Solar Photovoltaic (PV) Permit in Kellogg, Idaho
Required for rooftop or ground-mounted solar photovoltaic installations within the City of Kellogg. Solar is not one of the checkbox categories on the City's single combined Building Department Permit Application (new construction, additions, alterations, demolition, fence, re-roof, siding, signs, mobile/manufactured home setting, floodplain development) — a solar project would be submitted under the general new-construction/alteration scope of that same form for the structural/mounting portion. Electrical interconnection is issued and inspected by the State of Idaho (DOPL), not the City, consistent with Kellogg's standing arrangement for all electrical/plumbing/mechanical trade permits. Kellogg shares its contracted Building Official (Keith Teeters) with several other Shoshone County cities, but sets its own fees independently; no fee schedule for any permit type, including solar, was found published by the City; Kellogg building fees are set by council resolution rather than a published document. The electrical interconnection scope, handled by the State of Idaho DOPL rather than the City, DOES have a published, currently-adopted statewide fee schedule (IDAPA 24.39.10, Rule 500) that governs the electrical portion of a Kellogg solar PV project.
Verified 2026-07-20 · Source
When you need this permit
- Building permit required for the structural/mounting portion of a solar PV installation, submitted on the City's single combined Building Department Permit Application (no dedicated solar checkbox exists — use the general new construction/alteration scope)
- Two sets of plans (minimum 24"x18") required for the structural/mounting design, per the same requirement that applies to new construction generally
- Electrical interconnection is NOT issued or inspected by the City of Kellogg — permitted and inspected by the State of Idaho (Division of Occupational and Professional Licenses / Idaho Building Safety, 1-800-955-3044, dbs.idaho.gov), the same arrangement documented for all other electrical work in this file
- All building permit fees, including any solar structural fee, must be paid with cash or check only — no card payments accepted
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing (ground-mount) or Framing (rooftop racking)
Structural attachment verified by the City Building Official (Keith Teeters) before panels are installed
- 2
Final Electrical/Interconnection (State of Idaho DOPL)
Performed by the State of Idaho, not the City, consistent with Kellogg's standing arrangement for electrical trade permits
See the full Kellogg inspection guide — scheduling & re-inspection fees →
Tips
- Kellogg has no dedicated solar checkbox on its combined permit application — submit the structural/mounting portion under the general new-construction/alteration scope of the same form used for other building work, and confirm directly with Building Official Keith Teeters (208-786-9131) how he wants a solar project categorized.
- As with all trade work in Kellogg, the electrical interconnection is a separate State of Idaho DOPL permit, not a City permit — call 1-800-955-3044 or visit dbs.idaho.gov.
- Kellogg's Building Official, Keith Teeters, also serves Osburn, Wallace, Wardner, Smelterville, and Pinehurst under separate contracted-official arrangements, but each city (including Kellogg) sets its own fees independently — do not assume Kellogg's fees match a neighboring city's (e.g., Osburn's $100/sq ft solar valuation) without direct confirmation.
- The electrical-interconnection portion of a Kellogg solar project is billed under Idaho DOPL's statewide "Other Installation (Including Industrial and Commercial)" fee schedule (IDAPA 24.39.10, Rule 500.02.b) since solar is not classified as new residential construction: $60 plus 2% of wiring cost up to $10,000, scaling from there. The City's own structural/mounting fee remains unpublished and resolution-based.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kellogg building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Kellogg
Solar Photovoltaic (PV) Permit in other cities
Compare solar photovoltaic (pv) permit fees across Idaho →
Look up this fee in a different city →
Now live
Build your Kellogg project checklist
Describe your project once and get every permit, document, and fee it triggers in Kellogg — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →