Electric Vehicle (EV) Charger / EVSE Permit in Kellogg, Idaho
The City of Kellogg does not issue electrical permits at all — like all electrical, plumbing, and mechanical work, EV charger/EVSE circuit installation is permitted and inspected by the State of Idaho (Division of Occupational and Professional Licenses / Idaho Building Safety), not the City. No dedicated EV charger/EVSE fee category exists in IDAPA 24.39.10 (Rules of the Idaho Electrical Board) -- an EV charger circuit added to an existing residence is billed under the flat $65 Existing Residential Dwelling Unit Permit fee, while a commercial or multi-family installation is billed under the Other Installation (Including Industrial and Commercial) Permit's wiring-cost-tiered schedule, both confirmed directly against DOPL's own published electrical board rules (the same statewide schedule verified for Idaho City and Jerome, ID in this same research pass). The City of Kellogg itself does not publish any fee schedule at all (fees are confirmed by phone) and has no bearing on the electrical fee. A City building permit is separately required only if the installation includes a structural/mounting element (e.g., a charger pedestal or canopy), submitted under the general new-construction/alteration category on the City's single combined Building Department Permit Application, since no dedicated EV checkbox exists (mirroring the same treatment as solar in this file).
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit for the EV charger circuit is obtained through Idaho DOPL, not the City of Kellogg
- Governed by the National Electrical Code edition currently adopted by the State of Idaho as administered by DOPL, including NEC Article 625 (Electric Vehicle Charging System) provisions
- If a structural element (pedestal, canopy, or similar) is installed, a City of Kellogg building permit is required for that portion, submitted on the City's combined Building Department Permit Application (no dedicated EV checkbox exists; use the general new-construction/alteration category)
- All City of Kellogg building permit fees must be paid with cash or check only — no card payments accepted
- Contact Idaho DOPL directly at 1-800-955-3044 or dbs.idaho.gov for the electrical permit and current fee
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In (DOPL)
Circuit, conduit, and disconnect placement before concealment, if applicable — inspected by Idaho DOPL
- 2
Final (DOPL)
Charger mounted, circuit labeled, and installation verified per the National Electrical Code as administered by DOPL
See the full Kellogg inspection guide — scheduling & re-inspection fees →
Tips
- The City of Kellogg itself does not issue electrical permits of any kind, including for EV chargers — you must go through the State of Idaho DOPL directly, the same as for any other electrical work in the city.
- If your installation is a simple wall-mounted charger on an existing structure with no new structural element, only the DOPL electrical permit applies; a separate City building permit is only needed if you are adding a structural element like a pedestal or canopy.
- The City of Kellogg does not publish a fee schedule for any permit type — call the Building Department at (208) 786-9131 for current fees before applying for the structural portion, if applicable.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kellogg building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Kellogg
Electric Vehicle (EV) Charger / EVSE Permit in other cities
Compare electric vehicle (ev) charger / evse permit fees across Idaho →
Look up this fee in a different city →
Related guides
Now live
Build your Kellogg project checklist
Describe your project once and get every permit, document, and fee it triggers in Kellogg — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →