Platteville building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Platteville, Colorado.
Verified 2026-07-23 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 400 Grand Avenue, Platteville, CO 80651
- Phone
- 970-785-2245
- Office hours
- Town Hall main line 970-785-2245 (fax 970-785-2476). Building permit applications and plan-review submittals are emailed to kcampos@plattevillegov.org; SAFEbuilt plans examiners (coloradoplanreview@safebuilt.com for resubmittals) interpret International Codes and conduct building inspections on the Town's behalf. No separate SAFEbuilt local office address or in-person hours are published on the Town's site; all intake is via Town Hall or email.
- Website
- Official site
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Foundation
After trenches excavated, reinforcement steel in place, forms erected, PRIOR to placing concrete
- 2
Underground Plumbing
Prior to covering of any piping or wiring and prior to placing concrete
- 3
Rough Trade (plumbing, mechanical, electrical)
May be performed with the rough frame inspection
- 4
Rough Frame
After roof, framing, fire stopping, sheathing, draft stopping, bracing, and fasteners are in place
- 5
Insulation
After insulation placed, PRIOR to covering walls
- 6
Final
After construction is fully complete
Applies to: Residential Addition / Basement Finish Permit
- 1
Foundation & Foundation Wall (additions with new footings)
After trenches excavated, reinforcement steel in place, forms erected, PRIOR to concrete
- 2
Underground Plumbing
Prior to covering piping/wiring and prior to placing concrete
- 3
Rough Trade / Rough Frame
Plumbing, mechanical, electrical rough-in and framing, fire stopping, sheathing, bracing complete
- 4
Insulation
After insulation placed, prior to covering walls
- 5
Final
After the addition or basement finish is completed
Applies to: Accessory Structure Permit (Detached Garage, Shed, Pole Barn) & Accessory Dwelling Unit (ADU)
- 1
Footings
After trenches excavated, forms erected, PRIOR to placing concrete
- 2
Slab
Prior to placing concrete
- 3
Frame/Rough (with utility inspections if installed)
After roof, framing, bracing, fasteners in place
- 4
Final
After the structure is completed
Applies to: Deck, Patio Cover & Carport Permit
- 1
Footings
After trenches excavated, forms erected, PRIOR to placing concrete
- 2
Framing
Rim joist/ledger attachment, floor joists, beams, hangers (decks); roof, truss/ledger attachment, rafters/joists, beams and hangers, plus rough electric if applicable (patio covers/carports)
- 3
Final
After the deck or patio cover/carport is completed, including any final electrical
Applies to: Electrical Permit
- 1
Rough Electrical
Wiring and panel installed before concealment; may be combined with rough frame/trade inspection
- 2
Final Inspection
Devices installed, system energized and verified; inspector may verify electrician identity/licensure at this stage
Applies to: EV Charger / EVSE Permit
- 1
Rough Electrical
EVSE circuit wiring and panel connections before concealment; may be combined with rough frame/trade inspection
- 2
Final Inspection
Charger installed, system energized and verified; inspector may verify electrician identity/licensure at this stage
Applies to: Mechanical / HVAC Permit
- 1
Rough Mechanical
Ductwork, flues, equipment placement before concealment; may be combined with rough trade/frame inspection
- 2
Final Inspection
Equipment operational, combustion air and venting verified
Applies to: Plumbing Permit
- 1
Underground / Rough Plumbing
Prior to covering of any piping and prior to placing concrete
- 2
Final Inspection
Fixtures connected, no leaks, proper venting verified; inspector may verify plumber identity/licensure
Applies to: Re-Roof Permit
- 1
Mid-Roof Inspection (if required)
Per the guide: 'Mid-roof inspections are NOT required on residential projects' as a general rule, though the Building Department may require one for tile/metal/special roofing exceeding 7.5 psf
- 2
Final Roof Inspection
Required for all re-roof permits; permit holder must call for this inspection
Applies to: Rooftop Solar / Photovoltaic Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before cover
- 2
Final Inspection
Racking, roof penetrations, and electrical connections verified
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Platteville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Platteville building permits
Get alerts for Platteville
We'll email you when Platteville's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.