Inspection sequence, scheduling, and re-inspection fees for building permits in Manhattan, Montana.

Verified 2026-07-03 · Source

How to schedule

Inspections are requested through the building department below.

Address
207 South Sixth Street (P.O. Box 96), Manhattan, MT 59741
Phone
(406) 284-3235
Office hours
Town Office, 207 S. 6th St., Manhattan, MT 59741, Monday-Friday 8:30 AM - 5:00 PM (Town Office/Zoning: 406-284-3235; Building Official Brandon Yung: 406-595-9300, byung.town@gmail.com)

Published scheduling rules

  • Commercial occupants must notify the Building Department at least two weeks before their desired occupancy date — plan the final inspection request accordingly. (Certificate of Occupancy)
  • Inspections must be requested by phone by 4:30 PM the day before; call Building Official Brandon Yung directly at (406) 595-9300. (General)

Inspection sequence

Applies to: Residential Building Permit (New Construction, Addition, Remodel)

  1. 1

    Foundation/Footing

    Per Plan Review Check List: verify foundation sizing, reinforcement, seismic hold-downs, anchor bolt spacing (10-inch bolts, 6-foot spacing single story / 4-foot second story, 7-inch embedment, 12 inches from corners), and damp-proofing before concealment

  2. 2

    Rough-In (Mechanical, Electrical, Plumbing, Framing)

    It is the Building Department's preference that all residential rough-in inspections (mechanical and framing) be performed on the same inspection call; must be requested by phone no later than 4:30 PM the preceding day

  3. 3

    Final / Certificate of Occupancy

    Builders must notify the Building Department for final inspection of all projects (residential and commercial) before occupancy; Certificate of Occupancy required prior to occupancy and generally required by lending institutions before final release of construction funds

Applies to: Solar PV Permit

  1. 1

    Framing/Structural

    Racking and roof-penetration/structural attachment inspection, consistent with the Town's general Foundation/Framing inspection practice

  2. 2

    Rough-In Electrical

    Wiring, box placement, and disconnect placement before concealment

  3. 3

    Final / Certificate of Occupancy

    System energized and verified; builders must notify the Building Department for final inspection before occupancy

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring, box placement, and service connections before walls are closed; Building Department prefers electrical rough-in be combined with mechanical/framing rough-in on the same inspection call

  2. 2

    Final

    Devices installed, panel labeled, protections verified per adopted NEC edition

Applies to: Fence Permit

  1. 1

    Property Pin Location

    Site inspection to verify property pin location before fence installation

  2. 2

    Final

    Final inspection of completed fence against the approved permit and site plan

Applies to: Fire Suppression (Sprinkler) System Permit

  1. 1

    Rough-In / Underground

    Underground piping and rough sprinkler/standpipe installation inspected before concealment; no dedicated fire-suppression inspection checklist is published by the Town, so this follows the same rough-in/final pattern documented for the Town's other trade permits

  2. 2

    Final / Certificate of Occupancy

    System tested and verified operational; builders must notify the Building Department for final inspection before occupancy, per the Town's general Certificate of Occupancy procedure

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork, gas piping, and mechanical equipment rough-in inspected before concealment; Building Department prefers mechanical rough-in be combined with framing/electrical rough-in on the same inspection call

  2. 2

    Final

    Equipment operational; venting, combustion air, and clearances verified

Applies to: Plumbing Permit

  1. 1

    Rough-In

    Underground/slab and rough-in piping inspected before concealment; Building Department prefers rough-in inspections be combined where possible

  2. 2

    Final

    All fixtures connected, water heater and venting verified, no leaks

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Manhattan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Manhattan building permits

Get alerts for Manhattan

We'll email you when Manhattan's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.