Inspection sequence, scheduling, and re-inspection fees for building permits in Silver Cliff, Colorado.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
612 E. Main Street, Silver Cliff, CO 81252 (mailing: PO Box 154, Silver Cliff, CO 81252)
Phone
719-783-3034
Office hours
Monday through Thursday, 7:30 a.m. to 4:30 p.m. (Building & Zoning page); the Residential Building Permit Packet's inspection-request instructions separately list Monday-Thursday 8:00 a.m.-5:00 p.m. at Town Hall — both ranges are published by the Town on different documents and are reproduced here rather than reconciled. Town Hall general line 719-783-2651 (per excavation/driveway permit forms) in addition to the Building & Zoning direct line 719-783-3034. Current Building & Zoning Official listed as Chris McKellip on the live webpage; the downloadable Building Permit Application PDF (dated 10/2023) lists a prior official, Isaac Selden (cell 719-371-8215); the Residential/Commercial code packets (also on file) list a still-earlier official, Roger Camper — reflecting Silver Cliff's very small-town staff turnover. The live webpage listing is treated as current.

Inspection sequence

Applies to: Commercial Building Permit

  1. 1

    Footing

    Rebar in place, concrete chairs and ties in place

  2. 2

    Foundation

    Rebar in place and tied

  3. 3

    State Rough Electrical and Plumbing

    Performed by the State of Colorado; Ufer ground in place

  4. 4

    Mechanical Rough

    Vents, gas pipe, ducts, and radiant heat lines

  5. 5

    Structural Framing

  6. 6

    Ventilation

  7. 7

    Roofing

  8. 8

    Insulation

  9. 9

    Siding or Stucco

  10. 10

    Drainage

  11. 11

    Drywall Nail/Screw Inspection

  12. 12

    Fire Inspection

    Fire inspection on commercial buildings

  13. 13

    ADA Compliance

  14. 14

    Parking Lot or Spaces

  15. 15

    Fire Code Compliance

  16. 16

    Final Inspection

Applies to: Residential Building Permit (New Construction)

  1. 1

    Footing and Foundation

    After excavation for footings complete and required reinforcing steel in place; forms in place for concrete foundations

  2. 2

    State Rough Electrical and Plumbing

    Performed by the State of Colorado (State Electrical Board / State Plumbing Board), not the Town; Ufer ground must be in place

  3. 3

    Framing

    After roof deck/sheathing, all framing, fire blocking and bracing in place; rough electrical, plumbing, heating wires, pipes and ducts approved

  4. 4

    Energy Efficiency Inspection

    Envelope insulation R/U values, fenestration U value, duct system R value, HVAC and water-heating equipment efficiency per the 2006 Minimum Energy Efficiency Requirements

  5. 5

    Final Inspection

    After all work required by the building permit is completed; required before a Certificate of Occupancy is issued

Applies to: Residential Addition / Alteration / Repair Permit

  1. 1

    Framing / Structural (as applicable to scope)

    Required only where the addition or alteration scope involves framing changes

  2. 2

    State Rough Electrical and Plumbing (as applicable to scope)

    Required only where the scope involves electrical or plumbing systems; performed by the State of Colorado

  3. 3

    Final Inspection

    Required for all permitted work upon completion

Applies to: Electrical Permit (State of Colorado)

  1. 1

    State Rough Electrical

    Performed by the State of Colorado (State Electrical Board); Ufer ground must be in place per the Town's own commercial permit requirements

  2. 2

    State Final Electrical

    Performed by the State of Colorado

Applies to: EV Charger / EVSE Permit

  1. 1

    State Rough/Final Electrical

    Performed by the State of Colorado (State Electrical Board) for the charging circuit

  2. 2

    Town Final Inspection (if structural/mounting work was permitted)

Applies to: Plumbing Permit (State of Colorado)

  1. 1

    State Rough Plumbing

    Performed by the State of Colorado (State Plumbing Board)

  2. 2

    State Final Plumbing

    Performed by the State of Colorado

Applies to: Roofing Permit (Re-Roof)

  1. 1

    Roofing Inspection

    Listed as a standard required inspection in both the residential (implicit, per 'Roof Plan' submittal) and commercial (explicit line-item) permit packets

  2. 2

    Final Inspection

Applies to: Solar Permit

  1. 1

    State Rough Electrical

    Electrical connection/interconnection work inspected by the State of Colorado

  2. 2

    Final Inspection

    Town final inspection of mounting/structural elements

Final inspection only: Demolition Permit

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Silver Cliff building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Silver Cliff building permits

Get alerts for Silver Cliff

We'll email you when Silver Cliff's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.