Demolition Permit in Fort Lupton, Colorado

Required for demolition of structures on footings in Fort Lupton; billed as a flat-rate over-the-counter permit. Demolition of a structure NOT on footings does not require a permit.

Verified 2026-07-06 · Source

When you need this permit

  • Required only for structures on footings; structures not on footings are exempt
  • Exempt from Construction Use Tax per the general fee schedule pattern observed in this corpus for demolition permits (not explicitly itemized as exempt in Fort Lupton's schedule, but no use tax line applies to the flat demolition fee)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Demolition Permit FeeOver-the-Counter One-Stop & Flat Rate Fees, Resolution No. 2026R020
$150.00 flat
Re-Inspection Fee
$110.00 per inspection

Review timeline

Plan reviewFort Lupton’s published plan-review target
1–2 business days

How long did your Demolition Permit permit actually take in Fort Lupton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection

    Site cleared, utilities capped/disconnected as required

See the full Fort Lupton inspection guide — scheduling & re-inspection fees →

Tips

  • Demolition of a structure NOT on footings (e.g., a shed on skids) does not require a permit at all in Fort Lupton — confirm your structure's footing status before assuming a permit is needed.

Frequently asked questions

Fort Lupton requires a demolition permit for: Required only for structures on footings; structures not on footings are exempt; Exempt from Construction Use Tax per the general fee schedule pattern observed in this corpus for demolition permits (not explicitly itemized as exempt in Fort Lupton's schedule, but no use tax line applies to the flat demolition fee). If your project isn't listed, confirm with City of Fort Lupton Planning & Building Department (Building Division) at 720-928-4003 before starting work.

A flat $150.00 Demolition Permit Fee applies to structures on footings, with a published 24-48 hour over-the-counter turnaround. Structures not on footings do not require a permit.

Fort Lupton's published plan-review target for a demolition permit is 1–2 business days.

You'll need: Demolition Permit Application. See the required-documents checklist on this page for details on each.

Fort Lupton requires 1 inspection(s) for a demolition permit, in order: Final Inspection. Schedule each through City of Fort Lupton Planning & Building Department (Building Division) (720-928-4003).

Apply through City of Fort Lupton Planning & Building Department (Building Division) at 1200 Dexter Street, Unit W13, Fort Lupton, CO 80621 (mailing: 130 S McKinley Ave, Fort Lupton, CO 80621). Phone: 720-928-4003, email: buildingdept@fortluptonco.gov. Office hours: Not published on the Building Department page as of this review. Key staff direct lines: Jonathan Gesick (Building Official, SAFEbuilt contract) 970-518-5269 jgesick@safebuilt.com; Jose Gonzalez (Building Official II, ProCode Inc. contract) 970-305-3161 jgonzalez@procodeinc.net (also reachable at coemail@safebuilt.com per the New Construction Requirements page); Shannon DeVries (Permit Technician I) 720-466-6104 buildingdept@fortluptonco.gov; Todd Hodges (Planning Director) 720-466-6106 thodges@fortluptonco.gov.. Official information: https://www.fortluptonco.gov/208/Building.

Fort Lupton, Colorado has adopted: 2024 International Building Code (IBC) — City of Fort Lupton, Current Adopted Codes & Additional Resources page, adopted by Ordinance No. 2026-1198 (approved by City Council January 20, 2026, effective after publication March 28, 2026), replacing the prior 2018 code cycle; 2024 International Residential Code (IRC); 2024 International Mechanical Code (IMC); 2024 International Plumbing Code (IPC); 2024 International Fuel Gas Code (IFGC); 2024 International Fire Code (IFC); 2024 International Existing Building Code (IEBC); 2024 International Energy Conservation Code (IECC); 2024 International Property Maintenance Code; 2024 International Swimming Pool and Spa Code; 2023 National Electrical Code (NEC) — state-mandated edition per Colorado statute, referenced on the same Current Adopted Codes page; Colorado Model Electric Ready and Solar Ready Code, 2023 Edition — adopted by reference in the same Ordinance No. 2026-1198 (per Resolution No. 2026R020 recitals), enacting new municipal code sections rather than amending the I-Codes directly; Colorado Wildfire Resiliency Code, 2025 Edition — likewise adopted by reference in Ordinance No. 2026-1198, effective March 28, 2026; Note on prior-cycle residue: a ProCode Inc.-branded 'Residential Energy Compliance Certificate' template still in departmental circulation references the superseded '2012/2018 IECC (Res) as amended' baseline for duct-leakage (R403.3.3) and building-envelope (R402.1.2) testing language; the live Current Adopted Codes webpage and Resolution No. 2026R020 recitals (Ordinance 2026-1198, 2024 I-Codes) are treated as the current, governing adoption for this file since they are the actively maintained code-adoption authority, not a legacy form that has not yet been reprinted.. Local amendments apply — see the Fort Lupton overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fort Lupton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.