EV Charger / EVSE Permit in Stevensville, Montana
The Town of Stevensville has no dedicated electric-vehicle-charging-station permit or fee line. As a Montana DLI-certified jurisdiction for electrical (E) permitting, the Town issues and inspects an EV charger circuit through its standard Electrical Permit (2017 NEC as adopted), with the fee computed from the same itemized Electrical Permit Application fee table used for any other residential electrical work — most closely the 'New addition, remodel, interior rewire' line ($100.00) for a new dedicated circuit, or 'Misc. work not considered interior remodel/rewire' ($30.00) for simpler scope. No EV/EVSE-specific dollar figure was found published.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit required for the EV charger circuit, governed by the 2017 NEC as adopted by the Town — same requirement and application track as this file's Electrical Permit entry
- Montana state license number required for licensed electrical contractors; a homeowner may secure the permit and perform the work only in a private structure occupied for their own personal use
- Work must commence within 180 days of permit issuance
- Installer must call for inspection prior to covering the electrical work
- No dedicated EV/EVSE line-item was found on the Town's Electrical Permit Application fee table
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In / Prior to Covering
Installer must call for inspection prior to covering the charger circuit wiring
- 2
Final
Charging equipment installed and safety verified per 2017 NEC before permit final
See the full Stevensville inspection guide — scheduling & re-inspection fees →
Tips
- Stevensville has no EV-specific permit category — apply through the standard Electrical Permit application, and expect the fee to land on the 'New addition, remodel, interior rewire' line ($100) for a typical new dedicated circuit, or the flat $30 'Misc. work' line for simpler scope.
- If your installation requires a service panel upgrade to support the charger's amperage, budget for the separate $75 Service change-out/upgrade fee in addition to the circuit fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Stevensville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Stevensville
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Montana →
Look up this fee in a different city →
Related guides
Now live
Build your Stevensville project checklist
Describe your project once and get every permit, document, and fee it triggers in Stevensville — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →