Solar PV Permit — Manhattan, Montana · Requirements sheet
Verified 2026-07-20 · Source: https://www.townofmanhattan.com/s/10-How-to-obtain-a-building-permit.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar PV Permit in Manhattan, Montana
Required for installation of rooftop or ground-mounted solar photovoltaic systems within Manhattan town limits. Manhattan holds full Montana DLI certification across Building (B), Mechanical (M), Plumbing (P), Electrical (E), and Swimming Pool (SP), so both the structural/racking scope and the electrical interconnection scope of a PV installation are permitted locally by the Town (not routed to the state), bundled into the same combined Building/Electrical/Mechanical/Plumbing Permit Application used for all other construction. No dedicated Solar/Photovoltaic line item or checklist is published separately from this general application.
Verified 2026-07-20 · Source
When you need this permit
- A building permit is required for construction of any building or enclosed structure greater than 200 square feet (Town Code 12-1-2.A); ground-mounted PV arrays exceeding this threshold would require a building permit on that basis, and any PV installation's electrical interconnection independently requires the bundled electrical permit component regardless of footprint
- Application bundles the building, plumbing, electrical, and zoning permit into a single combined application per Town Code 12-1-2.A — there is no separate standalone Solar/Photovoltaic application form published on the Town's Forms page
- Plans reviewed and inspections conducted per the rules and procedures of the City of Bozeman Building Code Enforcement Division (Town Code 12-1-2.C)
- Governed by the current model technical codes (2021 IBC/IRC for structural/racking scope, 2020 NEC for electrical interconnection) as adopted by the Montana DLI Building Codes Bureau and incorporated by reference per Town Code 12-1-1
- Two sets of plans required; plans must be stamped by a Montana-licensed design professional if project valuation exceeds $100,000
- Applicant pays an administrative processing fee plus the cost of plan review and building inspection per a schedule maintained by the building code inspector and available at the Town Office (Town Code 12-1-2.B) — no fixed dollar amounts are published in the ordinance text or on the Town website for any permit type, including solar
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Framing/Structural
Racking and roof-penetration/structural attachment inspection, consistent with the Town's general Foundation/Framing inspection practice
- 2
Rough-In Electrical
Wiring, box placement, and disconnect placement before concealment
- 3
Final / Certificate of Occupancy
System energized and verified; builders must notify the Building Department for final inspection before occupancy
See the full Manhattan inspection guide — scheduling & re-inspection fees →
Tips
- There is no separate Solar/Photovoltaic permit application in Manhattan — a PV installation is filed on the same combined Building/Electrical/Mechanical/Plumbing Permit Application used for all other construction, since the Town holds full DLI certification (B, M, P, E, SP) and issues all trade permits locally.
- As with every other permit type in Manhattan, no fee schedule is published online — dollar amounts for plan review and inspection costs are maintained as a document 'available at the town office' per Town Code 12-1-2.B; call (406) 284-3235 or Building Official Brandon Yung at (406) 595-9300 for current figures.
- Because plan review and inspection procedures follow the City of Bozeman Building Code Enforcement Division's rules (Town Code 12-1-2.C), applicants familiar with Bozeman's solar permitting process may find similar procedural expectations apply here, even though Manhattan issues its own permit.
- Re-chased 2026-07-20: independently re-fetched Town Code 12-1-2 directly (codelibrary.amlegal.com/codes/manhattanmt/latest/manhattan_mt/0-0-0-6411) and confirmed the exact fee-mechanism text — "fee for processing the application and shall further pay for the cost of the plan review and building inspection as set out in a schedule provided by the [building code inspector]" — no dollar figure is published anywhere in the ordinance itself, consistent with the Town Office-only availability already documented. Also checked the Montana DEQ/Montana Renewable Energy Association "Permitting Processes for Solar Photovoltaic Systems in Montana" report (deq.mt.gov, July 2013) for a Manhattan-specific historical fee figure; the report is 13 years old and its per-jurisdiction fee table was judged too stale to cite as a current governing figure, so it was not used.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Manhattan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Manhattan
Solar PV Permit in other cities
Compare solar pv permit fees across Montana →
Look up this fee in a different city →
Now live
Build your Manhattan project checklist
Describe your project once and get every permit, document, and fee it triggers in Manhattan — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →