EV Charger / EVSE Permit in Notus, Idaho

The City of Notus does not publish a dedicated EV charger/EVSE permit, and does not issue electrical permits of any kind — the City's own Forms-Apps-Permits page states plainly that 'Plumbing, Mechanical and Electrical permits are issued through State agencies.' Installation of a Level 2 EV charger requires an electrical permit from the Idaho Division of Occupational and Professional Licenses (DOPL) / Electrical Board, the same statewide mechanism that covers all other electrical work in Notus (including solar PV interconnection). If any structural/mounting work or new panel enclosure triggers building-permit scope, that portion would fall under the City's standard Residential Building Permit.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical permit for EV charger wiring/circuit installation must be obtained from the Idaho DOPL Electrical Board, not the City of Notus — confirmed on the City's own Forms-Apps-Permits page
  • Contractor Electrical Permit Application or Homeowner Electrical Permit Application (DOPL), purchased via DOPL's online ArcGIS-based permit system
  • If the installation involves structural work (e.g., new panel enclosure, mounting structure) a City of Notus Residential Building Permit may also be required for that scope
  • No EV-specific permit category, application, or fee schedule is published by the City of Notus or by Idaho DOPL as of 2026-07-20

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Filing fee
Not published — contact the department

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Notus?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Notus inspection guide — scheduling & re-inspection fees →

    Tips

    • EV charger electrical work in Notus is NOT permitted by the City — it goes through Idaho DOPL's Electrical Board, the same as all other electrical, mechanical, and plumbing work in Notus.
    • No published fee schedule exists for DOPL electrical permits or any City of Notus permit type; call ahead to confirm current fees and turnaround before applying.

    Frequently asked questions

    Notus requires an ev charger / evse permit for: Electrical permit for EV charger wiring/circuit installation must be obtained from the Idaho DOPL Electrical Board, not the City of Notus — confirmed on the City's own Forms-Apps-Permits page; Contractor Electrical Permit Application or Homeowner Electrical Permit Application (DOPL), purchased via DOPL's online ArcGIS-based permit system; If the installation involves structural work (e.g., new panel enclosure, mounting structure) a City of Notus Residential Building Permit may also be required for that scope; No EV-specific permit category, application, or fee schedule is published by the City of Notus or by Idaho DOPL as of 2026-07-20. If your project isn't listed, confirm with City of Notus Building Department at 208-459-6212 before starting work.

    Notus does not publish a plan-review timeline for this permit. Contact City of Notus Building Department at 208-459-6212 for current turnaround.

    You'll need: State of Idaho DOPL Electrical Permit Application (Contractor or Homeowner). Depending on your project, Notus may also ask for: Residential Building Permit Application. See the required-documents checklist on this page for details on each.

    Apply through City of Notus Building Department at 375 Notus Road, PO Box 257, Notus, ID 83656. Phone: 208-459-6212, email: notuscityclerk@gmail.com. Office hours: Mon, Tue, Thu 8:30 AM – 5:00 PM; Wed 8:30 AM – 12:00 PM; closed Fridays. Official information: https://www.notusidaho.org/forms--apps--permits.html.

    Notus, Idaho has adopted: 2018 International Building Code (IBC), with Idaho amendments; 2018 International Residential Code (IRC), Parts I, II, III and IX, with Idaho amendments (Idaho Residential Code, 2020 Edition); 2018 International Energy Conservation Code (IECC), with Idaho amendments (Idaho Energy Conservation Code, 2020 Edition); 2018 International Existing Building Code (IEBC); 2018 International Mechanical Code (IMC); 2018 International Fuel Gas Code (IFGC); 2018 International Residential Code Parts V & VI (residential mechanical/fuel gas); 2017 Idaho State Plumbing Code, based on the 2015 Uniform Plumbing Code; 2017 National Electrical Code (NEC), with amendments; 2018 International Fire Code (IFC), administered by the Idaho State Fire Marshal; Notus City Code Title 8 — Building Regulations. Local amendments apply — see the Notus overview page for the full list.

    Not the City. The City of Notus's own Forms-Apps-Permits page states that 'Plumbing, Mechanical and Electrical permits are issued through State agencies.' An EV charger's electrical circuit/wiring permit is issued by the Idaho Division of Occupational and Professional Licenses (DOPL) Electrical Board, separate from any City of Notus building permit that might apply to structural/mounting work.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-20.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Notus building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    Compare ev charger / evse permit fees across Idaho

    Look up this fee in a different city →

    Embed this data card →