The City of Northglenn's Building Division lists "EV Chargers" as its own distinct category among the "One-Stop Permits Available Through Community Core" — the same same-visit, no-plan-review track used for water heaters, furnaces, and electrical service upgrades. It is listed separately from the "Electrical Only" one-stop category, but the City does not publish a separate EV-specific dollar fee; the Building Division's published fee schedule breaks out Residential Electrical Permit fees by enclosed living area rather than by equipment type, and EV charger installations are billed on that same area-based Electrical Permit table.

Verified 2026-07-20 · Source

When you need this permit

  • Apply via CommunityCore under the "EV Chargers" One-Stop Permit category — no plan upload or extended plan-review track required
  • Governed by the 2023 NEC as adopted and locally amended by the City of Northglenn
  • All contractors — including electrical contractors — must hold a current City of Northglenn contractor license in addition to any Colorado state electrical licensure Contractor
  • Dedicated branch circuit and NEC Article 625 (Electric Vehicle Power Transfer System) compliance

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Residential Electrical Permit — not more than 1,000 sq ft enclosed living areaNo EV-specific fee is separately published; City of Northglenn Fees & Taxes page area-based Residential Electrical Permit table is the fee mechanism the EV Chargers one-stop category is billed under
$115
Residential Electrical Permit — over 1,000 to 1,500 sq ft
$172.50
Residential Electrical Permit — over 1,500 to 2,000 sq ft
$230
Reinspection Fee
$75/hour

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger Permit permit actually take in Northglenn?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Circuit wiring installed before concealment

  2. 2

    Final Inspection

    EVSE installed, GFCI protection and NEC Article 625 compliance verified, system energized

See the full Northglenn inspection guide — scheduling & re-inspection fees →

Tips

  • "EV Chargers" is its own line item in Northglenn's One-Stop Permit list, separate from "Electrical Only" — apply under that specific category in CommunityCore for the fastest same-visit issuance.
  • No EV-specific fee is published; expect the area-based Residential Electrical Permit fee to apply ($115 at or under 1,000 sq ft of enclosed living area, scaling up from there).
  • Confirm both City of Northglenn contractor licensing and Colorado state electrical licensure are current before applying — Northglenn will not issue the permit otherwise.

Frequently asked questions

Northglenn requires an ev charger permit for: Apply via CommunityCore under the "EV Chargers" One-Stop Permit category — no plan upload or extended plan-review track required; Governed by the 2023 NEC as adopted and locally amended by the City of Northglenn; All contractors — including electrical contractors — must hold a current City of Northglenn contractor license in addition to any Colorado state electrical licensure; Dedicated branch circuit and NEC Article 625 (Electric Vehicle Power Transfer System) compliance. If your project isn't listed, confirm with City of Northglenn Building Division (operated under contract by SAFEbuilt) at 303.450.8745 before starting work.

In Northglenn, the published Residential Electrical Permit — not more than 1,000 sq ft enclosed living area is: $115. Additional published fees: Residential Electrical Permit — over 1,000 to 1,500 sq ft — $172.50; Residential Electrical Permit — over 1,500 to 2,000 sq ft — $230; Reinspection Fee — $75/hour. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Northglenn does not publish a plan-review timeline for this permit. Contact City of Northglenn Building Division (operated under contract by SAFEbuilt) at 303.450.8745 for current turnaround.

You'll need: One-Stop Permit Application (CommunityCore); City of Northglenn Contractor License. See the required-documents checklist on this page for details on each.

Northglenn requires 2 inspection(s) for an ev charger permit, in order: Rough Electrical, Final Inspection. Schedule each through City of Northglenn Building Division (operated under contract by SAFEbuilt) (303.450.8745).

Apply through City of Northglenn Building Division (operated under contract by SAFEbuilt) at 11701 Community Center Drive, Northglenn, CO 80233. Phone: 303.450.8745, email: building@northglenn.org. Office hours: Weekdays, 8:30 a.m. to 4:30 p.m., except holidays; Inspection Request Line 303.450.8748 (call before 4 p.m. for next-work-day scheduling). Official information: https://www.northglenn.org/government/departments/building/.

Northglenn, Colorado has adopted: 2021 International Building Code (IBC), adopted by reference and locally amended — City of Northglenn Building Division code list, https://www.northglenn.org/government/departments/building/index.php; 2021 International Residential Code (IRC), adopted by reference and locally amended, including a locally-filled Table R301.2(1) Climatic and Geographic Design Criteria — source PDF: https://cms7files.revize.com/northglennco/IRC%202021.pdf; 2021 International Existing Building Code (IEBC); 2021 International Fire Code (IFC); 2021 International Mechanical Code (IMC); 2021 International Plumbing Code (IPC); 2021 International Fuel Gas Code (IFGC); 2021 International Energy Conservation Code (IECC); 2021 International Property Maintenance Code (IPMC); 2021 International Swimming Pool and Spa Code (ISPSC); 2023 National Electrical Code (NEC), adopted by reference and locally amended; 2017 ICC A117.1 Accessible and Usable Buildings and Facilities; 1997 Uniform Code for the Abatement of Dangerous Buildings, as amended; Municode Northglenn Chapter 10 (Building Regulations) governs adoption: Article 10-1 (Building Department administration), Article 10-2 (IBC amendments), Article 10-7 (IFGC), Article 10-8 (IRC amendments), Article 10-11 (IECC), Article 10-16 (IPMC), Article 10-17 (IEBC), Article 10-18 (Contractor Licenses) — https://municode.northglenn.org/ch10/chapter_10.html; NOTE (per City's own Building Division page): Northglenn is scheduled to adopt the suite of 2024 ICC codes by summer 2026 and the 2026 NEC immediately following State of Colorado adoption (slated for adoption August 2026) — confirm current edition in force at time of permitting. Local amendments apply — see the Northglenn overview page for the full list.

Northglenn lists "EV Chargers" as its own category among the City's One-Stop Permits available through CommunityCore, issued same-visit without a plan-review track. No EV-specific fee is separately published; it is billed on the same area-based Residential Electrical Permit fee schedule as other electrical work.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Northglenn building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.