EV Charger / EVSE Permit in Silver Cliff, Colorado

Silver Cliff has no distinct electric-vehicle-charging-station permit type or fee line-item. Installation of an EV charging station (EVSE) is treated as electrical work: the charging circuit/panel work is permitted and inspected by the State of Colorado (State Electrical Board, DORA) exactly as with all other electrical work in Town (see the Electrical Permit entry in this file), and any associated structural/mounting work is filed on the Town's combined Building Permit Application under the 'Alteration' checkbox — the same form used for Solar, which likewise has no dedicated fee beyond its own 'Solar' line-item. Silver Cliff's population (609, 2020 Census) is far below the 10,000-population threshold that triggers Colorado HB24-1173's mandatory EV-charger permitting standards and 3-business-day decision timeline for municipalities, so the Town is not a 'covered municipal permitting agency' required to adopt a model EV-charger permit code or distinct review process under that law. The State's own Electrical Permit Application/Fee Schedule (DORA, State Electrical Board, effective 5/15/2019 — the most recent version located and still the operative published schedule) shows an EV charger circuit, which is not 'enclosed living area,' is billed under the State's Table B ('Commercial and other fees,' i.e. installations not based on square footage) at a $90.00 base fee for a job valuation of $2,000 or less, plus $8.00 per additional $1,000 of valuation (rounded up), payable to the State of Colorado — not the Town.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical permit for the EV charging circuit/panel work obtained directly from the Colorado State Electrical Board (DORA), not the Town of Silver Cliff — same authority split as all other electrical work in Town
  • If structural/mounting work is involved (e.g., new conduit run, panel upgrade requiring wall penetration), file the Town's combined Building Permit Application with the 'Alteration' box checked
  • No Town of Silver Cliff document (Building & Zoning webpage, Residential or Commercial Permit Packets, Building Permit Application form) contains an 'EV,' 'EVSE,' or 'Electric Vehicle' checkbox or fee line, confirmed by direct review of the same application form referenced in this file's Solar Permit entry
  • Silver Cliff (2020 Census population 609) is below the 10,000-population municipal threshold in Colorado HB24-1173 (effective 8/7/2024), so the Town is not among the 'covered municipal permitting agencies' required by 12/31/2025 to adopt a model EV-charger permit code, custom objective standards, or the 3-business-day approve/deny decision timeline

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

State Electrical Permit Fee (EV charger circuit — Table B, 'Commercial and other fees,' since a charger circuit is not enclosed living area)State of Colorado, Division of Professions and Occupations, State Electrical Board — Electrical Permit Application, Fee Schedule effective 5/15/2019 (Section B). No dedicated EV/EVSE line item; this is the applicable valuation-based tier for a standalone charger circuit. Fees are reviewed occasionally per DORA and subject to change; no update to this schedule was found as of the State Electrical Board's most recent rule revisions (3 CCR 710-1, adopted 1/28/2026).
$90.00 base fee for job valuation ≤ $2,000, plus $8.00 per additional $1,000 of valuation (rounded up to the next $1,000)
Town Building Permit / Alteration Fee (if structural work involved)No published fee schedule located for Town building permits generally (see Building Permit Fee note on the Residential Building Permit entry); confirm with the Building & Zoning Office (719-783-3034).
Not published — contact the department

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Silver Cliff?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    State Rough/Final Electrical

    Performed by the State of Colorado (State Electrical Board) for the charging circuit

  2. 2

    Town Final Inspection (if structural/mounting work was permitted)

See the full Silver Cliff inspection guide — scheduling & re-inspection fees →

Tips

  • Silver Cliff does not publish an EV-specific permit or fee — treat an EV charger install the same way you'd treat any other electrical circuit addition: get the State of Colorado electrical permit (DORA) for the wiring, and only involve the Town if you're doing structural/mounting work that needs an 'Alteration' building permit.
  • The State's own Electrical Permit fee schedule (effective 5/15/2019) bills a standalone charger circuit under its valuation-based 'Commercial and other fees' table: $90 for a job valued at $2,000 or less, plus $8 per additional $1,000 of valuation — pay this to the State of Colorado, not the Town.
  • Because Silver Cliff is far under HB24-1173's 10,000-population threshold, don't expect the fast-tracked, standardized EV-charger review process that Colorado's larger cities are now required to offer — confirm directly with the Building & Zoning Office (719-783-3034) how they want an EV charger application handled.

