Commercial Tenant Improvement / Alteration Permit — Town Planning Clearance + Mesa County Building Permit — Palisade, Colorado · Requirements sheet
Reviewed 2026-08-02 · Source: https://palisade.colorado.gov/sites/g/files/lrnvjt1146/files/documents/Comm%20Dev_1-Basic_Planning_Clearance_Fillable.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Tenant Improvement / Alteration Permit — Town Planning Clearance + Mesa County Building Permit in Palisade, Colorado
Permit pathway for tenant finishes, interior remodels, and alterations to existing commercial/non-residential space within the Town of Palisade. Mesa County does not publish a separately named 'tenant improvement' permit — TI work is permitted by the Mesa County Building Department as an 'Alteration to Commercial Building,' the identical mechanism already documented in this corpus's grand-junction.json (same issuing department, same fee schedule). On the Town side, a TI that does NOT change the scale, use, or character of the space falls under the Town of Palisade 'Basic Planning Clearance' ($10.00 flat fee) — the same clearance category and fee already documented in this file's residential-addition-remodel-reroof entry. Re-verified live 2026-08-02: the Basic Planning Clearance form text is NOT restricted to residential structures on its face ('reroof, residing, interior remodel, window replacement, demo, service upgrades, and/or similar actions which do not change the scale, use or character of a structure or land use'). A TI that changes the occupancy/use classification instead falls under the SAME form's separate 'Change of Use' line item ($50.00 flat fee).
Reviewed 2026-08-02 · Source
When you need this permit
- STEP 1 (concurrent Town prerequisite): For a tenant improvement/alteration that does NOT change the scale, use, or character of the space, submit a Town of Palisade 'Basic Planning Clearance' application ($10.00 flat fee) to the Community Development Department — the same form and fee category already documented for Palisade's residential remodel/reroof entry; the form's own text carries no occupancy-type restriction. Source: Town of Palisade 'PLANNING CLEARANCE: BASIC' application form (Comm Dev_1), re-fetched and verified live 2026-08-02.
- If the tenant improvement CHANGES the use/occupancy classification, the same Basic Planning Clearance form has a separate 'Change of Use' checkbox line item requiring a Letter of Intent (current use, proposed use, zoning) at a $50.00 flat fee, distinct from the $10.00 basic-work fee. Source: same form, verified live 2026-08-02.
- The Basic Planning Clearance form explicitly requires the 'Description of Work' to match the application submitted for the Mesa County building permit.
- STEP 2: Submit the Mesa County Building Department 'Application for Permit to Build.' Mesa County bills TI/alteration work on ACTUAL labor-and-material valuation (Table 2, Note 2 — 'The Total Valuation for remodels is the actual labor and material cost of the project'), not the Table 3A square-foot schedule used for new construction, and applies its 'Change in Use/Occupation Valuation Permit Fee' (Table 1A Fee #16: $50.00 under $2,000 valuation, Table 2 valuation-based above $2,000) when occupancy classification changes — figures independently re-verified against the Mesa County Building Department Fee Schedule PDF during this research pass, 2026-08-02, and mechanically identical to this corpus's grand-junction.json commercial-tenant-improvement-permit entry (same issuing department, same fee schedule).
- NOT INDEPENDENTLY CONFIRMED FOR PALISADE: whether Mesa County requires the same jurisdiction-specific clearances documented for Grand Junction TIs (Fire Department clearance for egress/alarm changes, Food Handling clearance for restaurant/grocery fit-outs, Persigo Waste Water Pre-Treatment for grease-generating tenants) for a Palisade property, and which fire authority and sewer/water provider serve Palisade specifically — not located or fetched in this research pass. Confirm directly with Mesa County Building Department (970-244-1631) and Town of Palisade Community Development (970-464-5602) at time of application.
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In (Framing, Electrical, Plumbing, Mechanical)
Trade rough-in inspections before cover on altered walls, ceilings, and systems; scheduled via the Mesa County Customer Portal, phone IVR (970-256-1564), or text (SCHEDULE to 844-987-4628). Mesa County publishes a detailed inspection sequence only for residential work — confirm the required commercial/TI inspection list at permit issuance
- 2
Final / Occupancy
Final building and trade inspections; where use/occupancy changed, occupancy sign-off reflects the new classification. Town of Palisade zoning sign-off confirming the completed work matches the approved Planning Clearance is also required, per LDC Section 4.08
See the full Palisade inspection guide — scheduling & re-inspection fees →
Tips
- The Town's Basic Planning Clearance description of work must match the Mesa County building permit application exactly — prepare both applications with identical scope descriptions to avoid delays.
- Confirm with the Town (970-464-5602) whether your specific TI counts as 'not changing the scale, use or character' ($10 Basic) or as a 'Change of Use' ($50) before applying — the Basic Planning Clearance form's own wording does not exclude commercial tenants, but the boundary between the two categories is a judgment call the Town makes, not something spelled out numerically on the form.
- Mesa County bills TI/alteration work on actual labor-and-material cost (not the Table 3A square-foot schedule used for new construction), and adds a Change in Use/Occupation fee on top if the tenant's use differs from the prior occupant's.
- No published review-timeline SLA exists at either step — call both offices directly for current queue length.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-02.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Palisade building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Palisade.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Palisade
Commercial Tenant Improvement / Alteration Permit — Town Planning Clearance + Mesa County Building Permit in other cities
Look up this fee in a different city →
Now live
Build your Palisade project checklist
Describe your project once and get every permit, document, and fee it triggers in Palisade — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →