Residential/Commercial Solar Photovoltaic (PV) Permit in Townsend, Montana
Because Townsend is not DLI-certified for electrical (its certification is Building and Swimming Pool only), solar PV interconnection/electrical work anywhere within Townsend city limits is issued directly by the Montana DLI Building Codes Bureau in Helena, not the City. This file's own Electrical Permit entry already confirms the exact real fee mechanism: the State's Application for Residential Electrical Permit (BCP-1) carries a dedicated 'Alternative Energy Source add-on (solar, wind, or hydro)' fee of $45-$65, added on top of the base electrical work-type fee, and the application requires the applicant to specify the solar system type (Micro Inverter/AC Module System or PV String System). Racking/mounting structural work is permitted locally by City Building Official James Schauber under the City's Building (B) certification, using the same unpublished-fee mechanism documented in this file's Residential Building Permit entry.
Verified 2026-07-20 · Source
When you need this permit
- Electrical interconnection/wiring for a solar PV system is filed with the Montana DLI Building Codes Bureau, not the City of Townsend, since the City holds no electrical certification — per the same trade split already documented in this file's Electrical Permit entry
- Application must specify the Alternative Energy Source type — Micro Inverter/AC Module System or PV String System for solar — per the state Application for Residential Electrical Permit (BCP-1)
- Alternative Energy Source add-on fee ($45-$65) is charged in addition to whatever base electrical work-type fee applies (e.g., new service, change of service, accessory building panel)
- Racking/mounting structural work requires a City of Townsend Building Permit from Building Official James Schauber, (406) 431-8319 — no dedicated city application form or fee schedule is published (same gap documented in this file's Residential Building Permit entry)
- Apply for the state electrical/alternative-energy permit in accordance with Title 50, Chapter 60, Section 604, MCA and ARM 24.301.431, the same statutory basis documented in this file's Electrical Permit entry
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
Tips
- Solar PV electrical permits for any Townsend address are issued by the STATE Building Codes Bureau in Helena, not the City — mail applications and payment to PO Box 200517, Helena, MT 59620-0517, or apply online at aca-prod.accela.com/bcb, adding the Alternative Energy Source fee to the base electrical fee.
- The racking/mounting structural scope is handled locally by City Building Official James Schauber under Townsend's own Building (B) certification — contact him directly at (406) 431-8319 since no online application or fee schedule is published.
- This is the same statewide BCP-1 Alternative Energy fee mechanism already documented in this file's Electrical Permit entry — it is not Townsend-specific, but it is the correct, currently-published fee that applies to Townsend since the city holds no electrical certification.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Townsend building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Townsend
Residential/Commercial Solar Photovoltaic (PV) Permit in other cities
Compare residential/commercial solar photovoltaic (pv) permit fees across Montana →
Look up this fee in a different city →
Now live
Build your Townsend project checklist
Describe your project once and get every permit, document, and fee it triggers in Townsend — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →