Residential Building Permit (New Construction) in Fort Lupton, Colorado

Required for new single-family, two-family (duplex), and townhouse construction in Fort Lupton. Reviewed under the 2024 IRC/IBC as locally adopted (Ordinance No. 2026-1198). Valuation is calculated as the greater of the ICC Building Valuation Data table or the City's own per-square-foot Construction Valuation Calculator Schedule. Issued by the Planning & Building Department via the CommunityCore online portal.

Verified 2026-07-06 · Source

When you need this permit

  • Pre-Application Review Questionnaire completed and a pre-application meeting with city staff to discuss land-use development requirements
  • Water dedication based on tap size — Colorado Big Thompson (C-BT) Unit Equivalents determined per the 'Water Requirements for New Development' document, with associated market-value fees
  • Recorded deed or proof of ownership, and an agent affidavit if applying on behalf of the owner
  • Plot plan showing building location, lot/property line distances, utility locations, setbacks, driveway dimensions, and north arrow
  • Site grading plan certified by a licensed engineer (required before Certificate of Occupancy issuance)
  • Engineered foundation designed by a licensed engineer referencing a soils investigation report and open-hole letter
  • Floor plans, wall sections, elevations, truss/joist layouts, door/window/cabinet/appliance/fixture locations, insulation R-values and window U-values
  • Energy code compliance documentation via prescriptive path, ResCheck, ERI, or HERS rating, plus Manual J, S, and D HVAC design calculations
  • Improvement Location Certificate (ILC) required prior to Certificate of Occupancy issuance
  • Residential Energy Compliance Certificate (duct-leakage and building-envelope/blower-door test results from an independent third-party tester) required at final inspection
  • All applications submitted through the CommunityCore online portal (in-office kiosk available for applicants without computer access)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 6 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — valuation $1.00 to $500.00Resolution No. 2026R020, Exhibit A, effective 5/1/2026
$24.00
Building Permit Fee — valuation $501.00 to $2,000.00
$24 for the first $500 plus $3 for each additional $100 or fraction thereof, up to and including $2,000
Building Permit Fee — valuation $2,001.00 to $40,000.00
$69 for the first $2,000 plus $11 for each additional $1,000 or fraction thereof, up to and including $40,000
Building Permit Fee — valuation $40,001.00 to $100,000.00
$487 for the first $40,000 plus $9 for each additional $1,000 or fraction thereof, up to and including $100,000
Building Permit Fee — valuation $100,001.00 to $500,000.00
$1,027 for the first $100,000 plus $7 for each additional $1,000 or fraction thereof, up to and including $500,000
Building Permit Fee — valuation $500,001.00 to $1,000,000.00
$3,827 for the first $500,000 plus $5 for each additional $1,000 or fraction thereof, up to and including $1,000,000
Building Permit Fee — valuation $1,000,001.00 to $5,000,000.00
$6,327 for the first $1,000,000 plus $3 for each additional $1,000 or fraction thereof, up to and including $5,000,000
Building Permit Fee — valuation $5,000,001.00 and over
$18,327 for the first $5,000,000 plus $1 for each additional $1,000 or fraction thereof
Residential Plan Review FeeDue upfront at application submittal effective May 1, 2026 per the Plan Review Fee Deposit Policy
65% of Building Permit Fee
Construction Valuation Per Square Foot (used if greater than ICC BVD Data table)Greater of ICC BVD table or this schedule governs valuation
Above Grade Floors $160/sq ft; Foundation-Crawlspace $25/sq ft; Foundation-Unfinished Area $50/sq ft; Foundation+Basement Finished Area $90/sq ft; Basement Finish $45/sq ft; Garage $55/sq ft
Use Tax
50% of the calculated valuation or the provided material cost, whichever is greater, multiplied by the applicable use tax rate

Review timeline

Plan reviewFort Lupton’s published plan-review target
7–10 business days

How long did your Residential Building Permit (New Construction) permit actually take in Fort Lupton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation

    Prior to concrete pour, per engineered foundation plan and soils report

  2. 2

    Framing

    Structural framing, trusses/joists complete before cover

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete; Residential Energy Compliance Certificate and Improvement Location Certificate (ILC) submitted prior to Certificate of Occupancy

See the full Fort Lupton inspection guide — scheduling & re-inspection fees →

Tips

  • Fort Lupton calculates building permit valuation as the GREATER of the ICC Building Valuation Data table or the City's own per-square-foot Construction Valuation Calculator Schedule (e.g., $160/sq ft for above-grade floors) — budget for whichever produces the higher fee.
  • Effective May 1, 2026, the full Plan Review Fee (65% of the Building Permit Fee) must be paid UPFRONT at application submittal, not at permit issuance, and is non-refundable once review begins — factor this into project cash-flow timing.
  • A Residential Energy Compliance Certificate (independent third-party duct-leakage and blower-door test) is mandatory at final inspection for all new residential permits since May 2022 — schedule third-party testing early enough to avoid delaying your Certificate of Occupancy.
  • Water dedication (C-BT Unit Equivalents) is a separate, often overlooked cost driver for new construction — confirm your tap size and water-share requirement with Public Works before budgeting the project.

Frequently asked questions

Fort Lupton requires a residential building permit (new construction) for: Pre-Application Review Questionnaire completed and a pre-application meeting with city staff to discuss land-use development requirements; Water dedication based on tap size — Colorado Big Thompson (C-BT) Unit Equivalents determined per the 'Water Requirements for New Development' document, with associated market-value fees; Recorded deed or proof of ownership, and an agent affidavit if applying on behalf of the owner; Plot plan showing building location, lot/property line distances, utility locations, setbacks, driveway dimensions, and north arrow; Site grading plan certified by a licensed engineer (required before Certificate of Occupancy issuance); Engineered foundation designed by a licensed engineer referencing a soils investigation report and open-hole letter; Floor plans, wall sections, elevations, truss/joist layouts, door/window/cabinet/appliance/fixture locations, insulation R-values and window U-values; Energy code compliance documentation via prescriptive path, ResCheck, ERI, or HERS rating, plus Manual J, S, and D HVAC design calculations; Improvement Location Certificate (ILC) required prior to Certificate of Occupancy issuance; Residential Energy Compliance Certificate (duct-leakage and building-envelope/blower-door test results from an independent third-party tester) required at final inspection; All applications submitted through the CommunityCore online portal (in-office kiosk available for applicants without computer access). If your project isn't listed, confirm with City of Fort Lupton Planning & Building Department (Building Division) at 720-928-4003 before starting work.

In Fort Lupton, the published Building Permit Fee — valuation $1.00 to $500.00 is: $24.00. Additional published fees: Building Permit Fee — valuation $501.00 to $2,000.00 — $24 for the first $500 plus $3 for each additional $100 or fraction thereof, up to and including $2,000; Building Permit Fee — valuation $2,001.00 to $40,000.00 — $69 for the first $2,000 plus $11 for each additional $1,000 or fraction thereof, up to and including $40,000; Building Permit Fee — valuation $40,001.00 to $100,000.00 — $487 for the first $40,000 plus $9 for each additional $1,000 or fraction thereof, up to and including $100,000; Building Permit Fee — valuation $100,001.00 to $500,000.00 — $1,027 for the first $100,000 plus $7 for each additional $1,000 or fraction thereof, up to and including $500,000; Building Permit Fee — valuation $500,001.00 to $1,000,000.00 — $3,827 for the first $500,000 plus $5 for each additional $1,000 or fraction thereof, up to and including $1,000,000; Building Permit Fee — valuation $1,000,001.00 to $5,000,000.00 — $6,327 for the first $1,000,000 plus $3 for each additional $1,000 or fraction thereof, up to and including $5,000,000; Building Permit Fee — valuation $5,000,001.00 and over — $18,327 for the first $5,000,000 plus $1 for each additional $1,000 or fraction thereof; Residential Plan Review Fee — 65% of Building Permit Fee; Construction Valuation Per Square Foot (used if greater than ICC BVD Data table) — Above Grade Floors $160/sq ft; Foundation-Crawlspace $25/sq ft; Foundation-Unfinished Area $50/sq ft; Foundation+Basement Finished Area $90/sq ft; Basement Finish $45/sq ft; Garage $55/sq ft; Use Tax — 50% of the calculated valuation or the provided material cost, whichever is greater, multiplied by the applicable use tax rate. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

The City's Permit Information page states residential building plan review takes 7-10 business days, with over-the-counter/one-stop permits processed in 24-48 hours and Certificates of Occupancy issued 48-72 hours after final inspection approval.

