EV Charger / EVSE Permit (State of Colorado Electrical Board) in Durango, Colorado
Installation of an electric vehicle charging station in Durango is electrical work and, like the photovoltaic/interconnection portion of a solar installation documented on this file's solar-pv-permit entry, is permitted directly by the State of Colorado Electrical Board (DORA), NOT the City of Durango Building Division. Under Colorado Revised Statutes § 12-23-117, electrical inspection is a matter of statewide concern: the state sets a uniform fee schedule, and a municipality may charge no more than 15% above the state's own fee — no local government may impose any other separate fee or charge related to electrical permits/inspections. The state's own valuation-based/square-footage-based electrical fee schedule has NO distinct 'EV charger,' 'electric vehicle,' or 'EVSE' line item; a dedicated Level 2 charger circuit is billed under the state's 'All other electrical fees' valuation-based tier (a flat $115 minimum plus $5.75 per $1,000 above $2,000 of installation value, per the fee schedule effective April 1, 2016 — Durango or a licensed contractor should confirm the current-year statewide figure directly with DORA, since the state revises this schedule periodically and only the mechanism, not the specific 2016 dollar amounts, is being relied on here).
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit issued by the Colorado State Electrical Board (DORA/DPO), not the City of Durango — apply online through DORA's electrical permit portal
- Confirmed directly against the State of Colorado's own Electrical Permit Fees schedule (mechanism fixed by C.R.S. § 12-23-117): no distinct EV-charger/EVSE fee line exists; a dedicated charger circuit not tied to new residential square footage is billed on the 'All other electrical fees' valuation-based tier
- Per C.R.S. § 12-23-117, the City of Durango may charge no more than 15% above the state's own electrical fee, and may not impose any additional separate fee or charge for electrical permits/inspections
- Work must be performed by a Colorado-licensed electrical contractor, or by a homeowner personally on their own residence under Colorado's homeowner exemption Owner-builder
- Confirm the current-year statewide fee figures directly with the State Electrical Board (303-894-7800, dora_electricalboard@state.co.us), since DORA revises the schedule periodically
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Wiring and conduit installed before walls closed (if applicable)
- 2
Final
Charger circuit/unit installed, breaker sized correctly, energized
See the full Durango inspection guide — scheduling & re-inspection fees →
Tips
- Do not apply for an EV charger permit through the City of Durango Building Division — like the electrical/interconnection portion of a solar installation, it is a State of Colorado Electrical Board permit, not a City permit.
- There is no distinct 'EV charger permit' anywhere in Colorado's statewide electrical fee schedule — a dedicated charger circuit not tied to new residential square footage is billed on the state's valuation-based 'All other electrical fees' tier.
- Under C.R.S. § 12-23-117, no local government (including Durango) may charge more than 15% above the state's own electrical fee, or impose any separate additional electrical permit fee — this caps what Durango could ever charge on top of the state fee even if it chose to add a local surcharge.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Durango building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Durango
EV Charger / EVSE Permit (State of Colorado Electrical Board) in other cities
Compare ev charger / evse permit (state of colorado electrical board) fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Durango project checklist
Describe your project once and get every permit, document, and fee it triggers in Durango — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →