Skip to main content
PermitBase

Roofing Permit (Re-Roof) in Silver Cliff, Colorado

Required for re-roofing work in the Town of Silver Cliff, applied for on the same combined Building Permit Application form under the 'Roof' checkbox. Reviewed under the 2006 IRC/IBC as adopted, with the Town's local design criteria (residential: 40 psf snow load; commercial: 50 psf snow load) governing structural/roofing requirements.

Verified 2026-07-06 · Source

When you need this permit

  • Applied for on the combined Building Permit Application ('Roof' box checked)
  • Roofing material and sheathing must meet the applicable residential or commercial structural design criteria on file with the Town
  • Roofing inspection is one of the standard required inspections under both the residential and commercial permit packets

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit FeeNo published fee schedule located; billed under the general Building Permit fee line-item on the application form. Confirm with the Building & Zoning Office (719-783-3034).
Not published — contact the department
3% Silver Cliff Use TaxApplies if materials were purchased without Silver Cliff sales tax being charged
3% of roofing materials value where local sales tax was not paid

Review timeline

Plan review
Not published — contact the department

How long did your Roofing Permit (Re-Roof) permit actually take in Silver Cliff?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Roofing Inspection

    Listed as a standard required inspection in both the residential (implicit, per 'Roof Plan' submittal) and commercial (explicit line-item) permit packets

  2. 2

    Final Inspection

See the full Silver Cliff inspection guide — scheduling & re-inspection fees →

Tips

  • A Roof Plan is a required submittal item on the Residential Plans checklist even for a straightforward re-roof — don't assume re-roofs are exempt from the plans checklist.

Frequently asked questions

Silver Cliff requires a roofing permit (re-roof) for: Applied for on the combined Building Permit Application ('Roof' box checked); Roofing material and sheathing must meet the applicable residential or commercial structural design criteria on file with the Town; Roofing inspection is one of the standard required inspections under both the residential and commercial permit packets. If your project isn't listed, confirm with Town of Silver Cliff Building & Zoning Department at 719-783-3034 before starting work.

Silver Cliff does not publish a plan-review timeline for this permit. Contact Town of Silver Cliff Building & Zoning Department at 719-783-3034 for current turnaround.

You'll need: Building Permit Application (Jurisdiction of Silver Cliff). See the required-documents checklist on this page for details on each.

Silver Cliff requires 2 inspection(s) for a roofing permit (re-roof), in order: Roofing Inspection, Final Inspection. Schedule each through Town of Silver Cliff Building & Zoning Department (719-783-3034).

Apply through Town of Silver Cliff Building & Zoning Department at 612 E. Main Street, Silver Cliff, CO 81252 (mailing: PO Box 154, Silver Cliff, CO 81252). Phone: 719-783-3034, email: bzofficial@silvercliffco.com. Office hours: Monday through Thursday, 7:30 a.m. to 4:30 p.m. (Building & Zoning page); the Residential Building Permit Packet's inspection-request instructions separately list Monday-Thursday 8:00 a.m.-5:00 p.m. at Town Hall — both ranges are published by the Town on different documents and are reproduced here rather than reconciled. Town Hall general line 719-783-2651 (per excavation/driveway permit forms) in addition to the Building & Zoning direct line 719-783-3034. Current Building & Zoning Official listed as Chris McKellip on the live webpage; the downloadable Building Permit Application PDF (dated 10/2023) lists a prior official, Isaac Selden (cell 719-371-8215); the Residential/Commercial code packets (also on file) list a still-earlier official, Roger Camper — reflecting Silver Cliff's very small-town staff turnover. The live webpage listing is treated as current.. Official information: https://www.silvercliffco.com/1201/Building-Zoning.

Silver Cliff, Colorado has adopted: 2006 International Building Code (IBC) — Town of Silver Cliff, 'Building Code of the Town of Silver Cliff' (Section 101.1), per the Town's downloadable 2006 International Commercial Building Code document; 2006 International Residential Code (IRC) — 'Residential Code for One- and Two-family Dwellings of the Town of Silver Cliff' (Section R101.1), per the Town's downloadable 2006 International Residential Code document; 2018 International Zoning Code — per the Town's Building & Zoning webpage summary listing; Referenced codes incorporated by the 2006 Commercial code (Section 101.4): ICC Electrical Code (installation of electrical systems); International Fuel Gas Code (gas piping/appliances); International Mechanical Code; International Plumbing Code (including International Private Sewage Disposal Code for private sewage disposal systems); International Property Maintenance Code (existing structures); International Fire Code (fire prevention); International Energy Conservation Code (energy efficiency design/construction, 2006 edition — see local energy-efficiency requirements below); Note on code currency: both the Residential and Commercial permit packets on file are 2006-cycle documents; the Town's live Building & Zoning webpage (fetched 2026-07-06) independently confirms '2006 International Building Codes' and '2006 International Residential Code' as currently listed and does not reference any later cycle — this is treated as the governing, currently-adopted edition for this file rather than assumed to have silently updated, since both the live webpage and the downloadable code packets agree on the 2006 cycle (unlike larger jurisdictions in this corpus where a live page and a static PDF have been observed to disagree).. Local amendments apply — see the Silver Cliff overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Silver Cliff building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.