You'll need: Residential Building Permit Application; Plot Plan / Site Plan; Engineered Foundation Plan and Soils Report; Energy Code Compliance Documentation; Residential Energy Compliance Certificate; Improvement Location Certificate (ILC). See the required-documents checklist on this page for details on each.

Fort Lupton requires 4 inspection(s) for a residential building permit (new construction), in order: Foundation, Framing, Rough Electrical / Plumbing / Mechanical, Final Inspection. Schedule each through City of Fort Lupton Planning & Building Department (Building Division) (720-928-4003).

Apply through City of Fort Lupton Planning & Building Department (Building Division) at 1200 Dexter Street, Unit W13, Fort Lupton, CO 80621 (mailing: 130 S McKinley Ave, Fort Lupton, CO 80621). Phone: 720-928-4003, email: buildingdept@fortluptonco.gov. Office hours: Not published on the Building Department page as of this review. Key staff direct lines: Jonathan Gesick (Building Official, SAFEbuilt contract) 970-518-5269 jgesick@safebuilt.com; Jose Gonzalez (Building Official II, ProCode Inc. contract) 970-305-3161 jgonzalez@procodeinc.net (also reachable at coemail@safebuilt.com per the New Construction Requirements page); Shannon DeVries (Permit Technician I) 720-466-6104 buildingdept@fortluptonco.gov; Todd Hodges (Planning Director) 720-466-6106 thodges@fortluptonco.gov.. Official information: https://www.fortluptonco.gov/208/Building.

Fort Lupton, Colorado has adopted: 2024 International Building Code (IBC) — City of Fort Lupton, Current Adopted Codes & Additional Resources page, adopted by Ordinance No. 2026-1198 (approved by City Council January 20, 2026, effective after publication March 28, 2026), replacing the prior 2018 code cycle; 2024 International Residential Code (IRC); 2024 International Mechanical Code (IMC); 2024 International Plumbing Code (IPC); 2024 International Fuel Gas Code (IFGC); 2024 International Fire Code (IFC); 2024 International Existing Building Code (IEBC); 2024 International Energy Conservation Code (IECC); 2024 International Property Maintenance Code; 2024 International Swimming Pool and Spa Code; 2023 National Electrical Code (NEC) — state-mandated edition per Colorado statute, referenced on the same Current Adopted Codes page; Colorado Model Electric Ready and Solar Ready Code, 2023 Edition — adopted by reference in the same Ordinance No. 2026-1198 (per Resolution No. 2026R020 recitals), enacting new municipal code sections rather than amending the I-Codes directly; Colorado Wildfire Resiliency Code, 2025 Edition — likewise adopted by reference in Ordinance No. 2026-1198, effective March 28, 2026; Note on prior-cycle residue: a ProCode Inc.-branded 'Residential Energy Compliance Certificate' template still in departmental circulation references the superseded '2012/2018 IECC (Res) as amended' baseline for duct-leakage (R403.3.3) and building-envelope (R402.1.2) testing language; the live Current Adopted Codes webpage and Resolution No. 2026R020 recitals (Ordinance 2026-1198, 2024 I-Codes) are treated as the current, governing adoption for this file since they are the actively maintained code-adoption authority, not a legacy form that has not yet been reprinted.. Local amendments apply — see the Fort Lupton overview page for the full list.

The City of Fort Lupton Planning & Building Department issues all building, electrical, mechanical, and plumbing permits within city limits. Building-official services are contracted to SAFEbuilt and ProCode Inc., but Fort Lupton is a home-rule city running its own local permitting program, not deferring to Weld County.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fort Lupton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.