Residential Building Permit (New Single-Family / Custom Home / Modular Home) in Erie, Colorado

Required for construction of new single-family homes (custom or production/modular) in Erie. Reviewed under the 2021 IRC/IBC as locally amended (Title 9), plus Planning Division Development Design Standards and Unified Development Code review. Issued and inspected by the Town of Erie Building Division via the Customer Self-Service Portal (eTRAKiT).

Verified 2026-07-06 · Source

When you need this permit

  • Building permit application signed by the General Contractor with all licensed subcontractors listed
  • Soils test report stamped by a Colorado engineering firm
  • Site-specific grading plan with contours, elevation points, and drainage specifications
  • Land Survey Plat and plot plan showing setbacks and easements (required for new builds effective September 3, 2025)
  • Architectural plans approved by the Planning Division
  • Engineer-stamped Foundation Plan and Structural Plan, based on the soils report
  • HVAC Manuals J, D, and S
  • Mountain View Fire Rescue approved plans and permit
  • Energy code compliance documentation (REScheck)
  • Stormwater permit and erosion control plan, if applicable
  • Floodplain development permit, if applicable
  • On-site wastewater system permit from county health department, if the property is not on Town sewer
  • HOA approval, if applicable
  • Total project valuation calculated per the Town's per-square-foot construction cost methodology (not applicant-stated cost): SFD above-grade finished area $169.09/sq ft, garage $66.20/sq ft, unfinished basement $31.50/sq ft

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — valuation $1 to $500Town of Erie Fee Schedule, effective per 2026 valuations memo
$23.50
Building Permit Fee — valuation $2,001 to $25,000
$69.25 for the first $2,000 plus $14.00 per $1,000 (or fraction) to $25,000
Building Permit Fee — valuation $25,001 to $50,000
$391.25 for the first $25,000 plus $10.10 per $1,000 to $50,000
Building Permit Fee — valuation $1,000,001 and up
$5,608.75 for the first $1,000,000 plus $3.15 per $1,000
Plan Check Fee
65% of the building permit fee; flat $75 for a site-specific single-family dwelling
SFD above-grade finished floor area (valuation basis)
$169.09 per square foot
SFD attached/detached garage floor area (valuation basis)
$66.20 per square foot
SFD below-grade (basement) unfinished floor area (valuation basis)
$31.50 per square foot
Town Use Tax + County Use TaxPer the Town's own 2026 fee memo; County rate applied is Boulder County's rate regardless of parcel's actual county
50% of total project valuation x (Town 3.5% + County 1.335%)

Review timeline

Plan reviewErie’s published plan-review target
20–30 business days

How long did your Residential Building Permit (New Single-Family / Custom Home / Modular Home) permit actually take in Erie?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation

    Before concrete pour, per engineer-stamped foundation plan

  2. 2

    Third-Party Engineer Observation (Foundation, Insulation, Radon, Energy Compliance)

    Third-party inspection reports required at these stages per Custom Home submittal requirements

  3. 3

    Temporary Power / Utilities

    Town inspection of temporary power and utility connections

  4. 4

    Framing / Rough Electrical / Rough Plumbing / Rough Mechanical

    Combined rough inspections; per the Town's Residential Remodel guidance, all rough inspections are typically completed at the same time

  5. 5

    Final Inspections (all trades) and Certificate of Occupancy

    All final inspections completed together; CO processed within 48 hours of a complete final submittal

See the full Erie inspection guide — scheduling & re-inspection fees →

Tips

  • Erie calculates new-construction valuation using its own fixed per-square-foot rates (not your stated project cost) — budget the permit fee off $169.09/sq ft (above-grade), $66.20/sq ft (garage), and $31.50/sq ft (basement), not your actual construction contract price.
  • A Land Survey Plat is now required for new residential builds (effective September 3, 2025) — factor the survey timeline into your pre-application schedule.
  • Mountain View Fire Rescue approval is a separate prerequisite sign-off before the Town will issue the building permit — coordinate with the fire district early.
  • The Town's 4-6 week 'first review comments' timeline is explicitly not guaranteed; workload, vacations, and incomplete submittals can extend it.

