Sign Permit — Durango, Colorado · Requirements sheet
Verified 2026-08-13 · Source: https://www.durangoco.gov/651/Signs-Electioneering
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Durango, Colorado
Required to erect, construct, reconstruct, alter, or change most signs within Durango city limits and the Joint Planning Area, per Land Use and Development Code (LUDC) Article 3-6, Sec. 3-6-1-4 (Enforcement). Administered by the Planning Division within Community Development — a distinct review track from the Building Division, though both now run through the same OpenGov portal system adopted 07/08/2024. Dimensional standards (area, height, illumination, number of signs) vary substantially by zoning district under LUDC Division 3-6-5, and signs in the Downtown Overlay District (Main Avenue, Camino del Rio, East Second Avenue) carry additional Downtown Overlay Design Guidelines requirements. Fee is a flat $50, not the valuation-based Building Permit Fee schedule used for other permit types in this file.
Verified 2026-08-13 · Source
When you need this permit
- Unlawful to erect, construct, reconstruct, alter, or change any sign without first obtaining a sign permit or applicable exemption, per LUDC Sec. 3-6-1-4
- Signs requiring a permit (LUDC Sec. 3-6-4-1, Permanent Signs): Awning, Canopy, Marquee, Monument, Projecting, and Wall signs
- Signs allowed WITHOUT a permit (LUDC Sec. 3-6-4-2, Temporary Signs): Site Signs and Yard Signs on private property (dimension caps by zone, see fees/notes); Banners require registration only (not a permit) — one per business, max 3 times per calendar year, max 28 consecutive days per display, prohibited from attachment to vegetation or the public right-of-way
- Small Portable Signs (max 12 sq ft, 6 sq ft/side if double-sided, 4 ft height) are allowed without a permit on private property in non-residential zones, but require a permit if placed in the public right-of-way
- Dimensional standards vary sharply by zoning district (LUDC Division 3-6-5, Place-Based Sign Standards): Residential/Agricultural/Open Space/Public zones cap a permitted Monument Sign at 24 sq ft/5 ft height and a Wall Sign at 24 sq ft, indirect illumination only; Central Business (CB)/Mixed Use-Neighborhood (MU-N) zones allow 100 sq ft aggregate sign area per parcel (4 signs max) with external illumination only; Mixed Use-Arterial (MU-A) also caps aggregate area at 100 sq ft but allows internal (opaque-background) illumination; Commercial General (CG)/Commercial Regional (CR) and Business Park (BP)/Light Industrial (LI) zones allow 200 sq ft aggregate area with Monument Signs up to 100 sq ft and 12-20 ft height depending on zone
- No more than four (4) signs requiring a permit are allowed per parcel unless approved under an adopted Master Sign Program ($250 fee)
- Illumination rules (LUDC Sec. 3-6-3-3): external light fixtures must be downcast and shielded; sign design must comply with Dark Sky Friendly principles; internal illumination is prohibited in the Central Business Zone, Mixed Use-Neighborhood Zone, and residential zones (including residential portions of PD zones); within the Main Avenue Historic District, neon is capped at 50% of allowable aggregate sign area (max 40 sq ft per parcel, max 15 sq ft per single sign) and requires Community Development Commission review/approval
- Signs in the Downtown Overlay District (Main Avenue, Camino del Rio, East Second Avenue) must additionally comply with the Downtown Overlay Design Guidelines (Chapter 9, Signs); signs elsewhere in the city must comply with the Commercial Use Design Guidelines (Chapter 6, Sign Design Guidelines)
- Political/electioneering signs: up to 12 sq ft aggregate area allowed without a permit indefinitely in residential zones; up to 48 sq ft allowed during the 30 days preceding an election; may not be located within 200 feet of any polling place; must be removed within 3 days after election day, with the candidate/placer responsible for removal
- Nonconforming signs must be brought into compliance with LUDC Article 3-6 when altered in a way requiring a permit, when no message is displayed for 60+ consecutive days, when damaged/destroyed beyond two-thirds of replacement value, or when the property is vacant 60+ days (LUDC Sec. 3-6-1-3)
- Signs meeting all applicable requirements can be approved administratively by the Planning Division, per the City's Applications/Permits page — no public hearing required for a standard compliant sign permit
- Projecting signs, awnings, and other sign elements located within the public right-of-way additionally require a Revocable Encroachment Permit (minor, $50), a distinct permit from the base sign permit, per the Community Development Department Planning Fees schedule
- Applications submitted via the City's OpenGov portal (durangoco.portal.opengov.com); a Pre-Application Meeting request often precedes formal submittal for planning-track applications generally
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Compliance Verification
Neither the LUDC Article 3-6 sections reviewed nor the Applications/Permits page describe a distinct post-installation field inspection separate from Planning Division application/plan review before permit approval — genuinely unresolved whether a standalone field inspection occurs for signs the way it does for building permits. Confirm directly with the Planning Division (970-375-4850) before assuming no field inspection applies.
See the full Durango inspection guide — scheduling & re-inspection fees →
Tips
- Durango's sign fee is a flat $50 regardless of sign size or type — a much simpler calculation than the valuation-based Building Permit Fee schedule used for building, mechanical, and plumbing permits in this file.
- Illumination rules differ sharply by zone: internal (opaque-background) illumination is allowed in Mixed Use-Arterial, Commercial General/Regional, and Business Park/Light Industrial zones, but is explicitly prohibited in the Central Business Zone, Mixed Use-Neighborhood Zone, and all residential zones — confirm your zone before designing an internally-lit sign.
- Within the Main Avenue Historic District, neon signage is capped at 50% of allowable aggregate sign area (40 sq ft max per parcel, 15 sq ft max per single sign) and requires separate Community Development Commission review — budget calendar time beyond the base sign permit if you're proposing neon downtown.
- No more than 4 signs requiring a permit are allowed per parcel — a business needing more than that must apply for a Master Sign Program ($250) rather than stacking individual sign permits.
- Sign elements in the public right-of-way (many projecting signs, awnings) need a SEPARATE Revocable Encroachment Permit ($50) in addition to the base Sign Permit — don't assume the base sign permit alone covers ROW placement.
- Political/electioneering signs have their own size and timing rules distinct from commercial signage: 12 sq ft aggregate without a permit indefinitely in residential zones, expanding to 48 sq ft only in the 30 days before an election, with mandatory removal within 3 days after election day.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Durango building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Durango
Sign Permit in other cities
Compare sign permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Durango project checklist
Describe your project once and get every permit, document, and fee it triggers in Durango — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →