Re-Roof Permit in Kellogg, Idaho

Required for roof replacement or re-roofing in the City of Kellogg, including tear-off, overlay, siding-related roofing work, and metal/composition/wood shingle installations. A dedicated Re-Roof Permit Application is provided separately from the general building permit application.

Reviewed 2026-07-23 · Source

When you need this permit

  • A pre-reroof inspection is required prior to application of new material — call (208) 661-0494 at least 24 hours in advance to schedule
  • Ice shield underlayment is required
  • Proper ventilation must be provided
  • Dry-rot conditions, structural problems, and/or IRC requirements must be addressed
  • Maximum of two roofing layers allowed on existing roof systems
  • Mobile/manufactured homes with a 30 lb snow-load roof system are allowed only one roof layer unless the second application is metal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

City of Kellogg re-roof permit feePer Kellogg City Code § 4-1-12 (Fees For Building Permits And Associated Services), current through Ord. 642 (11-12-2025): 'Fees for building permits and related building department services shall be set by resolution of the Kellogg city council' (enabling ordinance: Ord. 481, 12-11-2002) — the re-roof permit is issued under this same combined building-permit chapter, so the same resolution-based fee-setting applies. No separate fee-schedule resolution document is published on the city's website, in the council agendas/minutes indexed at kellogg.id.gov/meetings/, or elsewhere online as of 2026-07-23 — confirmed by retrieving the live, JS-rendered code chapter text via the Browser pane (the prior chase had only reached the static, unrendered shell) and by web search; a similarly-named 'Building Permits' page at cityofkellogg.org (which quotes a flat $100 re-shingle/re-side fee) is a distinct jurisdiction, Kellogg, Minnesota, and does not apply here. Call the Building Department at (208) 786-9131 for the current council-set fee.
Not published — contact the department

Review timeline

Plan review
Not published — contact the department

How long did your Re-Roof Permit permit actually take in Kellogg?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Pre-Reroof Inspection

    Required before new roofing material is applied; call (208) 661-0494 at least 24 hours in advance to schedule

  2. 2

    Final

    Verify flashing, underlayment, ice shield, ventilation, and proper installation per approved application

See the full Kellogg inspection guide — scheduling & re-inspection fees →

Tips

  • Call the Building Official's cell, (208) 661-0494, at least 24 hours ahead to schedule the mandatory pre-reroof inspection.
  • Ice shield underlayment is required on all reroofing work in Kellogg.
  • Only two layers of roofing material are allowed on an existing roof system — a full tear-off is required beyond that.

Frequently asked questions

Yes. The City of Kellogg requires a Re-Roof Permit, including a mandatory pre-reroof inspection scheduled at least 24 hours in advance by calling (208) 661-0494.

Kellogg does not publish a plan-review timeline for this permit. Contact City of Kellogg Building Department at (208) 786-9131 for current turnaround.

You'll need: Re-Roof Permit Application. See the required-documents checklist on this page for details on each.

Kellogg requires 2 inspection(s) for a re-roof permit, in order: Pre-Reroof Inspection, Final. Schedule each through City of Kellogg Building Department ((208) 786-9131).

Apply through City of Kellogg Building Department at 1007 McKinley Ave, Kellogg, ID 83837. Phone: (208) 786-9131, email: keith.teeters@kellogg.id.gov. Office hours: Mon–Fri 8:00 AM – 4:00 PM. Official information: https://kellogg.id.gov/departments/building/.

Kellogg, Idaho has adopted: International Building Code (IBC), 2018 edition, as adopted by the State of Idaho/Idaho Building Code Board, effective January 1, 2021 — per Kellogg City Code § 4-1-1.A (Ord. 593, 1-10-2018; amd. Ord. 616, 12-9-2020), current through Ord. 642 (11-12-2025); plan check fee reserved to council resolution; International Residential Code (IRC), 2018 edition, as adopted by the State of Idaho/Idaho Building Code Board, effective January 1, 2021 — per Kellogg City Code § 4-1-1.E (same enabling/amending ordinances); also referenced directly on the Re-Roof Permit Application (ice shield underlayment, dry-rot/structural requirements per I.R.C.); International Energy Conservation Code (IECC), 2018 edition (residential-portion amendments), effective January 1, 2021 — per Kellogg City Code § 4-1-1.B; International Existing Building Code (IEBC), 2018 edition, as adopted by the State of Idaho/Idaho Building Code Board, effective January 1, 2021 — per Kellogg City Code § 4-1-1.F; Idaho Manufactured Home Installation Standard (IMHIS) — per Kellogg City Code § 4-1-1.C; American National Standard ICC/ANSI A117.1 (accessibility) — per Kellogg City Code § 4-1-1.D; 2026-07-23: the full text of Kellogg's adopted building code chapter (City Code Title 4, Chapter 1 — Building Code) was successfully retrieved live via the Browser pane against American Legal Publishing's JavaScript-rendered code library (codelibrary.amlegal.com/codes/kelloggid/latest/kellogg_id/0-0-0-5133), resolving the prior gap; code shown current through Ord. 642 (11-12-2025) per the library's own overview page. Local amendments apply — see the Kellogg overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kellogg building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Compare re-roof permit fees across Idaho

Look up this fee in a different city →

Embed this data card →

Now live

Build your Kellogg project checklist

Describe your project once and get every permit, document, and fee it triggers in Kellogg — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.

Get started →