Stevensville building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Stevensville, Montana.
Verified 2026-07-04 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 206 Buck Street, Stevensville, MT 59870 (mailing: PO Box 30, Stevensville, MT 59870)
- Phone
- (406) 777-5271
- Office hours
- Town Hall main line (406) 777-5271, Building Office extension 105. Regular inspection hours: Monday, Wednesday, and Friday, 10:00 am - 12:30 pm (inspections by appointment only, 24 hours' notice required). Building Inspector Tim Netzley: (406) 880-5832. Inspection scheduling / general inspector line: (406) 552-3238, INSPECTOR@constructmt.com. Source: Town of Stevensville Building page (townofstevensville.com/building) and Building FAQs page (townofstevensville.com/building/page/building-faqs).
- Website
- Official site
Inspection sequence
Applies to: Building Permit (New Construction / Addition / Remodel)
- 1
Footing/Foundation
Before concrete pour, per the Town's required-inspections list (Building FAQs page)
- 2
Framing
Structural framing per approved plans before walls are closed
- 3
Insulation
Insulation inspection prior to enclosing walls, per the Town's required-inspections list
- 4
Final
Completed work verified against approved plans; Building Official sign-off required before occupancy
Applies to: Electrical Permit
- 1
Rough-In / Prior to Covering
Installer must call for inspection prior to covering electrical work
- 2
Final
Devices installed, panel labeled, and safety verified per 2017 NEC before permit final
Applies to: EV Charger / EVSE Permit
- 1
Rough-In / Prior to Covering
Installer must call for inspection prior to covering the charger circuit wiring
- 2
Final
Charging equipment installed and safety verified per 2017 NEC before permit final
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork, gas piping, and mechanical equipment rough-in before walls closed
- 2
Final
Equipment operational, clearances and venting verified
Applies to: Plumbing Permit
- 1
Rough-In
After pipes installed, before walls closed
- 2
Final
All fixtures connected, water heater and venting verified, no leaks
Applies to: Residential/Commercial Solar Photovoltaic (PV) Permit
- 1
Rough-In / Prior to Covering
Interconnection wiring, disconnect placement, and conduit before energizing; installer must call for inspection prior to covering electrical work, per the same mechanism documented for Stevensville's general Electrical Permit entry.
- 2
Final
Panel/array wiring complete, disconnect labeled, system verified per the 2017 NEC before permit final and utility interconnection.
Final inspection only: Change of Use / Change of Occupancy Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Stevensville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Stevensville building permits
Get alerts for Stevensville
We'll email you when Stevensville's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.