Commercial Building Permit (New Construction, Addition, Remodel, Tenant Improvement) — Manhattan, Montana · Requirements sheet
Verified 2026-08-26 · Source: https://www.townofmanhattan.com/building-zoning
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit (New Construction, Addition, Remodel, Tenant Improvement) in Manhattan, Montana
Required for construction, enlargement, alteration, repair, moving, or demolition of a commercial building or enclosed structure greater than 200 square feet within Manhattan town limits, under the same Town Code 12-1-2.A authority that governs residential construction. The Town publishes no separate commercial-only application: its 'Residential and Commercial Sub Contractor Building Permit Application' is a single combined form with a 'Commercial' checkbox alongside SFR, Duplex, Remodel, Addition, and Reroof, and also bundles the plumbing, electrical, mechanical, and zoning permits into the same submission. Reviewed against the current model technical codes adopted by the Montana DLI Building Codes Bureau (2021 IBC, effective June 11, 2022) and incorporated by reference per Manhattan Town Code 12-1-1, with plan review and inspections conducted per the rules and procedures of the City of Bozeman Building Code Enforcement Division per Manhattan Town Code 12-1-2.C.
Verified 2026-08-26 · Source
When you need this permit
- Building permit required for construction of any commercial building or enclosed structure greater than 200 square feet (Town Code 12-1-2.A); bundles plumbing, electrical, mechanical, and zoning permits into one application, the same threshold and bundling rule that governs residential construction
- Application made at the Town Office on the Town's combined 'Residential and Commercial Sub Contractor Building Permit Application' — the 'Commercial' box is checked alongside the applicable trade boxes (Plumbing, Mechanical, Electrical); no dedicated commercial-only application form is published
- Reviewed against the current model technical codes adopted by the Montana DLI Building Codes Bureau and incorporated by reference per Town Code 12-1-1 — currently the 2021 IBC, 2021 IEBC, 2021 IMC, 2021 IFGC, 2021 Uniform Plumbing Code, 2021 IECC, 2020 NEC, and ICC A117.1-2017, each effective June 11, 2022 per the Bureau's Current Codes page
- Plans reviewed and inspections conducted per the rules and procedures of the Bozeman City Building Code Enforcement Division (Town Code 12-1-2.C), the same arrangement documented for the Town's residential building permit
- Two sets of plans required; plans must be stamped by a Montana-licensed design professional if project valuation exceeds $100,000, per the Town's Plan Review Check List
- Applicant pays an administrative processing fee plus the cost of plan review and building inspection per a schedule maintained by the building code inspector and available at the Town Office (Town Code 12-1-2.B) — no fixed dollar amounts for commercial work, any more than for residential work, are published in the ordinance text or on the Town website
- Commercial occupants must notify the Building Department at least two weeks prior to their desired occupancy date, ahead of the final inspection required for a Certificate of Occupancy
- A separate Fire Suppression (Sprinkler) System Permit is required for fire suppression/standpipe systems in addition to this building permit — that scope is not part of the building permit itself
- Permit expires if work is not started within 180 days, or if work ceases for 180 days; one-time 180-day extension available by written request; expired permits renewable for 50% of original fee
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing
Foundation sizing, reinforcement, and anchor bolt placement verified before concealment, per the same Building Department practice documented for residential construction
- 2
Rough-In (Mechanical, Electrical, Plumbing, Framing)
Requested by phone no later than 4:30 PM the preceding day; the Building Department's preference for combining trade rough-ins on one call applies here the same as on residential projects
- 3
Final / Certificate of Occupancy
Builders must notify the Building Department for final inspection before occupancy; commercial projects require at least two weeks' advance notice ahead of the desired occupancy date
See the full Manhattan inspection guide — scheduling & re-inspection fees →
Tips
- Manhattan has no separate commercial-only building permit application — the Town's single 'Residential and Commercial Sub Contractor Building Permit Application' covers both, with a 'Commercial' checkbox alongside the SFR/Duplex/Remodel/Addition/Reroof options.
- As with every other permit type the Town issues, no commercial fee schedule or plan-review fee figure is published online — dollar amounts are maintained as a document 'available at the town office' per Town Code 12-1-2.B; call (406) 284-3235 or Building Official Brandon Yung at (406) 595-9300 for current figures.
- Commercial occupants must give the Building Department at least two weeks' notice before their desired occupancy date, longer than the day-ahead notice the Town asks for routine inspections.
- Fire suppression (sprinkler) systems are permitted separately — see the Town's Fire Suppression (Sprinkler) System Permit; it is not part of this building permit's scope.
- The Town's Plan Review Check List published on the Forms page is oriented to single-family residential construction (egress windows, garage-to-house fire door, pony walls); no distinct commercial submittal checklist is published, so plan content for a commercial project is governed by the adopted IBC and Bozeman's review practice rather than by a Manhattan-specific checklist.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-26.
Fee schedules
Applications & forms
Online permit portal
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Manhattan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Manhattan.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Manhattan
Commercial Building Permit (New Construction, Addition, Remodel, Tenant Improvement) in other cities
Look up this fee in a different city →
Now live
Build your Manhattan project checklist
Describe your project once and get every permit, document, and fee it triggers in Manhattan — in one checklist. Free, for any city and any number of projects.
Get started →