Pasadena building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Pasadena, California.
Last verified 2026-09-19 · Source · Embed this page’s badge · Version history
Building department
- Address
- Pasadena City Hall, 100 North Garfield Ave., Pasadena, CA 91101. THE PERMIT CENTER'S OWN SUITE IS NOT STATED on the pages read for this record - the only suite published is Suite N106, which is the business licence counter. The City Hall address above is the one the city publishes in its own site footer.
- Phone
- (626) 744-4200
- Office hours
- "Monday - Thursday & alternate Fridays from 8:30 a.m. - 3:00 p.m.", "Closed alternate Fridays, Weekends and Holidays". AND UNLIKE EVERY OTHER ALTERNATING-FRIDAY CITY IN THIS CORPUS, PASADENA PUBLISHES THE ANSWER: "View the Permit Center Calendar for upcoming closed dates (every other Friday & Holidays)", and the page renders a live list of open days. The list read on 2026-09-19 showed 21, 22 and 23 September open, 8:30 a.m. - 3 p.m. It was truncated to three entries, so no claim is made here about which specific Fridays are closed - the point is that the city publishes a calendar that answers it.
- Website
- Official site
Inspection guide
See how inspections work in Pasadena — sequence, scheduling & re-inspection fees.
Codes adopted
California publishes its building standards as Title 24, adopted by state agencies and republished on a three-year cycle. A city or county may change those standards only after its governing body makes an express finding that the change is reasonably necessary because of local climatic, geological, or topographical conditions, and no change becomes operative until the finding and the change have been filed with the California Building Standards Commission.
- THE MANDATORY SET, as the city lists it: "2025 California Building Codes (Effective January 1, 2026)" comprising the 2025 California Building Code (Volumes 1 and 2), Residential Code, Electrical Code, Mechanical Code, Plumbing Code, Energy Code, Wildland-Urban Interface Code, Historical Building Code, Fire Code, Existing Building Code, and Green Building Standards Code (CALGreen).
AND A SECOND, OPTIONAL SET THAT EXISTS NOWHERE ELSE IN THIS CORPUS: the same page publishes "Eaton Fire Rebuild Building Codes (Optional)" - the 2022 California Building Code (Volumes 1 and 2), Residential, Electrical,… Show full textShow less
AND A SECOND, OPTIONAL SET THAT EXISTS NOWHERE ELSE IN THIS CORPUS: the same page publishes "Eaton Fire Rebuild Building Codes (Optional)" - the 2022 California Building Code (Volumes 1 and 2), Residential, Electrical, Mechanical, Plumbing, Energy, Green Building Standards and Fire Codes. So for Eaton Fire rebuilds the city publishes an election to the PREVIOUS code cycle rather than the current one. The statutory authority for that election was not read for this record and is not asserted here; what is recorded is that the city publishes it.
- Health & Safety Code 18938(b) provides that building standards in the California Building Standards Code "shall apply to all occupancies throughout the state and shall become effective 180 days after publication." The 2025 code was published July 1, 2025 and took effect January 1, 2026.
Permit types & fees
Pasadena's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Pasadena yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Pasadena lands. Privacy.
Tips & gotchas
- AN ALTERNATING FRIDAY THAT THE CITY ACTUALLY RESOLVES. Pasadena publishes "Monday - Thursday & alternate Fridays" and then a Permit Center Calendar "for upcoming closed dates (every other Friday & Holidays)", with a live list of open days rendered on the page. Vallejo publishes the identical schedule shape - "Monday-Thursday and every other Friday" - and no anchor, no start week and no calendar. Same sentence, and only one of the two can be planned against. When a city publishes an alternating schedule, the calendar is the load-bearing half.
- A CITY BUSINESS LICENCE IS A COUNTER PREREQUISITE, NOT PAPERWORK YOU CATCH UP ON: "A City of Pasadena Business License must be presented at arrival for all contractors and agent to contractors pulling permits." It is issued by a different counter - Suite N106 at 100 N. Garfield Ave, or businesslicense@cityofpasadena.net - so a contractor who arrives without one has to solve that first, inside a counter day that ends at 3:00 p.m.
- PASADENA PUBLISHES AN OPTIONAL ELECTION TO THE PREVIOUS CODE CYCLE FOR EATON FIRE REBUILDS, listed on its own Codes and Regulations page as "Eaton Fire Rebuild Building Codes (Optional)" with the full 2022 California set beneath it. Nothing else in this corpus offers a choice of code edition. A generic record saying "the 2025 California Building Standards Code applies" would be true of Pasadena generally and wrong for exactly the population most likely to be building there.
- THE FEE BASIS IS STATED MORE PLAINLY HERE THAN ANYWHERE ELSE IN THIS CORPUS: "Building Permit fees are valuation-based utilizing the most current issue of the 'Building Valuation Data' (BVD) table published by the International Code Council (ICC)." Pasadena is the third California city in this corpus to name ICC BVD - Concord's Building Official may apply ICC minimums and sets the final valuation, and Vallejo prices on the greater of the declared value or ICC BVD. The ICC table, not the applicant's figure, is the common instrument.
- AND THE VALUATION IS ITSELF A PER-SQUARE-FOOT CALCULATION, which matters to anyone treating valuation-based and per-square-foot as different things. The city gives the form: the BVD table determines an estimated value "(e.g., Gross Area x Square Foot Construction Cost)". So a valuation-based fee here is a floor-area fee wearing a dollar figure, and the two categories are not cleanly disjoint.
- THE CITY SAYS WHAT THE VALUATION IS NOT FOR: the BVD figure "is only intended to assist us in determining their permit fees so that we can uniformly recover the cost of our services". It is a cost-recovery instrument, not a statement of what the building is worth, and it should not be quoted back as an appraisal.
- THE BUILDING FEES ARE NOT ON A BUILDING PAGE. "Refer to fees 221-363 in the General Fee Schedule" - 143 numbered lines inside the city-wide finance schedule, with a separate FY 2026 Planning Fees document for planning applications. Expect to go looking, and note the city's own caveat that "All fees are subject to periodic adjustments."
- THIS IS THE DISASTER-RECOVERY RECORD IN THIS CORPUS. The Building & Safety Division publishes a numbered series of 2025 Disaster bulletins for windstorm and wildfire recovery - colour placards, a GIS map of damaged properties, fire debris removal, next-day inspections for new residential units, lithium-ion batteries burned by wildfires, right-of-entry and opt-out forms, a rebuild permit status GIS map, foundation soils report requirements, and a fee waiver and refund programme. Anyone reading this record for ordinary permitting should know that a large part of what Pasadena currently publishes is addressed to rebuilds rather than to new work.
- OPTING OUT OF THE GOVERNMENT DEBRIS PROGRAMME IS A THREE-DOCUMENT ACT, not a single form. Bulletin 13 states it requires completion of the LA County Opt-Out Form, applying for a City of Pasadena Demolition Permit for 2025 Disaster, and submittal of the Pasadena Local (Opt-Out) Debris Removal Supplemental Application. Doing one of the three is not opting out.
- LIVE COUNTER WAIT TIMES ARE PUBLISHED, which almost nothing else in this corpus does. No figure is recorded here because it is a live value, but it is worth checking before travelling to a counter that closes at 3:00 p.m.