Skip to main content
PermitBase

Demolition Permit in Platteville, Colorado

VERIFIED-NEGATIVE, confirmed 2026-07-23: Platteville has no dedicated demolition permit type. Not separately documented on the Town's SAFEbuilt Permits page or in any of the Town's published SAFEbuilt guide series; the Building Permit Application form's 'Type of Improvement' checklist does not include a distinct demolition category (it lists New Building/Structure, Addition, Accessory Structure, Remodel/Finish, Repair/Replacement, Mobile Structure, Sprinkler System, Fence, Water Heater, HVAC, and Other). This was further confirmed 2026-07-23 by a live full-text search of the Town's ENTIRE current Code of Ordinances (Municode Library, Code of Ordinances Supp. 2, updated 2026-02-17, codified through Ordinance No. 2025-851, Dec. 16, 2025) — searching 'demolition permit' across the whole live code returns only 2 hits, both in Chapter 7 (Health, Sanitation and Animals) listing an abandoned/partially-demolished structure as a NUISANCE condition (Sec. 7-1-30/7-1-40), not a permit requirement. Zero hits appear in Chapter 18 (Building Regulations) or Appendix A (Fee Schedule). A demolition project in Platteville would be captured under the standard Building Permit Application's 'Other' checkbox (or possibly under Chapter 18's adopted International Existing Building Code, which governs alteration/demolition of existing structures generically, without a Town-specific standalone demolition-permit process).

Verified 2026-07-23 · Source

When you need this permit

  • No dedicated demolition permit exists in Platteville as of 2026-07-23 (verified-negative, confirmed via full-text search of the Town's entire live Code of Ordinances, not just the guide series and application form) — a demolition project would be filed on the standard combined Building Permit Application ('Other' checkbox) and reviewed by SAFEbuilt under Chapter 18's adopted 2024 International Existing Building Code (Sec. 18-13-10) or International Building Code as applicable

Required documents

Check off what you have — your progress is saved on this device.

    Fee schedule

    Filing fee
    Not published — contact the department

    Review timeline

    Plan review
    Not published — contact the department

    How long did your Demolition Permit permit actually take in Platteville?

    Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

    Inspection process

      See the full Platteville inspection guide — scheduling & re-inspection fees →

      Tips

      • If planning a demolition project in Platteville, contact Town Hall (970-785-2245) directly to confirm the applicable permit process — as of 2026-07-23 there is confirmed to be no dedicated demolition permit page, application checkbox, fee line, or Code of Ordinances section; expect it to be processed as an 'Other' Building Permit Application, likely reviewed under Chapter 18's adopted 2024 International Existing Building Code.

      Frequently asked questions

      Platteville requires a demolition permit for: No dedicated demolition permit exists in Platteville as of 2026-07-23 (verified-negative, confirmed via full-text search of the Town's entire live Code of Ordinances, not just the guide series and application form) — a demolition project would be filed on the standard combined Building Permit Application ('Other' checkbox) and reviewed by SAFEbuilt under Chapter 18's adopted 2024 International Existing Building Code (Sec. 18-13-10) or International Building Code as applicable. If your project isn't listed, confirm with Town of Platteville — SAFEbuilt Permits (contracted building department services) at 970-785-2245 before starting work.

      Platteville does not publish a plan-review timeline for this permit. Contact Town of Platteville — SAFEbuilt Permits (contracted building department services) at 970-785-2245 for current turnaround.

      Apply through Town of Platteville — SAFEbuilt Permits (contracted building department services) at 400 Grand Avenue, Platteville, CO 80651. Phone: 970-785-2245, email: kcampos@plattevillegov.org. Office hours: Town Hall main line 970-785-2245 (fax 970-785-2476). Building permit applications and plan-review submittals are emailed to kcampos@plattevillegov.org; SAFEbuilt plans examiners (coloradoplanreview@safebuilt.com for resubmittals) interpret International Codes and conduct building inspections on the Town's behalf. No separate SAFEbuilt local office address or in-person hours are published on the Town's site; all intake is via Town Hall or email.. Official information: https://platteville.colorado.gov/safebuilt-permits.

