Platteville's published SAFEbuilt guide series covers Accessory Structures (garages, sheds) and Pole Barns generically under the 2024 IRC. RESOLVED 2026-07-23: Platteville DOES have a dedicated Accessory Dwelling Unit zoning framework — Chapter 16 (Zoning), Article III, Sec. 16-3-20 'Accessory Dwelling Units,' confirmed live via the Town's Code of Ordinances (Municode Library, Supp. 2, updated 2026-02-17, codified through Ordinance No. 2025-851, Dec. 16, 2025). Live-quoted: each ADU 'shall comply with the principal structure standards, except that each ADU shall be subordinate to and no larger than seventy-five percent (75%) of the square feet [of the principal dwelling unit]'; and 'no portion of a structure containing an ADU may have ownership different from the ownership of the principal dwelling unit' (an ADU cannot be sold or subdivided off from the primary residence). Sec. 16-2-40 'Agricultural/Holding (A-H) District' further confirms an 'Agricultural accessory dwelling unit/structure, limited to nine hundred (900) square feet per acre of land' as a permitted use in that zoning district specifically. A habitable ADU is therefore permitted by right in at least some Platteville zoning districts (subject to the 75%-of-principal-structure size cap and single-ownership rule), but which OTHER zoning districts (beyond A-H) allow ADUs, and any district-specific size/setback variations, were not independently enumerated in this pass — building-permit processing for an ADU is expected to follow the same combined Building Permit Application / SAFEbuilt review path as any other accessory structure or addition, under the 2024 IRC.
Verified 2026-07-23 · Source
When you need this permit
- Site plan showing setback compliance (structures may not be built over setback lines, easements, or property lines); check with the zoning department for size/location restrictions specific to accessory structures
- Construction details: foundation detail (Foundation Detail A or B per the guide), framing, roof covering/sheathing, insulation values, and wall/floor framing dimensions
- Floor plan showing bracing, whether the space is heated or unheated (heated spaces must check local energy code requirements for conditioned accessory structures), door/window header sizes, and garage door opening dimensions
- A survey from a registered land surveyor required if the project is in a protected area; an as-built survey required if proposed within 12 inches of a required minimum setback
- For a habitable ADU specifically: Sec. 16-3-20 (Chapter 16 — Zoning) requires the ADU be no larger than 75% of the principal dwelling unit's square footage, and that the property retain single ownership across the principal dwelling and the ADU (no separate sale/subdivision) — confirmed 2026-07-23 via the Town's live Code of Ordinances
- In the Agricultural/Holding (A-H) zoning district specifically, an agricultural ADU/structure is capped at 900 square feet per acre of land (Sec. 16-2-40) — other zoning districts' ADU allowances were not individually enumerated in this pass; confirm the applicable district's specific rule with Planning and Zoning
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footings
After trenches excavated, forms erected, PRIOR to placing concrete
- 2
Slab
Prior to placing concrete
- 3
Frame/Rough (with utility inspections if installed)
After roof, framing, bracing, fasteners in place
- 4
Final
After the structure is completed
See the full Platteville inspection guide — scheduling & re-inspection fees →
Tips
- Platteville's zoning code (Sec. 16-3-20) DOES permit a habitable Accessory Dwelling Unit, but caps it at no larger than 75% of the principal dwelling unit's square footage and requires the ADU remain under the same ownership as the principal dwelling (it cannot be sold or subdivided off separately) — confirm these two constraints, plus your specific zoning district's ADU allowance (only the Agricultural/Holding district's 900-sq-ft-per-acre rule was independently confirmed in this pass), with Planning and Zoning before designing an ADU project.
- A garage/shed/pole-barn accessory structure and a habitable ADU are governed by different sections of the Zoning Code (general accessory-structure standards vs. Sec. 16-3-20's ADU-specific size/ownership rules) even though both may be reviewed under the same combined Building Permit Application and 2024 IRC — don't assume a simple accessory-structure permit automatically clears ADU-specific zoning requirements.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Platteville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Platteville
Accessory Structure Permit (Detached Garage, Shed, Pole Barn) & Accessory Dwelling Unit (ADU) in other cities
Look up this fee in a different city →
Now live
Build your Platteville project checklist
Describe your project once and get every permit, document, and fee it triggers in Platteville — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →