Inspection sequence, scheduling, and re-inspection fees for building permits in Nederland, Colorado.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
45 West First Street, Nederland, CO 80466 (mailing: PO Box 396, Nederland, CO 80466)
Phone
303-258-3266
Office hours
Nederland Town Hall open Monday to Friday, 9 a.m. to 5 p.m. In-person appointments with the Community Planner at Town Hall are available on a staggered schedule: first and third weeks of the month on Monday and Wednesday; second and fourth weeks on Wednesday and Friday. Virtual (Teams) meetings available any time by appointment. All Building/Right-of-Way permits and Land Use Applications are submitted to planner@nederlandco.org. Building inspections are scheduled directly with the Town's contracted plan-review/inspection firm, SAFEbuilt Colorado, at (303) 450-8745.

Published scheduling rules

  • Plan review is contracted out to SAFEbuilt Colorado, not performed directly by Town staff — schedule inspections through SAFEbuilt's dedicated line (303-450-8745), separate from the Town's general Building Department line (303-258-3266). (Residential Building Permit (New Construction))
  • Nederland contracts ALL plan review and inspection services to SAFEbuilt Colorado — the Town's own staff (Community Planner/Deputy Zoning Administrator) handle intake, zoning compliance, and fee/escrow administration, but code plan review and field inspections are performed by SAFEbuilt. Schedule inspections through SAFEbuilt's dedicated line (303-450-8745), not the Town's general Building Department number (303-258-3266). The Chief Building Official is Alejandro Pantoja. (General)

Inspection sequence

Applies to: Residential Building Permit (New Construction)

  1. 1

    Setback Verification (ILC)

    Setbacks verified by an Improvement Location Certificate

  2. 2

    Footing and Foundation

    Prior to concrete pour, with all reinforcing in place; may be performed by the engineer of record with a report submitted to SAFEbuilt for review

  3. 3

    Foundation Perimeter Drain

    Drain installation inspected by the design engineer

  4. 4

    Underground Plumbing / Underground Electrical

    Prior to backfill

  5. 5

    Rough-In Plumbing / Electrical / Mechanical / Framing

    Rough-in framing will not be signed off until plumbing, electrical, and heating rough-ins are approved

  6. 6

    Gas Piping / Permanent Electrical Meter / Insulation

    Gas line inspection, permanent meter release, and insulation inspection

  7. 7

    Final Plumbing / Electrical / Mechanical / Building

    Final building sign-off will not occur until plumbing, electrical, and mechanical finals are approved; Certificate of Occupancy will not be issued until all engineers' inspection reports have been received

Applies to: Commercial Tenant Improvement Permit

  1. 1

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment, per commercial inspection sequence

  2. 2

    Fire/Life Safety Inspection

    Fire-resistive construction, egress, and accessibility compliance verified

  3. 3

    Final Inspection

    All work complete per approved plans; Backflow Prevention Survey/RPZ inspection report required before Certificate of Occupancy for non-single-family buildings

Applies to: Deck / Covered Patio / Carport Permit

  1. 1

    Footing Inspection

    Prior to concrete pour, per Nederland Design Criteria frost depth requirements

  2. 2

    Framing/Attachment Inspection

    House/post attachment and structural framing verified

  3. 3

    Final Inspection

    Completed deck/patio/carport per approved plans

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork, flues, and equipment placement before concealment

  2. 2

    Gas Piping Inspection

    Where applicable, per Gas Line Inspection Form

  3. 3

    Final Mechanical

    Equipment operational, combustion air and venting verified

Applies to: Demolition Permit

  1. 1

    Pre-Demolition Asbestos Verification

    Asbestos lab results reviewed before demolition proceeds

  2. 2

    Final Demolition Inspection

    Site cleared and compliant with approved scope

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Wiring and panel installed before concealment

  2. 2

    Final Electrical

    Devices installed, panel labeled, system verified before permanent meter release

Applies to: Plumbing Permit

  1. 1

    Rough Plumbing

    Pipe, drain, waste, vent installation before concealment

  2. 2

    Final Plumbing

    Fixtures connected, no leaks, proper venting verified

Applies to: Residential Addition / Remodel Permit

  1. 1

    Rough-In Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment, per Residential Remodel Inspection List

  2. 2

    Final Inspection

    Final building, electrical, plumbing, and mechanical sign-off

Applies to: Rooftop Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before cover

  2. 2

    Final Inspection

    Racking, roof penetrations, and electrical connections verified

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Nederland building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Nederland building permits

Get alerts for Nederland

We'll email you when Nederland's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.