      Platteville, Colorado has adopted: 2024 International Building Code (IBC), Chapters 1-35 — CONFIRMED 2026-07-23 directly from the Town's own codified ordinances (Sec. 18-2-10, 'Adoption', Chapter 18 — Building Regulations, Article II — Building Code): 'The International Building Code, 2024 Edition as published by the International Code Council, 4051 West Flossmoor Road, Country Club Hills, IL 60478, Chapters 1 through 35 inclusive...' Retrieved live via Municode Library (library.municode.com/co/platteville/codes/code_of_ordinances), Code of Ordinances Supplement 2, online content updated 2026-02-17, codified through Ordinance No. 2025-851 (enacted 2025-12-16) — the Dec-2025 code-adoption ordinance referenced in this corpus's Colorado research playbook.; 2024 International Residential Code (IRC), Chapters 1-43 — CONFIRMED 2026-07-23 via Sec. 18-10-10 'Adoption' (Chapter 18, Article X — Residential Code): 'The International Residential Code, 2024 Edition as published by the International Code Council... Chapters 1 through 43 inclusive...' Corroborates the SAFEbuilt guide series' consistent '2024 IRC' heading with a second, independent, directly-codified source.; 2024 International Mechanical Code (IMC), Chapters 1-15 — CONFIRMED 2026-07-23 via Sec. 18-3-10 'Adoption' (Chapter 18, Article III — Mechanical Code), live Municode text.; 2024 International Fuel Gas Code (IFGC), Chapters 1-8 — CONFIRMED 2026-07-23 via Sec. 18-9-10 'Adoption' (Chapter 18, Article IX — Fuel Gas Code), live Municode text.; 2024 International Fire Code (IFC), plus Appendix B-0 — CONFIRMED 2026-07-23 via Sec. 18-11-10 'Adoption' (Chapter 18, Article XI — Fire Code): 'chapters and appendices B-0 of the 2024 International Fire Code (the "IFC") are hereby adopted by reference as the Town of Platteville Fire Code...'; 2024 International Property Maintenance Code (IPMC), Chapters 1-8 — CONFIRMED 2026-07-23 via Sec. 18-12-10 'Adoption' (Chapter 18, Article XII — Property Maintenance Code), live Municode text.; 2024 International Existing Building Code (IEBC), Chapters 1-16 — CONFIRMED 2026-07-23 via Sec. 18-13-10 'Adoption' (Chapter 18, Article XIII — Existing Building Code); this code family was not previously identified in this file — new finding from the 2026-07-23 chase.; 2024 International Energy Conservation Code (IECC), Chapters 1-6 Commercial [+ Residential provisions] — CONFIRMED 2026-07-23 via Sec. 18-14-10 'Adoption' (Chapter 18, Article XIV — Energy Conservation Code), which ALSO adopts by reference 'Appendix CK Colorado Model Electric and Solar Ready Code-Commercial and Appendix RM Colorado Model Electric and Solar Ready Code-Residential' — this is the direct, specific HB22-1362 electric-ready/solar-ready citation that could not be located in 2026-07-06's chase (only the generic 'State of Colorado Electric Ready Code' guide reference was found then). Sec. 18-14-30 'Amendments' further amends the IECC to replace all references to 'ICC Electrical Code' with 'National Electrical Code as adopted by the State.'; National Electrical Code (NEC), 2023 Edition, exclusive of appendices — CONFIRMED 2026-07-23 via Sec. 18-5-10 'Adoption' (Chapter 18, Article V — Electrical Code): 'The National Electrical Code, 2023 Edition, exclusive of appendices, published by the National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169, is hereby [adopted]...' This RESOLVES the gap flagged in the 2026-07-06 pass ('The NEC edition... could not be independently re-confirmed... omitted rather than guessed') — Platteville does codify its own NEC edition (2023) in Chapter 18 Article V, notwithstanding that day-to-day electrical licensing runs through DORA contemporaneous review rather than a Town trade-license program (see localAmendments).; All nine code-family adoptions above were retrieved 2026-07-23 from the Town's live, current Municode Library codification (library.municode.com/co/platteville/codes/code_of_ordinances), Supplement 2, online content updated 2026-02-17, 'Codified through Ordinance No. 2025-851, enacted December 16, 2025' — via that page's own full-text search API (localapi/search, clientId=19046, scoped to Platteville only), which returns live indexed section text. This is a second, independent, more authoritative confirmation of the 2024 cycle than the SAFEbuilt guide series alone, and definitively supersedes the stale 'Photovoltaic System Submittal Requirements' PDF (last revised 10.22.2021, citing '2020 NEC, 2018 International Codes') — that PDF's code-year language is now confirmed stale against the Town's own codified ordinances, not merely inferred against a differently-dated guide series.; Colorado is a home-rule state with no statewide-mandated building code edition; Platteville's own codified Chapter 18 adoption ordinances (as amended through Ord. No. 2025-851, Dec. 16, 2025) are the direct governing source, corroborated by the SAFEbuilt guide series.; HB22-1362 (Colorado's statewide minimum energy code floor for the July 2023-July 2026 window, requiring at least the 2021 IECC plus electric- and solar-ready / EV-ready provisions for jurisdictions issuing residential building permits) is satisfied and directly evidenced: Platteville's 2024 IECC adoption (Sec. 18-14-10) exceeds the 2021 IECC floor AND explicitly adopts by reference the Colorado Model Electric and Solar Ready Code Appendices CK (Commercial) and RM (Residential) — the specific state-mandated electric-ready/solar-ready provisions, confirmed 2026-07-23 directly from the ordinance text rather than inferred from a generic guide-page mention.. Local amendments apply — see the Platteville overview page for the full list.

      Sources & verification

      Verified against official sources. Last reviewed 2026-07-23.

      Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Platteville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.