Skip to main content
PermitBase

Commercial / Industrial / Multi-Family Tenant Improvement Permit in Florence, Colorado

Required for commercial, industrial, and multi-family tenant improvement, alteration, or new construction projects in Florence. Requires plans prepared by a Colorado-licensed Architect or Engineer, and a separate off-street parking plan submitted to the City Planner.

Reviewed 2026-07-06 · Source

When you need this permit

  • Construction plans must be prepared by a Colorado-licensed Architect or Engineer, with signed and dated stamp/seal
  • Commercial, Industrial, Multi-Family Off-Street Parking Plan must be submitted to the City Planner for review and approval, showing parking access, number of handicap spaces, and paved surface type
  • Same site plan, drainage, utility, and engineered foundation requirements as residential projects, scaled to the commercial scope
  • Florence City Contractor's License (General, $100/yr) required for the general contractor Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plan Check Fee / Building Permit FeeNo published commercial-specific valuation fee schedule found; billed via the general Building Permit Application line items plus applicable use tax
Not published as a numeric table
Fremont County + Florence City Use Tax
5% combined (2.5% + 2.5%) of the City's valuation of work

Review timeline

Plan review
Not published — contact the department

How long did your Commercial / Industrial / Multi-Family Tenant Improvement Permit permit actually take in Florence?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation

    Per engineered, site-specific foundation plan

  2. 2

    Framing

    Structural framing per stamped architect/engineer plans

  3. 3

    Final Inspection

    All work complete per approved plans and applicable codes

See the full Florence inspection guide — scheduling & re-inspection fees →

Tips

  • Unlike residential permits, commercial/industrial/multi-family plans must be prepared and stamped by a Colorado-licensed Architect or Engineer — hand-drawn residential-style plans are not accepted for this permit type.
  • Budget separate lead time for the Off-Street Parking Plan review, which goes to the City Planner rather than the Building Department.

Frequently asked questions

Florence requires a commercial / industrial / multi-family tenant improvement permit for: Construction plans must be prepared by a Colorado-licensed Architect or Engineer, with signed and dated stamp/seal; Commercial, Industrial, Multi-Family Off-Street Parking Plan must be submitted to the City Planner for review and approval, showing parking access, number of handicap spaces, and paved surface type; Same site plan, drainage, utility, and engineered foundation requirements as residential projects, scaled to the commercial scope; Florence City Contractor's License (General, $100/yr) required for the general contractor. If your project isn't listed, confirm with City of Florence Building Department at (719) 784-4848 before starting work.

In Florence, the published Plan Check Fee / Building Permit Fee is: Not published as a numeric table. Additional published fees: Fremont County + Florence City Use Tax — 5% combined (2.5% + 2.5%) of the City's valuation of work. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Florence does not publish a plan-review timeline for this permit. Contact City of Florence Building Department at (719) 784-4848 for current turnaround.

You'll need: Building Permit Application; Stamped Architectural/Engineering Plans; Off-Street Parking Plan. See the required-documents checklist on this page for details on each.

Florence requires 3 inspection(s) for a commercial / industrial / multi-family tenant improvement permit, in order: Foundation, Framing, Final Inspection. Schedule each through City of Florence Building Department ((719) 784-4848).

Apply through City of Florence Building Department at Florence Municipal Center, 600 West 3rd Street, Florence, CO 81226. Phone: (719) 784-4848, email: building@florencecolorado.org. Office hours: Main City Hall line (719) 784-4848 (option 6 reaches the Building Inspector directly); Fax (719) 784-0228. Building Inspector: David Wales, David.Wales@florencecolorado.org. Permit applications and supporting documents may also be submitted to john.vernetti@florencecolorado.org per the Building Permits page.. Official information: https://www.cityofflorenceco.gov/building-department.

Florence, Colorado has adopted: 2006 International Building Code (IBC) — City of Florence Building Department page states plainly: 'The City of Florence follows the 2006 International Building Code'; 2006 International Energy Conservation Code (IECC) — per the Building Permit Application Submittal Checklist (PDF): 'Energy Code – City of Florence adopts the 2006 Edition of the International Energy Conservation Code'; Florence Municipal Code Title 15 (Buildings and Construction), Section 15.04.040: 'The requirement for obtaining building permits relative to the construction, alteration, moving, demolition, repair, maintenance, and use of any building or structure within the City of Florence shall be governed by the most recent adopted edition of the appropriate adopted codes and building standards, including amendments thereto.' Per Municode search indexing of Title 15, Chapter 15.08 (amendments) is where local amendments to the 2006 IBC are set forth (Section 15.08.010).; Electrical: 2023 National Electrical Code (NEC) — administered by the State of Colorado, NOT the City (see localAmendments). Source: City of Florence Building Department page, linking to the Colorado Division of Professions and Occupations (DORA) Electrical Board page, which states the current adopted edition as the 2023 NEC.; Plumbing: 2021 (Colorado) Plumbing Code — administered by the State of Colorado, NOT the City. Source: City of Florence Building Department page, linking to the DORA Plumbing Board page, which lists the 2021 edition.; No separate local IRC, IMC, IFGC, or IFC edition is published by the City on its Building Department or Building Permits pages, or in the Building Permit Application Submittal Checklist — only the 2006 IBC (general building code) and 2006 IECC (energy code) are explicitly named by the City itself. The zero-tolerance policy governing this corpus prohibits inferring an IRC/IMC/IFGC/IFC edition the City has not itself published; note this as a gap rather than assuming a matching 2006 cycle for the unlisted codes.; HB22-1362 (Colorado statewide energy code floor, effective for jurisdictions adopting/updating codes on specified triggers starting July 2023 for larger jurisdictions and July 2026 for smaller ones) does not appear reflected on the City's Building Department page or Submittal Checklist, both of which still affirmatively state the 2006 IECC as current and were the live, actively-maintained pages as of this review (2026-07-06) — checked directly, no updated energy code notice found. Flagged honestly rather than assumed; Florence's population (under the HB22-1362 tiered compliance triggers) and its home-rule status both bear on whether/when the floor applies, but the City has not published any code update reflecting it as of this review.. Local amendments apply — see the Florence overview page for the full list.

No. The Submittal Checklist requires Commercial, Industrial, and Multi-Family construction plans to be prepared by an Architect or Engineer, with a signed and dated stamp/seal — hand-drawn plans are only accepted for residential permits.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Florence building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Florence.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.