Florence building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Florence, Colorado.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- Florence Municipal Center, 600 West 3rd Street, Florence, CO 81226
- Phone
- (719) 784-4848
- Office hours
- Main City Hall line (719) 784-4848 (option 6 reaches the Building Inspector directly); Fax (719) 784-0228. Building Inspector: David Wales, David.Wales@florencecolorado.org. Permit applications and supporting documents may also be submitted to john.vernetti@florencecolorado.org per the Building Permits page.
- Website
- Official site
Published scheduling rules
- Florence's own Building Permits page contact for permit submission is listed as john.vernetti@florencecolorado.org, while the Building Department's general contact is David Wales (Building Inspector) at building@florencecolorado.org / David.Wales@florencecolorado.org — both may be relevant depending on whether the inquiry is about submittal logistics or inspection scheduling. (General)
Inspection sequence
Applies to: Commercial / Industrial / Multi-Family Tenant Improvement Permit
- 1
Foundation
Per engineered, site-specific foundation plan
- 2
Framing
Structural framing per stamped architect/engineer plans
- 3
Final Inspection
All work complete per approved plans and applicable codes
Applies to: Deck / Covered Patio Permit
- 1
Footing/Foundation
Before concrete pour, if new footings are required
- 2
Framing
Deck/patio framing, ledger connection, and guardrail/handrail framing before cover or final
- 3
Final Inspection
Completed structure inspected for compliance with the 2006 IBC as adopted
Applies to: Residential Addition / Remodel Permit
- 1
Foundation (additions with new footings only)
Before concrete pour, per engineered foundation plan
- 2
Framing
Framing complete, connection to existing structure verified
- 3
Final Inspection
All work complete per approved plans
Applies to: Residential Building Permit (New Construction)
- 1
Foundation
Before concrete pour; foundation must match the engineered, site-specific foundation plan
- 2
Framing
Structural framing complete before cover, per approved floor/roof framing plans
- 3
Final Inspection
All work complete per approved plans and the 2006 IBC/IECC as adopted; scheduled by phone at (719) 784-4848
Applies to: Mechanical / HVAC Permit
- 1
Rough Mechanical
Ductwork, venting, and equipment placement before concealment
- 2
Final Inspection
Equipment operational, combustion air and venting verified
Applies to: Rooftop Solar Photovoltaic Permit
- 1
Final Inspection (structural/mounting)
Racking and roof penetration/mounting verified by the City
- 2
State Electrical Inspection
Electrical interconnection and equipment inspected separately by DORA under the State Electrical Permit
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Florence building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Florence building permits
Get alerts for Florence
We'll email you when Florence's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.