Commercial Tenant Improvement / Tenant Finish Permit — Erie, Colorado · Requirements sheet
Verified 2026-08-02 · Source: https://www.erieco.gov/2402/Commercial-Multifamily-Projects
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Tenant Improvement / Tenant Finish Permit in Erie, Colorado
Required for interior finish work or renovations within existing commercial buildings in Erie. The Town's Commercial & Multifamily Projects page lists 'Tenant Finish/Improvement' as its own commercial permit category — naming Restaurant, Retail, Office, Medical, Industrial, Art Gallery, Theater, Banquet Hall, Religious, and Assembly occupancies — alongside separate Change of Use, Remodel, and Addition categories. It is a distinct application type, but it shares the same valuation-based fee table, 65% plan check fee, and published 'Commercial Permits: 4-6 Weeks for First Review Comments' timeline as new commercial construction; the Town does not publish a separate TI fee table or a faster TI review track.
Verified 2026-08-02 · Source
When you need this permit
- Electronic submittal via the eTRAKiT Customer Self-Service Portal; applications are not accepted for plan review until the project submittal package is complete
- Contractors and subcontractors must be licensed by the Town of Erie prior to permit issuance, with current certificates of insurance; general contractors need a Class A or Class B license (Specialty 'interior renovation' license, $75/yr, exists for narrower scopes), and Class A/B/C licensees must show proof of passing the appropriate ICC exam Contractor
- Business operations description including tenant name
- Town Business License required for all new businesses (and a prerequisite for a Temporary Certificate of Occupancy)
- Architectural plans with code analysis; stamped electrical, plumbing, and mechanical technical drawings for the affected scope; IECC/energy compliance documentation as applicable
- Mountain View Fire Rescue approved permit required before Town building permit issuance on qualifying projects (fire alarm/sprinkler-affecting work in particular)
- County health department approval if applicable (e.g., restaurant/food-service tenant finishes)
- A change in how the space is used may instead trigger the Town's separate 'Change of Use' permit category — confirm classification with the Building Division before applying
- Application must state a general valuation plus mechanical/electrical/plumbing valuations by scope of work, a total project valuation, and material costs to be considered complete
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Interim Trade Inspections (per permit inspection card)
Rough/cover inspections for the affected trades are recorded on the permit inspection card (returned as part of the CO package); the Town does not publish an itemized TI inspection sequence
- 2
Final Inspections for TCO/CO
Commercial finals per the Town's TCO checklist as applicable to the scope: building, accessibility, mechanical, electrical, plumbing, Mountain View Fire Rescue, health department (if applicable), and Planning; Town Business License required for TCO
- 3
Certificate of Occupancy Processing
Original inspection card, backflow prevention test reports, HVAC balance report, and insulation certificates as applicable; allow 48 hours for TCO/CO processing and give the Building Division 2 weeks advance notice
See the full Erie inspection guide — scheduling & re-inspection fees →
Tips
- Erie lists Tenant Finish/Improvement as its own commercial permit category (distinct from Change of Use, Remodel, and Addition) — but it carries no separate fee table or faster published review track; budget the same 4-6 week first-review window and valuation-based fees as any commercial permit.
- If the new tenant's use differs from the previous occupant's, the project may fall under the Town's separate 'Change of Use' category instead — clarify with the Building Division (building@erieco.gov, 303-926-2780) before submitting to avoid a rejected application.
- A new tenant needs a Town of Erie Business License, and it is an explicit prerequisite for the Temporary Certificate of Occupancy — apply for it in parallel with the permit, not after inspections.
- Restaurant and food-service tenant finishes add county health department approval to the critical path; fire-alarm/sprinkler-affecting work adds Mountain View Fire Rescue review before the Town will issue the permit.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-02.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Erie building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Erie.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Erie
Commercial Tenant Improvement / Tenant Finish Permit in other cities
Compare commercial tenant improvement / tenant finish permit fees across Colorado →
Look up this fee in a different city →