Fort Lupton building inspections

Inspection sequence, scheduling, and re-inspection fees for building permits in Fort Lupton, Colorado.

Reviewed 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
1200 Dexter Street, Unit W13, Fort Lupton, CO 80621 (mailing: 130 S McKinley Ave, Fort Lupton, CO 80621)
Phone
720-928-4003
Office hours
Not published on the Building Department page as of this review. Key staff direct lines: Jonathan Gesick (Building Official, SAFEbuilt contract) 970-518-5269 jgesick@safebuilt.com; Jose Gonzalez (Building Official II, ProCode Inc. contract) 970-305-3161 jgonzalez@procodeinc.net (also reachable at coemail@safebuilt.com per the New Construction Requirements page); Shannon DeVries (Permit Technician I) 720-466-6104 buildingdept@fortluptonco.gov; Todd Hodges (Planning Director) 720-466-6106 thodges@fortluptonco.gov.

Published scheduling rules

  • A failed water heater may be replaced immediately in an emergency, provided the permit application is submitted the next business day. (Furnace / Water Heater Replacement Permit)
  • Emergency replacements (e.g., failed water heater) may be installed before permit issuance provided the application is submitted the next business day (Furnace / Water Heater Replacement Permit)
  • Permits are valid for 6 months (180 days), extendable by continuing to request inspections; one formal extension and up to 3 amendments/revisions (each a flat $85.00 fee) are allowed per permit. (General)

Inspection sequence

Applies to: Accessory Dwelling Unit (ADU) Permit

  1. 1

    Foundation

    Prior to concrete pour (new-construction ADU)

  2. 2

    Framing

    Structural framing complete before cover

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete per approved plans

Applies to: Residential Addition / Interior Remodel Permit

  1. 1

    Foundation (additions with new footings only)

    Prior to concrete pour

  2. 2

    Rough Frame

    Framing complete, connection to existing structure verified

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete per approved plans

Applies to: Residential Building Permit (New Construction)

  1. 1

    Foundation

    Prior to concrete pour, per engineered foundation plan and soils report

  2. 2

    Framing

    Structural framing, trusses/joists complete before cover

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete; Residential Energy Compliance Certificate and Improvement Location Certificate (ILC) submitted prior to Certificate of Occupancy

Applies to: Commercial Tenant Improvement Permit

  1. 1

    Rough Frame / Structural

    Framing and any structural modifications before cover

  2. 2

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins for the tenant space before concealment

  3. 3

    Final Inspection

    All work complete; Certificate of Occupancy issued 48-72 hours after final approval

Applies to: Deck / Covered Patio / Porch Permit

  1. 1

    Footing / Pier

    Prior to concrete pour, for decks/patios requiring footings or piers

  2. 2

    Framing

    Deck framing, ledger attachment, and railing before final

  3. 3

    Final Inspection

    Guardrails, stair geometry, and attachment to primary structure verified

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Wiring and panel installed before concealment

  2. 2

    Final Inspection / Meter Release

    Devices installed, panel labeled, system energized; Permanent or Temporary Meter Release inspection required

Applies to: EV Charger / Electric Vehicle Charging Station Permit

  1. 1

    Rough Electrical

    Wiring and panel/circuit installed before concealment

  2. 2

    Final Inspection / Meter Release

    Charger installed, panel labeled, system energized; Permanent or Temporary Meter Release inspection required if the installation involves a service/meter change

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork, flues, and equipment placement before concealment (new construction/addition scope only)

  2. 2

    Final Inspection

    Equipment operational, combustion air and venting verified

Applies to: Plumbing Permit

  1. 1

    Rough Plumbing

    Pipe, drain, waste, and vent installation before concealment

  2. 2

    Final Inspection

    Fixtures connected, no leaks, proper venting verified

Applies to: Rooftop Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before cover

  2. 2

    Final Inspection / Meter Release

    Racking, roof penetrations, and electrical connections verified; meter release inspection required for interconnection

Re-inspection fees

Electrical PermitRe-Inspection Fee
$110.00 per inspection
Plumbing PermitRe-Inspection Fee
$110.00 per inspection
Mechanical / HVAC PermitRe-Inspection Fee
$110.00 per inspection
Furnace / Water Heater Replacement PermitRe-Inspection Fee
$110.00 per inspection
Reroof PermitRe-Inspection Fee
$110.00 per inspection
Demolition PermitRe-Inspection Fee
$110.00 per inspection

Fort Lupton building permits

Get alerts for Fort Lupton

We'll email you when Fort Lupton's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.