Sign Permit in Northglenn, Colorado

City of Northglenn Unified Development Ordinance (UDO), Chapter 11, Section 11-4-10 (Signs) requires a permit before any sign is erected, mounted, displayed, remodeled, reconstructed, maintained, or moved within the City, except as expressly exempted. Applications go to the Building Department; the Director must approve or deny a complete application within seven days, per Section 11-4-10(d)(2)(C).

Verified 2026-08-14 · Source

When you need this permit

  • No sign shall be erected, mounted, displayed, remodeled, reconstructed, maintained, or moved without first securing a permit from the City, per Sec. 11-4-10(d)(1)
  • Application obtained from and submitted to the Building Department, per Sec. 11-4-10(d)(2)(A)
  • Sign permit fees are based on the building permit fees in the International Building Code in place at the time of application; sign valuation is determined using the Colorado State Tax Commission Manual in effect at application time, per Sec. 11-4-10(d)(2)(B)
  • All electrical work on a sign must be performed by a Colorado-licensed electrician under a separate valid City electrical permit — no electrical work may be performed without one, per Sec. 11-4-10(b)(3) Contractor
  • Certain small/unobtrusive signs are exempt from a permit (e.g., building directory signs up to 15 sq ft, certain directional signs, flags meeting specified limits, small balloon groupings) but remain subject to all other applicable code provisions
  • A denied applicant is contacted within three days to explain the reason; if no agreement is reached, a written notice of denial is prepared within 10 days of the decision, describing appeal rights
  • Denials may be appealed to the Board of Adjustment per Sec. 11-6-7(d)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign Permit Fee (IBC valuation-based)Per UDO Sec. 11-4-10(d)(2)(B). No flat standalone dollar figure is published for signs specifically — contact the Building Department (303.450.8745) for a current fee quote on a specific sign's valuation.
Based on the International Building Code building-permit fee table in effect at time of application, applied to the sign's valuation as determined by the Colorado State Tax Commission Manual

Review timeline

Plan reviewNorthglenn’s published plan-review target
7–7 business days

How long did your Sign Permit permit actually take in Northglenn?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Northglenn inspection guide — scheduling & re-inspection fees →

    Tips

    • The Director's 7-day clock only starts once the application is COMPLETE — an incomplete submittal doesn't start the countdown, so submit a fully documented application to get the fastest turnaround.
    • Sign permit fees piggyback on the IBC building-permit fee table applied to the sign's valuation (per the Colorado State Tax Commission Manual) rather than a flat sign-specific fee — get your contractor's sign valuation figure ready before applying.

    Frequently asked questions

    Northglenn requires a sign permit for: No sign shall be erected, mounted, displayed, remodeled, reconstructed, maintained, or moved without first securing a permit from the City, per Sec. 11-4-10(d)(1); Application obtained from and submitted to the Building Department, per Sec. 11-4-10(d)(2)(A); Sign permit fees are based on the building permit fees in the International Building Code in place at the time of application; sign valuation is determined using the Colorado State Tax Commission Manual in effect at application time, per Sec. 11-4-10(d)(2)(B); All electrical work on a sign must be performed by a Colorado-licensed electrician under a separate valid City electrical permit — no electrical work may be performed without one, per Sec. 11-4-10(b)(3); Certain small/unobtrusive signs are exempt from a permit (e.g., building directory signs up to 15 sq ft, certain directional signs, flags meeting specified limits, small balloon groupings) but remain subject to all other applicable code provisions; A denied applicant is contacted within three days to explain the reason; if no agreement is reached, a written notice of denial is prepared within 10 days of the decision, describing appeal rights; Denials may be appealed to the Board of Adjustment per Sec. 11-6-7(d). If your project isn't listed, confirm with City of Northglenn Building Division (operated under contract by SAFEbuilt) at 303.450.8745 before starting work.

    In Northglenn, the published Sign Permit Fee (IBC valuation-based) is: Based on the International Building Code building-permit fee table in effect at time of application, applied to the sign's valuation as determined by the Colorado State Tax Commission Manual. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    The Director (or designee) must approve or deny a complete sign permit application within seven days of receipt, per UDO Sec. 11-4-10(d)(2)(C).

    You'll need: Sign Permit Application. See the required-documents checklist on this page for details on each.

    Apply through City of Northglenn Building Division (operated under contract by SAFEbuilt) at 11701 Community Center Drive, Northglenn, CO 80233. Phone: 303.450.8745, email: building@northglenn.org. Office hours: Weekdays, 8:30 a.m. to 4:30 p.m., except holidays; Inspection Request Line 303.450.8748 (call before 4 p.m. for next-work-day scheduling). Official information: https://www.northglenn.org/government/departments/building/.

    Northglenn, Colorado has adopted: 2021 International Building Code (IBC), adopted by reference and locally amended — City of Northglenn Building Division code list, https://www.northglenn.org/government/departments/building/index.php; 2021 International Residential Code (IRC), adopted by reference and locally amended, including a locally-filled Table R301.2(1) Climatic and Geographic Design Criteria — source PDF: https://cms7files.revize.com/northglennco/IRC%202021.pdf; 2021 International Existing Building Code (IEBC); 2021 International Fire Code (IFC); 2021 International Mechanical Code (IMC); 2021 International Plumbing Code (IPC); 2021 International Fuel Gas Code (IFGC); 2021 International Energy Conservation Code (IECC); 2021 International Property Maintenance Code (IPMC); 2021 International Swimming Pool and Spa Code (ISPSC); 2023 National Electrical Code (NEC), adopted by reference and locally amended; 2017 ICC A117.1 Accessible and Usable Buildings and Facilities; 1997 Uniform Code for the Abatement of Dangerous Buildings, as amended; Municode Northglenn Chapter 10 (Building Regulations) governs adoption: Article 10-1 (Building Department administration), Article 10-2 (IBC amendments), Article 10-7 (IFGC), Article 10-8 (IRC amendments), Article 10-11 (IECC), Article 10-16 (IPMC), Article 10-17 (IEBC), Article 10-18 (Contractor Licenses) — https://municode.northglenn.org/ch10/chapter_10.html; NOTE (per City's own Building Division page): Northglenn is scheduled to adopt the suite of 2024 ICC codes by summer 2026 and the 2026 NEC immediately following State of Colorado adoption (slated for adoption August 2026) — confirm current edition in force at time of permitting. Local amendments apply — see the Northglenn overview page for the full list.

    Yes, for most signs — no sign may be erected, mounted, displayed, remodeled, reconstructed, maintained, or moved without a permit, with limited exemptions for small/unobtrusive signs listed in the UDO.

    Sources & verification

    Verified against official sources. Last reviewed 2026-08-14.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Northglenn building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.