Accessory Dwelling Unit (ADU) Permit in Northglenn, Colorado
Required for construction of an ADU in Northglenn, governed by a detailed Planning & Development / Building Division joint guidance document covering zoning eligibility, size limits, ownership rules, utility requirements, and building-code-specific ADU provisions under the 2021 IRC/IBC as adopted.
Verified 2026-07-05 · Source
When you need this permit
- ADUs are permitted in zoning districts RS-1, RS-2, RS-3, RM-1, RM-2, MN, and PD (subject to case-by-case review for PD districts containing multifamily/live-work components); ADUs are generally prohibited in multifamily dwellings or live/work units
- Only one ADU allowed per property
- Size limit: 750 SF for detached ADUs or ADUs added as an addition to the primary structure across all listed zone districts (RS-1/RS-2/RS-3/RM-1/RM-2/MN); ADUs located entirely within the basement of an existing single-family home may exceed 750 SF if fully contained within the primary building footprint
- Height limit 20 ft across all listed zone districts (pitched/gable/hip roofs may extend up to 5 ft above the 20 ft limit if at least 70% of the roof area has a minimum 4:12 pitch)
- Front setback varies by zone: 30 ft (RS-1), 25 ft (RS-2), 15 ft (RS-3, RM-1, RM-2), 5 ft min/15 ft max (MN); side setback 5 ft in all listed zones; rear setback none in RS-1/RS-2/RS-3/RM-1/RM-2, 5 ft in MN (most residential properties also carry a 5 ft rear utility easement)
- Building coverage cap: 40% (RS-1), 60% (RS-2 through MN); rear yard structure coverage cap 30% in all listed zones
- Property owner must reside in either the primary dwelling or the ADU; ADU ownership may never be legally separated from the primary residence/lot
- ADUs used for short-term rentals require the property owner to reside on the property
- ADUs shall not have more than one bedroom
- Separate water and sewer services are NOT permitted for an ADU (must connect to the primary dwelling's systems, with specific routing rules for attached vs. detached ADUs); separate electric and gas metering IS allowed
- Existing building sewer pipes may lack sufficient depth for a detached ADU — a sewage pump or ejector may be required
- One off-street parking space required per ADU, only if additional parking demand is anticipated beyond what the primary residence already provides
- Building permit required for all ADUs; homeowners/architects may initiate the permit but may not perform the work themselves — General Construction, Electrical, Mechanical, and Plumbing contractors must all be listed before issuance
- ADUs must have independent heating and water heaters; may require 1-hour fire-rated separation if adjacent to the primary structure; radon control systems required for new ADUs (existing basement conversions may be exempt); a blower-door (air leakage) test may be required before Certificate of Occupancy
- Modular, manufactured, or tiny-home ADUs must additionally meet Colorado Division of Housing (DOH) certification standards, submitted at time of city permitting
- For detached ADUs, a utility plan showing the water/sewer connection to the primary dwelling is required, including the existing water meter size (contact Utility Billing at 303.450.8770 if unknown); a fixture count of all existing and proposed fixtures (primary residence plus ADU) is required per IRC Table P2903.6, converted to supply demand via Table P2903.6(1)
- Governed by Northglenn UDO Article 11-4, Article 11-6, and Chapter 10 of the Municipal Code
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation (if new construction)
Before concrete pour, if applicable
- 2
Framing
Structural framing, fire-separation compliance if adjacent to primary structure
- 3
Rough Electrical/Plumbing/Mechanical
Trade rough-ins, including independent heating/water heater installation
- 4
Blower Door Test
May be required before Certificate of Occupancy, with exemptions based on structure type/construction method
- 5
Final Inspection
All work complete, occupancy limit (one bedroom max) and utility-connection compliance confirmed
See the full Northglenn inspection guide — scheduling & re-inspection fees →
Tips
- Northglenn's ADU size cap is a flat 750 SF across every eligible zone district (RS-1 through MN) — simpler than some jurisdictions' percentage-of-primary-unit formulas, but note the basement-conversion exception can exceed 750 SF if fully contained within the existing footprint.
- Separately metering water/sewer to an ADU is NOT allowed in Northglenn (electric/gas metering is allowed) — plan the utility connection back to the primary dwelling early, especially for detached ADUs where sewer depth may be insufficient and require a pump/ejector.
- Modular, manufactured, or tiny-home ADUs carry an extra layer of Colorado Division of Housing certification on top of the city permit — budget extra lead time for state-level plan approval.
- Contact the Planning Division (303-450-8739) for zoning-specific ADU eligibility questions (especially PD districts) before finalizing design, and Utility Billing (303-450-8770) to confirm existing water meter size for detached-ADU utility plans.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-05.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Northglenn building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Northglenn
Accessory Dwelling Unit (ADU) Permit in other cities
Compare accessory dwelling unit (adu) permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Northglenn project checklist
Describe your project once and get every permit, document, and fee it triggers in Northglenn — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →