Erie building inspections

Inspection sequence, scheduling, and re-inspection fees for building permits in Erie, Colorado.

Reviewed 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
645 Holbrook St., Erie, CO 80516 (mailing: P.O. Box 750, Erie, CO 80516)
Phone
303-926-2780
Office hours
Monday-Friday, 8 a.m.-5 p.m. Building Division fax/photo-submission line bldgfax@erieco.gov; HVAC/mechanical contact line 303-926-2700; Planning Division 303-926-2770 / planningdivision@erieco.gov.

Inspection sequence

Applies to: Residential Building Permit (New Single-Family / Custom Home / Modular Home)

  1. 1

    Foundation

    Before concrete pour, per engineer-stamped foundation plan

  2. 2

    Third-Party Engineer Observation (Foundation, Insulation, Radon, Energy Compliance)

    Third-party inspection reports required at these stages per Custom Home submittal requirements

  3. 3

    Temporary Power / Utilities

    Town inspection of temporary power and utility connections

  4. 4

    Framing / Rough Electrical / Rough Plumbing / Rough Mechanical

    Combined rough inspections; per the Town's Residential Remodel guidance, all rough inspections are typically completed at the same time

  5. 5

    Final Inspections (all trades) and Certificate of Occupancy

    All final inspections completed together; CO processed within 48 hours of a complete final submittal

Applies to: Commercial Building Permit (New Construction / Multifamily)

  1. 1

    Interim Trade Inspections (per permit inspection card)

    Inspections during construction are recorded on the permit inspection card (the original card must be returned as part of the CO package); the Town does not publish an itemized commercial rough-inspection sequence on its Commercial & Multifamily Projects page

  2. 2

    Final Inspections for Temporary Certificate of Occupancy (TCO)

    Must pass finals for: building, accessibility, mechanical, electrical, plumbing, building commissioning, Mountain View Fire Rescue, health department (if applicable), Planning, Public Works/Engineering, and Storm Water; special inspection reports submitted and Town Business License obtained

  3. 3

    Certificate of Occupancy (CO)

    Pass any re-inspections; provide original inspection card, backflow prevention test reports, HVAC balance report, and insulation certificates; accept stormwater post-construction requirements. A Land-Surveyor-stamped Improvement Survey Plat (ISP) is required prior to TCO or CO issuance. Allow 48 hours for TCO/CO processing

Applies to: Commercial Tenant Improvement / Tenant Finish Permit

  1. 1

    Interim Trade Inspections (per permit inspection card)

    Rough/cover inspections for the affected trades are recorded on the permit inspection card (returned as part of the CO package); the Town does not publish an itemized TI inspection sequence

  2. 2

    Final Inspections for TCO/CO

    Commercial finals per the Town's TCO checklist as applicable to the scope: building, accessibility, mechanical, electrical, plumbing, Mountain View Fire Rescue, health department (if applicable), and Planning; Town Business License required for TCO

  3. 3

    Certificate of Occupancy Processing

    Original inspection card, backflow prevention test reports, HVAC balance report, and insulation certificates as applicable; allow 48 hours for TCO/CO processing and give the Building Division 2 weeks advance notice

Applies to: Change of Use / Change of Ownership Permit

  1. 1

    Final Inspections for Temporary Certificate of Occupancy (TCO)

    Must pass finals for: building, accessibility, mechanical, electrical, plumbing, building commissioning, Mountain View Fire Rescue, health department (if applicable), Planning, Public Works/Engineering, and Storm Water; special inspection reports submitted and Town Business License obtained

  2. 2

    Certificate of Occupancy (CO)

    Pass any re-inspections; provide original inspection card, backflow prevention test reports, HVAC balance report, and insulation certificates as applicable; accept stormwater post-construction requirements. Allow 48 hours for TCO/CO processing once the submittal is complete

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Wiring and panel work inspected before concealment

  2. 2

    Final Inspection

    Devices installed and system verified

Applies to: EV Charger / EVSE Permit (Billed as Electrical Permit / Quick Permit)

  1. 1

    Rough Electrical

    Charger circuit wiring and breaker sizing inspected before concealment, if applicable

  2. 2

    Final Inspection

    EVSE installed, GFCI/disconnect and connections verified

Applies to: Fire Sprinkler and Fire Alarm System Permit

  1. 1

    Fire District Plan Review

    Mountain View Fire Rescue reviews fire protection and sprinkler/alarm plans under the adopted International Fire Code. The District's own form requires a minimum of 10 business days for this review, so submit early.

  2. 2

    Final Inspection / Fire Alarm Test

    On-site final inspection; all Fire Alarm Test Reports must be on site for Final Approval per MVFR's Application for Plan Review form

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork, flues, and equipment placement before concealment

  2. 2

    Final Inspection

    Standard in-person final inspection (the Town discontinued its earlier video-inspection option); verifies equipment operation, combustion air/venting, clearances, and detector compliance

Applies to: Plumbing Permit

  1. 1

    Rough Plumbing

    Pipe, drain, waste, and vent installation before concealment

  2. 2

    Final Inspection

    Fixtures connected, venting and connections verified

Applies to: Residential Addition / Remodel Permit

  1. 1

    Rough Inspections (Plumbing, Electric, Framing, Insulation)

    All rough inspections are typically completed at the same time, per the Town's Residential Remodel guidance

  2. 2

    Final Inspections (all trades)

    All final inspections are typically completed at the same time

Applies to: Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical and Frame Solar

    Residential rough solar inspection requires photos submitted by email (building@erieco.gov) rather than an in-person visit in most cases; JPGs or PDF only, 10-15 photos max, no ZIP files or cloud links; photos must show bonding, flashing, junction boxes, and full panel landscapes; typical photo-review turnaround is 2-3 business days

  2. 2

    Final Electrical, Building, and Electrical Service

    Final inspection covering electrical service connection and overall installation

Re-inspection fees

Fire Sprinkler and Fire Alarm System PermitReinspection of a failed inspection · Mountain View Fire Rescue Life Safety Division Fee Schedule, Inspection Service Billing Rates
$165.00/hour, one-hour minimum

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Erie building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Erie building permits

Get alerts for Erie

We'll email you when Erie's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.