Durango building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Durango, Colorado.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 949 E 2nd Avenue, Durango, CO 81301
- Phone
- 970-375-5000
- Office hours
- Not published on the Building Division pages as of the last verification; main City Hall line 970-375-5000. General building-permit questions: Building@DurangoCo.Gov. Fee-schedule calculation questions: 970-375-4850.
- Website
- Official site
Inspection sequence
Applies to: Commercial Building Permit (New Construction / Addition / Remodel)
- 1
Foundation
Before concrete pour
- 2
Rough Framing
Structural framing complete before cover
- 3
Rough Plumbing / Mechanical
City-inspected trade rough-ins before concealment; electrical rough-in is inspected separately by the State of Colorado Electrical Board, and fire alarm/sprinkler systems by DFPD
- 4
Final Inspection
All City-permitted work complete per approved plans; separate state electrical final and DFPD life-safety sign-offs are also required before occupancy
Applies to: Residential Addition / Remodel Permit
- 1
Foundation (if new footings)
Before concrete pour, for additions with new foundation elements
- 2
Rough Framing
Framing complete and tied into existing structure before cover
- 3
Rough Plumbing / Mechanical
Trade rough-ins before concealment; electrical rough-in is inspected separately by the State of Colorado Electrical Board, not the City
- 4
Final Inspection
All City-permitted work complete per approved plans
Applies to: Residential Building Permit (New Single-Family Residence or Duplex)
- 1
Foundation
Before concrete pour
- 2
Rough Framing
Structural framing complete before cover
- 3
Rough Plumbing / Mechanical
Trade rough-ins before concealment (plumbing and mechanical are inspected by the City; electrical rough-in is inspected separately by the State of Colorado Electrical Board)
- 4
Final Inspection
All City-permitted work (building, plumbing, mechanical) complete per approved plans and applicable codes; a separate final electrical inspection and sign-off is required from the State of Colorado Electrical Board before occupancy
Applies to: Commercial Tenant Improvement / Tenant Finish Permit
- 1
Rough Framing (interior partitions)
New interior walls and structural modifications before cover
- 2
Rough Plumbing / Mechanical
City-inspected trade rough-ins before concealment; electrical rough-in is inspected separately by the State of Colorado Electrical Board, and fire alarm/sprinkler modifications by DFPD
- 3
Final Inspection
All City-permitted work complete per approved plans; separate state electrical final and DFPD life-safety sign-offs also required before the space opens
Applies to: Plumbing / Gas Line Permit
- 1
Rough Plumbing
Pipe, drain, waste, and vent installation before concealment
- 2
Gas Line Pressure Test
City-completed inspection verifying the gas line holds pressure before the gas provider will connect service
- 3
Final Inspection
Fixtures connected, no leaks, proper venting verified
Applies to: EV Charger / EVSE Permit (State of Colorado Electrical Board)
- 1
Rough-In
Wiring and conduit installed before walls closed (if applicable)
- 2
Final
Charger circuit/unit installed, breaker sized correctly, energized
Applies to: Fire Sprinkler / Fire Alarm System Permit (Durango Fire Protection District)
- 1
Rough-In Inspection
Piping, wiring, and device placement inspected before concealment, per the governing system's DFPD plan review/permit
- 2
Acceptance Test / Final Inspection
System operational and code-compliant, verified by DFPD before the permit closes; water-tank installations specifically require an acceptance test per the DFPD fee schedule's own description of that permit type
Applies to: Mechanical / HVAC Permit
- 1
Rough Mechanical
Ductwork, flues, and equipment placement before concealment
- 2
Final Inspection
Equipment operational, combustion air and venting verified
Final inspection only: Change of Use Application, Demolition Permit, Fence / Retaining Wall Permit, Roofing Permit (Roof Replacement), Sign Permit, Solar PV Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fee schedules
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Durango building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Durango building permits
Get alerts for Durango
We'll email you when Durango's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.