Building Inspections & Codes webpage, which is the authoritative live citation. Source: City of San Luis Building Inspections & Codes page (sanluisaz.gov/departments/development_services/building_safety/building_inspections_codes).; Manufactured homes and mobile homes: the City's Development Services fee schedule notes Manufactured Home (MH) Permit Fees for pit-set and ground-set installations are now referred to the 'State of AZ' rather than a City-set flat fee (Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing regulates factory-built construction/installation standards per A.R.S. § 41-4001 et seq.); the City separately issues a Building Permit Processing Time Frame track for 'Manufactured Home' and 'Park Model' placement (2 business days 1st review, 2 business days 2nd review, 5 business days overall). Source: City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees document; City of San Luis Building Permit Processing Time Frames (A.R.S. § 9-835 compliance document).. Local amendments apply — see the San Luis overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the San Luis building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.