EV Charger Permit in Northglenn, Colorado
The City of Northglenn's Building Division lists "EV Chargers" as its own distinct category among the "One-Stop Permits Available Through Community Core" — the same same-visit, no-plan-review track used for water heaters, furnaces, and electrical service upgrades. It is listed separately from the "Electrical Only" one-stop category, but the City does not publish a separate EV-specific dollar fee; the Building Division's published fee schedule breaks out Residential Electrical Permit fees by enclosed living area rather than by equipment type, and EV charger installations are billed on that same area-based Electrical Permit table.
Verified 2026-07-20 · Source
When you need this permit
- Apply via CommunityCore under the "EV Chargers" One-Stop Permit category — no plan upload or extended plan-review track required
- Governed by the 2023 NEC as adopted and locally amended by the City of Northglenn
- All contractors — including electrical contractors — must hold a current City of Northglenn contractor license in addition to any Colorado state electrical licensure Contractor
- Dedicated branch circuit and NEC Article 625 (Electric Vehicle Power Transfer System) compliance
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
City of Northglenn Fees & Taxes page, Other Inspections and Fees — $75.00 per hour. Show full citationHide
City of Northglenn Fees & Taxes page, Other Inspections and Fees — $75.00 per hour. That row belongs to the general building schedule; the electrical article at Municipal Code Sec. 10-3 sets its own “Re-inspection fee for all of the above” at $57.50 flat. Sec. 10-2 carries two conflict rules that point different ways here — “the specific requirement shall be applicable” favours the $57.50 electrical row, while “the more restrictive of the two shall govern” favours the hourly charge on any job over an hour. Confirm with the Building Division which applies to an electrical re-inspection.Review timeline
Inspection process
- 1
Rough Electrical
Circuit wiring installed before concealment
- 2
Final Inspection
EVSE installed, GFCI protection and NEC Article 625 compliance verified, system energized
See the full Northglenn inspection guide — scheduling & re-inspection fees →
Tips
- "EV Chargers" is its own line item in Northglenn's One-Stop Permit list, separate from "Electrical Only" — apply under that specific category in CommunityCore for the fastest same-visit issuance.
- No EV-specific fee is published; expect the area-based Residential Electrical Permit fee to apply ($115 at or under 1,000 sq ft of enclosed living area, scaling up from there).
- Confirm both City of Northglenn contractor licensing and Colorado state electrical licensure are current before applying — Northglenn will not issue the permit otherwise.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Online permit portal
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Northglenn building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Northglenn's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Northglenn yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Northglenn lands. Privacy.
Other permits in Northglenn
EV Charger Permit in other cities
Compare ev charger permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Northglenn project checklist
Describe your project once and get every permit, document, and fee it triggers in Northglenn — in one checklist. Free, for any city and any number of projects.
Get started →