Electrical Permit in San Luis, Arizona

Required for electrical installation, alteration, or repair work in San Luis, governed by the 2014 National Electrical Code (NEC) as adopted and amended by City of San Luis Ordinance No. 390.

Verified 2026-07-06 · Source

When you need this permit

  • Electrical permit required for service panels, feeder circuits, branch circuits, and other hard-wired electrical work
  • Governed by the 2014 NEC as adopted by City of San Luis Ordinance No. 390
  • Complete Building Permit Application listing electrical subcontractor name, phone, and license number
  • Contractor must hold a City of San Luis Business License and Arizona ROC license number Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Issuance of each electrical permit (Residential)City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees, Electrical Code Fees
$50
Issuance of each electrical permit (Commercial)City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees
$50
Each service entrance panel up to and including 200 ampsIn addition to the base permit fee
$20
Each service entrance panel up to and including 800 ampsIn addition to the base permit fee
$40
Each service entrance panel over 800 ampsIn addition to the base permit fee
$60
Each temporary construction serviceIn addition to the base permit fee
$15
Each feeder circuitIn addition to the base permit fee
$5
Each branch circuitIn addition to the base permit fee
$2
Each electrical pedestal for a Manufactured Home lot or spaceIn addition to the base permit fee
$30
Each supplemental permit (original not expired/cancelled/finaled)City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees
$10

Review timeline

Plan reviewSan Luis’s published plan-review target
6–11 business days

How long did your Electrical Permit permit actually take in San Luis?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    Devices installed and panel labeled, verified per 2014 NEC

See the full San Luis inspection guide — scheduling & re-inspection fees →

Tips

  • Per the A.R.S. § 9-835 timeframes document, 'Residential Building – Elec./Plumb./Mech.' is 1/5/5 business days (11 total, 6 if no 2nd review needed); the analogous 'Commercial Building – Elec./Plumb./Mech.' category is faster at 1/5/6 (11 total).
  • Itemized per-component fees (service panel size, feeder circuits, branch circuits) are added on top of the flat $50 issuance fee, not bundled into it.

Frequently asked questions

San Luis requires an electrical permit for: Electrical permit required for service panels, feeder circuits, branch circuits, and other hard-wired electrical work; Governed by the 2014 NEC as adopted by City of San Luis Ordinance No. 390; Complete Building Permit Application listing electrical subcontractor name, phone, and license number; Contractor must hold a City of San Luis Business License and Arizona ROC license number. If your project isn't listed, confirm with City of San Luis Development Services Department — Building Safety Division at 928-341-8565 before starting work.

$50 base issuance fee (residential or commercial), plus itemized fees for each component — e.g., $20 for a service entrance panel up to 200 amps, $5 per feeder circuit, $2 per branch circuit — per the City of San Luis Development Services fee schedule.

San Luis's published plan-review target for an electrical permit is 6–11 business days.

You'll need: Building/Electrical Permit Application. See the required-documents checklist on this page for details on each.

San Luis requires 2 inspection(s) for an electrical permit, in order: Rough-In, Final. Schedule each through City of San Luis Development Services Department — Building Safety Division (928-341-8565).

Apply through City of San Luis Development Services Department — Building Safety Division at P.O. Box 3750 - 1090 E. Union Street, San Luis, AZ 85349. Phone: 928-341-8565, email: jcampa@sanluisaz.gov. Office hours: City Hall general hours Mon-Fri 7 a.m.-6 p.m. Building Safety Division office line (928) 341-8565; dedicated Inspection Line/Hot Line for scheduling inspections is (928) 341-8564 (also available via online inspection scheduling). Building Permit Applications may be submitted with a complete set of plans/drawings (electronic PDF preferred; if hard copy, 2 sets for residential, 3 sets for commercial).. Official information: https://www.sanluisaz.gov/departments/development_services/building_safety/building_permits.php.

San Luis, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of San Luis independently adopts and administers its own construction codes through its Development Services Department, Building Safety Division. Source: City of San Luis Building Inspections & Codes page (sanluisaz.gov/departments/development_services/building_safety/building_inspections_codes).; 2018 International Building Code (IBC), adopted by reference as the City's current uniform building code. Source: City of San Luis Building Inspections & Codes page, 'Current Codes' list, verified live July 2026.; 2018 International Residential Code (IRC), adopted by reference as the City's current one- and two-family dwelling code. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2018 International Existing Building Code (IEBC), adopted by reference, governing repair, alteration, addition, and change of occupancy of existing buildings. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2018 International Swimming Pool and Spa Code (ISPSC), adopted by reference, governing swimming pool, spa, and pool barrier construction. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2018 International Property Maintenance Code (IPMC), adopted by reference, governing maintenance of existing structures and premises. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2014 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by reference — one edition behind the current 2023 NEC cycle used by several neighboring Arizona cities; independently confirmed still listed as current on the City's live Building Inspections & Codes page as of July 2026 (not simply carried over from a stale directory). Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2012 International Mechanical Code (IMC), adopted by reference — independently confirmed still listed as current on the City's live Building Inspections & Codes page as of July 2026. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2012 International Plumbing Code (IPC), adopted by reference — independently confirmed still listed as current on the City's live Building Inspections & Codes page as of July 2026. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; 2009 International Energy Conservation Code (IECC), adopted by reference — independently confirmed still listed as current on the City's live Building Inspections & Codes page as of July 2026; this is a notably older energy-code edition than most Arizona municipalities' current adoptions. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.; All of the above codes (2018 IBC, IRC, IEBC, ISPSC, IPMC; 2014 NEC; 2012 IMC, IPC; 2009 IECC) are amended by City of San Luis Ordinance No. 390, per the City's Building Inspections & Codes page. The full text of Ordinance No. 390 was not separately located on the live site as a standalone downloadable document during this verification pass; the codes-adopted list itself is sourced directly to the City's official Building Inspections & Codes webpage, which is the authoritative live citation. Source: City of San Luis Building Inspections & Codes page (sanluisaz.gov/departments/development_services/building_safety/building_inspections_codes).; Manufactured homes and mobile homes: the City's Development Services fee schedule notes Manufactured Home (MH) Permit Fees for pit-set and ground-set installations are now referred to the 'State of AZ' rather than a City-set flat fee (Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing regulates factory-built construction/installation standards per A.R.S. § 41-4001 et seq.); the City separately issues a Building Permit Processing Time Frame track for 'Manufactured Home' and 'Park Model' placement (2 business days 1st review, 2 business days 2nd review, 5 business days overall). Source: City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees document; City of San Luis Building Permit Processing Time Frames (A.R.S. § 9-835 compliance document).. Local amendments apply — see the San Luis overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the San Luis building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.