Change of Use / Change of Occupancy — Florence, Colorado · Requirements sheet
Reviewed 2026-08-13 · Source: https://library.municode.com/co/florence/codes/code_of_ordinances?nodeId=TIT15BUCO
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change of Use / Change of Occupancy in Florence, Colorado
Florence does not publish a standalone "Change of Use" or "Change of Occupancy" permit application — confirmed directly against the Building Permits page (which lists only the Building Permit Application, Submittal Checklist, and two structural-detail reference documents) and the Building Department page. A change of use or occupancy classification is instead governed by the City's own adopted 2006 International Existing Building Code (IEBC), per Florence Municipal Code § 15.08.050 (Amendments to the 2006 Edition, International Existing Building Code) — read in full via Municode, this local amendment section does NOT modify IEBC Chapter 10 (Change of Occupancy), so that chapter applies as published by the ICC. Florence's own § 15.08.050 amendments separately add Section 101.9 (Public Toilet Facilities), which ties Certificate of Occupancy issuance directly to a use change: "No change of use shall be allowed to occur, nor Certificate of Occupancy shall be issued, for a building...where the use...includes one or more employees or the general public," unless the building has an accessible toilet room with lavatory sink available at all times it is occupied. A use/occupancy change is processed through the same general Building Permit Application used for all other Florence permit types.
Reviewed 2026-08-13 · Source
When you need this permit
- No standalone "Change of Use" or "Change of Occupancy" application exists — checked the Building Permits page (which lists only the Building Permit Application, Submittal Checklist, a monolithic-wall detail PDF, and a typical wall-section image) and the Building Department page directly
- Governed by the City's own adopted 2006 International Existing Building Code (IEBC), per Florence Municipal Code § 15.08.050 — this local amendment section does not modify IEBC Chapter 10 (Change of Occupancy), so Chapter 10 governs as published by the ICC
- Florence Municipal Code § 15.08.050(B) adds Section 101.9 (Public Toilet Facilities) to the adopted IEBC: no change of use may occur, and no Certificate of Occupancy may be issued, for a building with one or more employees or the general public unless there exists within the building an accessible toilet room with lavatory sink, open for employee/customer use at all times the building is occupied
- Applied for using the same general Building Permit Application used for every Florence permit type — the form's "Describe Work" checkboxes (New Construction, Addition, Alteration, Repair, Move, Remove) do not include a dedicated "Change of Use" box; the form separately records "Occupancy Group/Division"
- The Building Permit Application's "Special Approvals" routing table (Fire Department, Water Source, Sewage Disposal, Special Use, Other) applies to change-of-use projects the same as it does to any other building permit
- Florence no longer requires a general City business license, per Colorado SB 22-0322 (effective July 1, 2022), which bars a local taxing jurisdiction from charging a general-business-license fee to a retailer holding a state standard retail license — confirmed directly on the City's own Businesses page; most use changes will not additionally require a separate City business-license application
- Where alteration or construction work accompanies the use change, the standard Building Permit Application, Submittal Checklist requirements, and applicable fees (2.5% Fremont County + 2.5% Florence City use tax, Plan Check Fee, Building Permit Fee) apply as documented in this file's residential-addition-remodel permit-type entry
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Inspection / Certificate of Occupancy
The space may not be occupied under the new use until a final inspection is complete and a Certificate of Occupancy is issued; per Florence Municipal Code § 15.08.050(B) (Section 101.9), issuance is additionally conditioned on the building having an accessible toilet room with lavatory sink if it will have employees or the general public present
See the full Florence inspection guide — scheduling & re-inspection fees →
Tips
- Florence's own 2006 IEBC amendments (§ 15.08.050) add a distinctive Section 101.9 "Public Toilet Facilities" clause tying Certificate of Occupancy issuance directly to a change of use — confirm your space has a qualifying, accessible toilet room before assuming a use change is otherwise ready to close out.
- Florence has no dedicated change-of-use form — call the Building Department (719-784-4848, option 6) before assuming your project needs (or doesn't need) construction-level review; the correct path depends on whether the new use triggers IEBC Chapter 10 alteration/occupancy requirements.
- Since 2022 (Colorado SB 22-0322), most Florence businesses do not need a separate City business license — but this building-code change-of-use/occupancy review is still required and is unrelated to business licensing.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Florence building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Florence
Change of Use / Change of Occupancy in other cities
Compare change of use / change of occupancy fees across Colorado →
Look up this fee in a different city →
Now live
Build your Florence project checklist
Describe your project once and get every permit, document, and fee it triggers in Florence — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →