How to schedule
Inspections are requested through the building department below.
- Address
- 1007 McKinley Ave, Kellogg, ID 83837
- Phone
- (208) 786-9131
- Office hours
- Mon–Fri 8:00 AM – 4:00 PM
- Website
- Official site
Published scheduling rules
- Call the Building Official's cell, (208) 661-0494, at least 24 hours ahead to schedule the mandatory pre-reroof inspection. (Re-Roof Permit)
- A pre-reroof inspection is required prior to application of new material — call (208) 661-0494 at least 24 hours in advance to schedule (Re-Roof Permit)
Inspection sequence
Applies to: Electric Vehicle (EV) Charger / EVSE Permit
- 1
Rough-In (DOPL)
Circuit, conduit, and disconnect placement before concealment, if applicable — inspected by Idaho DOPL
- 2
Final (DOPL)
Charger mounted, circuit labeled, and installation verified per the National Electrical Code as administered by DOPL
Applies to: Re-Roof Permit
- 1
Pre-Reroof Inspection
Required before new roofing material is applied; call (208) 661-0494 at least 24 hours in advance to schedule
- 2
Final
Verify flashing, underlayment, ice shield, ventilation, and proper installation per approved application
Applies to: Residential Building Permit (New Construction / Addition / Alteration)
- 1
Building Department Sign-Off
Building Official (Keith Teeters) inspection prior to final; applicant must obtain sign-off from all applicable entities listed on the permit application (Building Dept, Flood Plain, Planning & Zoning, fire district, water/sewer district, utilities) prior to final inspection
- 2
Final
Final inspection and sign-off by the City of Kellogg Building Official
Applies to: Solar Photovoltaic (PV) Permit
- 1
Foundation/Footing (ground-mount) or Framing (rooftop racking)
Structural attachment verified by the City Building Official (Keith Teeters) before panels are installed
- 2
Final Electrical/Interconnection (State of Idaho DOPL)
Performed by the State of Idaho, not the City, consistent with Kellogg's standing arrangement for electrical trade permits
Final inspection only: Fence Permit
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kellogg building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Kellogg building permits
Get alerts for Kellogg
We'll email you when Kellogg's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.