Commercial / Industrial / Multi-Family Tenant Improvement Permit — Florence, Colorado · Requirements sheet
Reviewed 2026-08-02 · Source: https://www.cityofflorenceco.gov/files/8022dd6dc/Building+Information+Submittal+Checklist+(5).pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial / Industrial / Multi-Family Tenant Improvement Permit in Florence, Colorado
Required for commercial, industrial, and multi-family tenant improvement, alteration, or new construction projects in Florence. Requires plans prepared by a Colorado-licensed Architect or Engineer, and a separate off-street parking plan submitted to the City Planner.
Reviewed 2026-08-02 · Source
When you need this permit
- Construction plans must be prepared by a Colorado-licensed Architect or Engineer, with signed and dated stamp/seal
- Commercial, Industrial, Multi-Family Off-Street Parking Plan must be submitted to the City Planner for review and approval, showing parking access, number of handicap spaces, and paved surface type
- Same site plan, drainage, utility, and engineered foundation requirements as residential projects, scaled to the commercial scope
- Florence City Contractor's License (General, $100/yr) required for the general contractor Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
No published commercial-specific valuation fee schedule exists; Show full citationHide
No published commercial-specific valuation fee schedule exists; the permit is billed via the general Building Permit Application line items plus applicable use tax. Florence Municipal Code Section 15.04.050(A) (Title 15, hosted at library.municode.com) states verbatim: 'Building permit fees and inspection fees are established by Resolution of the City Council which is updated from time to time, and known as the composite fee schedule. The composite fee schedule is kept on file in the City Clerk's office.' The ordinance itself thus confirms the City has deliberately never codified a numeric building-fee table — it is delegated to a Council resolution held on file at the Clerk's office, not published online — and this delegation clause applies uniformly to all Title 15 building permits (commercial included), not just this permit type. The parallel Title 17 (Zoning) fee clause, Section 17.94.010, uses the identical delegation pattern for the Off-Street Parking Plan review fee this permit type separately requires: 'Fees for applications as described in this title shall be designated and amended from time to time by City Council resolution' — so the commercial-specific parking-plan fee is equally uncodified. The City's in-progress Citywide Fee Schedule consolidation (Ordinance No. 4-2026 / Resolution No. 8-2026) has not yet reached Building or Planning fees: the City Council's July 13, 2026 meeting agenda packet (cityofflorenceco.gov/files/f6c1bf896/7.13.26.pdf) includes June 15, 2026 minutes describing Resolution No. 8-2026 as 'a Resolution formally adopting the citywide Fee Schedule ("Exhibit A") to establish the municipal LIQUOR LICENSING, application, and processing fee structures' (City Clerk Huppe: 'represented the fee schedule with the newest liquor licensing fees included'), and no Building or Planning fee item appears anywhere in that 91-page packet. The consolidated fee schedule is being rolled out by the City in phases, and Building/Planning fees specifically have not yet been enacted into it — an active, in-progress administrative gap on the City's side.Review timeline
Inspection process
- 1
Foundation
Per engineered, site-specific foundation plan
- 2
Framing
Structural framing per stamped architect/engineer plans
- 3
Final Inspection
All work complete per approved plans and applicable codes
See the full Florence inspection guide — scheduling & re-inspection fees →
Tips
- Unlike residential permits, commercial/industrial/multi-family plans must be prepared and stamped by a Colorado-licensed Architect or Engineer — hand-drawn residential-style plans are not accepted for this permit type.
- Budget separate lead time for the Off-Street Parking Plan review, which goes to the City Planner rather than the Building Department.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-02.
Fee schedules
Applications & forms
Codes & ordinances
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Florence building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Florence.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Property Access
Florence's permit history is searchable by address
1,026 permits on record for Florence, 2021–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
Other permits in Florence
Commercial / Industrial / Multi-Family Tenant Improvement Permit in other cities
Compare commercial / industrial / multi-family tenant improvement permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Florence project checklist
Describe your project once and get every permit, document, and fee it triggers in Florence — in one checklist. Free, for any city and any number of projects.
Get started →