Electric Vehicle (EV) Charging Station / EVSE Permit — Walsh, Colorado · Requirements sheet
Verified 2026-07-20 · Source: https://townofwalsh.colorado.gov/town-admin/permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electric Vehicle (EV) Charging Station / EVSE Permit in Walsh, Colorado
The Town of Walsh has no dedicated EV charger/EVSE permit, application, or fee, and its official Permits page (which lists only Burn Permit, Building Permit, and Mobile Home Permit) is entirely silent on electrical work of any kind, including EV charging equipment -- the same gap documented on the solar-pv-permit entry. If the EV charger installation involves a new structure (e.g., a carport or shelter to house the charger), that would fall under the Town's single general Building Permit process ($15.00 flat filing fee, Board of Trustees approval at its monthly meeting) the same way solar installations are treated as 'any structure built within town.' A standalone wall-mounted charger with no new structure has no identified TOWN-level permitting mechanism -- but because Walsh has no local electrical inspection program at all (its Permits page lists no electrical permit of any kind), the electrical/EVSE-circuit work itself falls under the Colorado State Electrical Board (DORA/DPO)'s statewide electrical permit and fee schedule, the same state fallback mechanism that applies to all electrical work in jurisdictions without a local electrical inspector. Walsh's population (roughly 500) is far below the 10,000-person threshold that triggers 'covered municipality' status under Colorado's HB24-1173 (Electric Vehicle Charging System Permits Act, effective 8/7/2024), so that statute's mandatory adoption and 3-business-day decision-notification requirements do not apply here.
Verified 2026-07-20 · Source
When you need this permit
- No standalone EV charger/EVSE permit, application, or fee exists; the Town's official Permits page lists only Burn Permit, Building Permit, and Mobile Home Permit, with no electrical-work category of any kind
- If the installation includes a new structure (carport, shed, or similar to house the charger), a Building Permit application would be required per the Town's general 'any structure built within town' standard, submitted to the Town Clerk or Town Superintendent, with Board of Trustees approval at its monthly meeting (first Monday after the 10th)
- A standalone EVSE circuit/wall-mount with no associated new structure has no identified town-level permitting mechanism -- confirm directly with Walsh Town Hall (719-324-5411) whether any process (town or otherwise) applies
- No adopted model building or electrical code (IBC/IRC/NEC) applies at the town level for any permit type in this record; Board of Trustees approval is a governmental action, not a technical code-compliance plan review
- Walsh's population is far below the 10,000-person threshold for 'covered municipality' status under Colorado HB24-1173, so the Act's mandatory EV-permitting-standards adoption and 3-business-day decision timeline do not apply as a legal requirement here
Required documents
Check off what you have — your progress is saved on this device.
Fee schedule
Colorado Revised Statutes § 12-115-121 (State Electrical Board permit-fee authority; Show full citationHide
Colorado Revised Statutes § 12-115-121 (State Electrical Board permit-fee authority; renumbered from the commonly-cited § 12-23-117 effective 10/1/2019). The Town of Walsh's own official Permits page lists only Burn Permit, Building Permit, and Mobile Home Permit -- no electrical permit or electrical inspector of any kind -- confirming the Town has no local electrical inspection program. Per DORA's own published framework, the Colorado State Electrical Board performs electrical inspections in locations throughout the state not inspected by a local authority, so all electrical work in Walsh, including an EV charger/EVSE circuit, falls under this state fee schedule. Confirm the current exact figure with the State Electrical Board, 303-894-7800, since fees are reviewed and adjusted periodically.Review timeline
Inspection process
- 1
Board of Trustees Review (if a Building Permit applies)
Application reviewed and approved (or denied) by the Board of Trustees at its monthly meeting; no separate technical/code-compliance inspection process is published for any permit type
Tips
- Walsh's Permits page is silent on electrical work of any kind, including EV chargers -- the same genuine gap already documented for solar PV interconnection. Call Walsh Town Hall (719-324-5411) directly before assuming no process applies, rather than treating silence as a green light.
- If your EV charger installation is a simple wall-mount with no new structure, it may fall entirely outside Walsh's published permitting scope, per the Town's official Permits page.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Walsh building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Walsh's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Walsh yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Walsh lands. Privacy.
Other permits in Walsh
Electric Vehicle (EV) Charging Station / EVSE Permit in other cities
Compare electric vehicle (ev) charging station / evse permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Walsh project checklist
Describe your project once and get every permit, document, and fee it triggers in Walsh — in one checklist. Free, for any city and any number of projects.
Get started →