Frequently asked questions

Erie requires a residential building permit (new single-family / custom home / modular home) for: Building permit application signed by the General Contractor with all licensed subcontractors listed; Soils test report stamped by a Colorado engineering firm; Site-specific grading plan with contours, elevation points, and drainage specifications; Land Survey Plat and plot plan showing setbacks and easements (required for new builds effective September 3, 2025); Architectural plans approved by the Planning Division; Engineer-stamped Foundation Plan and Structural Plan, based on the soils report; HVAC Manuals J, D, and S; Mountain View Fire Rescue approved plans and permit; Energy code compliance documentation (REScheck); Stormwater permit and erosion control plan, if applicable; Floodplain development permit, if applicable; On-site wastewater system permit from county health department, if the property is not on Town sewer; HOA approval, if applicable; Total project valuation calculated per the Town's per-square-foot construction cost methodology (not applicant-stated cost): SFD above-grade finished area $169.09/sq ft, garage $66.20/sq ft, unfinished basement $31.50/sq ft. If your project isn't listed, confirm with Town of Erie Building Division at 303-926-2780 before starting work.

The Town does not use the applicant's stated construction cost. It calculates valuation using its own published per-square-foot rates: $169.09/sq ft for above-grade finished floor area, $66.20/sq ft for garage area, and $31.50/sq ft for unfinished basement area, per the 2026 Project Valuations memo.

Erie's published plan-review target for a residential building permit (new single-family / custom home / modular home) is 20–30 business days.

You'll need: Building Permit Application (Customer Self-Service Portal); Engineer-Stamped Foundation and Structural Plans; Land Survey Plat and Plot Plan; Mountain View Fire Rescue Approved Plans and Permit. See the required-documents checklist on this page for details on each.

Erie requires 5 inspection(s) for a residential building permit (new single-family / custom home / modular home), in order: Foundation, Third-Party Engineer Observation (Foundation, Insulation, Radon, Energy Compliance), Temporary Power / Utilities, Framing / Rough Electrical / Rough Plumbing / Rough Mechanical, Final Inspections (all trades) and Certificate of Occupancy. Schedule each through Town of Erie Building Division (303-926-2780).

Apply through Town of Erie Building Division at 645 Holbrook St., Erie, CO 80516 (mailing: P.O. Box 750, Erie, CO 80516). Phone: 303-926-2780, email: building@erieco.gov. Office hours: Monday-Friday, 8 a.m.-5 p.m. Building Division fax/photo-submission line bldgfax@erieco.gov; HVAC/mechanical contact line 303-926-2700; Planning Division 303-926-2770 / planningdivision@erieco.gov.. Official information: https://www.erieco.gov/110/Building-Division.

Erie, Colorado has adopted: 2021 International Building Code (IBC) — currently in force per the Town's Building Codes & Design Criteria page; Title 9 (Building Regulations) of the Municipal Code governs local amendments. Source: https://www.erieco.gov/1772/Building-Codes-Design-Criteria; 2021 International Residential Code (IRC); 2021 International Mechanical Code (IMC); 2021 International Plumbing Code (IPC); 2021 International Fuel Gas Code (IFGC); 2021 International Swimming Pool and Spa Code (ISPSC); 2021 International Existing Building Code (IEBC); 2021 International Property Maintenance Code (IPMC); 2024 International Energy Conservation Code (IECC), with local amendments — adopted by Ordinance No. 12-2026, effective April 24, 2026; 2026 National Electrical Code (NEC) — adopted by Ordinance No. 12-2026, effective April 24, 2026 (supersedes the 2020 NEC cited in the Town's older Solar Permitting Checklist); 2024 International Fire Code (IFC), as adopted by the Fire District (Mountain View Fire Rescue) — effective April 24, 2026; Local design criteria (per the Town's Solar Photovoltaic Permitting and Inspection Checklist, the most specific published source found): Maximum Wind Speed = 142 mph Ultimate; Snow Load = 30 psf. This document's own codes list (2021 IRC/IBC, 2020 NEC) predates the April 2026 IECC/NEC/IFC update, so these two figures should be reconfirmed with the Building Division (building@erieco.gov) if a general (non-solar) project needs them, since no separate general design-criteria table was found published on the Town's site as of this review.. Local amendments apply — see the Erie overview page for the full list.

The Town of Erie Building Division issues its own building, electrical, mechanical, and plumbing permits for all work within Erie town limits — Erie is a home-rule town with its own department, regardless of whether a given parcel sits in Weld or Boulder County.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Erie building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.