Frequently asked questions

Silver Cliff requires an ev charger / evse permit for: Electrical permit for the EV charging circuit/panel work obtained directly from the Colorado State Electrical Board (DORA), not the Town of Silver Cliff — same authority split as all other electrical work in Town; If structural/mounting work is involved (e.g., new conduit run, panel upgrade requiring wall penetration), file the Town's combined Building Permit Application with the 'Alteration' box checked; No Town of Silver Cliff document (Building & Zoning webpage, Residential or Commercial Permit Packets, Building Permit Application form) contains an 'EV,' 'EVSE,' or 'Electric Vehicle' checkbox or fee line, confirmed by direct review of the same application form referenced in this file's Solar Permit entry; Silver Cliff (2020 Census population 609) is below the 10,000-population municipal threshold in Colorado HB24-1173 (effective 8/7/2024), so the Town is not among the 'covered municipal permitting agencies' required by 12/31/2025 to adopt a model EV-charger permit code, custom objective standards, or the 3-business-day approve/deny decision timeline. If your project isn't listed, confirm with Town of Silver Cliff Building & Zoning Department at 719-783-3034 before starting work.

In Silver Cliff, the published State Electrical Permit Fee (EV charger circuit — Table B, 'Commercial and other fees,' since a charger circuit is not enclosed living area) is: $90.00 base fee for job valuation ≤ $2,000, plus $8.00 per additional $1,000 of valuation (rounded up to the next $1,000). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Silver Cliff does not publish a plan-review timeline for this permit. Contact Town of Silver Cliff Building & Zoning Department at 719-783-3034 for current turnaround.

You'll need: Colorado State Electrical Permit. Depending on your project, Silver Cliff may also ask for: Building Permit Application (Jurisdiction of Silver Cliff). See the required-documents checklist on this page for details on each.

Silver Cliff requires 2 inspection(s) for an ev charger / evse permit, in order: State Rough/Final Electrical, Town Final Inspection (if structural/mounting work was permitted). Schedule each through Town of Silver Cliff Building & Zoning Department (719-783-3034).

Apply through Town of Silver Cliff Building & Zoning Department at 612 E. Main Street, Silver Cliff, CO 81252 (mailing: PO Box 154, Silver Cliff, CO 81252). Phone: 719-783-3034, email: bzofficial@silvercliffco.com. Office hours: Monday through Thursday, 7:30 a.m. to 4:30 p.m. (Building & Zoning page); the Residential Building Permit Packet's inspection-request instructions separately list Monday-Thursday 8:00 a.m.-5:00 p.m. at Town Hall — both ranges are published by the Town on different documents and are reproduced here rather than reconciled. Town Hall general line 719-783-2651 (per excavation/driveway permit forms) in addition to the Building & Zoning direct line 719-783-3034. Current Building & Zoning Official listed as Chris McKellip on the live webpage; the downloadable Building Permit Application PDF (dated 10/2023) lists a prior official, Isaac Selden (cell 719-371-8215); the Residential/Commercial code packets (also on file) list a still-earlier official, Roger Camper — reflecting Silver Cliff's very small-town staff turnover. The live webpage listing is treated as current.. Official information: https://www.silvercliffco.com/1201/Building-Zoning.

No. The Town's Building Permit Application form has no EV/EVSE checkbox or fee line. The charging circuit itself is permitted through the Colorado State Electrical Board (DORA), the same authority that handles all other electrical work in Silver Cliff; any structural/mounting work would be filed under the Town's general 'Alteration' permit category.

No. HB24-1173 (effective 8/7/2024) only covers counties with 20,000+ population and municipalities with 10,000+ population. Silver Cliff's 2020 Census population is 609, well under that threshold, so the Town is not required to adopt the state's model EV-charger permit code or its 3-business-day decision timeline.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Silver Cliff building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.