Sign Permit — Manhattan, Montana · Requirements sheet
Verified 2026-07-22 · Source: https://www.townofmanhattan.com/s/Sign-Permit-3nsh.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Manhattan, Montana
Required for installation of permanent signage within Manhattan town limits, per Manhattan Town Code 10-15-4. Temporary signs are exempt from the permit requirement but are restricted in timing and mounting. Applications are submitted on the Town's dedicated Sign Permit Application form (separate from the combined Building/Electrical/Mechanical/Plumbing Permit Application used for most other permit types in this record), which requires site plan review and sign design documentation.
Verified 2026-07-22 · Source
When you need this permit
- Permanent signs require a Sign Permit per Manhattan Town Code 10-15-4; temporary signs are exempt from the permit but may be placed no earlier than 8 hours before an event and must be removed within 8 hours after, must be freestanding, and cannot be attached to poles or other permanent structures
- No signage is permitted on State Highways (S Broadway, N 5th, and Main Street)
- Application must identify site business name/address, property owner, business owner, sign contractor, existing signage to remain (type, copy, area, prior permit number), and the new signage requested (sign type, area, height, value, sign copy/text, whether the sign projects over the public right-of-way)
- Application must state the total sign area (including signage to remain), the applicable zone, and the building's frontage in linear feet
- Complete application requires: scaled elevation plans; a site plan (if applicable); an 8.5" x 11" color rendering of the sign; and an equivalent electronic image (JPG)
- Signed by both the applicant and the property owner
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
See the full Manhattan inspection guide — scheduling & re-inspection fees →
Tips
- Manhattan uses a dedicated Sign Permit Application, separate from the combined Building/Electrical/Mechanical/Plumbing Permit Application used for most other permit types in this record.
- Temporary signs (e.g., event signage) do not require a Sign Permit, but must be freestanding, may not be placed more than 8 hours before an event, and must be removed within 8 hours after — and no signage of any kind, temporary or permanent, is allowed along the town's State Highway frontages (S Broadway, N 5th, and Main Street).
- Unlike several other permit types in this record, the Sign Permit form publishes a fixed dollar fee ($75.00) directly on the application rather than referring applicants to an unpublished fee schedule at the Town Office.
- No inspection procedure for signage is published by the Town — unlike the Fence Permit, which explicitly requires two site inspections, the Sign Permit Application does not describe an inspection step.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Manhattan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Manhattan's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Manhattan yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Manhattan lands. Privacy.
Other permits in Manhattan
Sign Permit in other cities
Compare sign permit fees across Montana →
Look up this fee in a different city →
Now live
Build your Manhattan project checklist
Describe your project once and get every permit, document, and fee it triggers in Manhattan — in one checklist. Free, for any city and any number of projects.
Get started →