Residential/Commercial Solar Photovoltaic (PV) Permit — Stevensville, Montana · Requirements sheet
Verified 2026-07-20 · Source: https://bsd.dli.mt.gov/building-codes-permits/alternative-energy-information/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential/Commercial Solar Photovoltaic (PV) Permit in Stevensville, Montana
Required for installation of a rooftop or ground-mounted solar photovoltaic system in Stevensville. Because Stevensville is a Montana DLI-certified jurisdiction for the Electrical (E) trade (in addition to Building, Plumbing, Mechanical, and Swimming Pool), solar PV is permitted locally by the Town rather than routed to the state — per the Montana DLI Building Codes Bureau's own published Alternative Energy Information guidance, a licensed electrical contractor applies for a standard Electrical Permit and selects 'solar' on the application, a non-electrician installer submits an Alternate Energy Permit with solar information, and a homeowner may use the homeowner electrical permit option with solar information provided. The fee is based on the total value of the electrical work, including the solar equipment, using the same Commercial valuation-based tier documented in the Electrical Permit entry.
Verified 2026-07-20 · Source
When you need this permit
- Licensed electrical contractors apply for a standard Town of Stevensville Electrical Permit and select 'solar' on the application, per Montana DLI Building Codes Bureau Alternative Energy Information guidance
- A homeowner performing their own PV installation on their own owner-occupied residence may use the homeowner electrical permit option (per Montana statute, as documented in the Electrical Permit entry) and must provide solar-specific system information on the application Owner-builder
- A non-electrician solar installer (i.e., a solar-specific contractor who is not itself a licensed Montana electrical contractor) submits an Alternate Energy Permit with solar information rather than a standard Electrical Permit, per the same DLI guidance
- All grid-tied systems require a Montana-licensed electrical contractor for the interconnection wiring itself, even if a non-electrician installer handles the mounting/racking
- Fee is based on the total value of the electrical work, including the solar equipment — billed under the same Commercial valuation-based fee tiers already documented in the Electrical Permit entry, since Stevensville's own fee schedule does not carry a separate flat residential-solar line
- Structural/racking work is permitted via the standard Town of Stevensville Building Permit (Table of valuation-based fees documented elsewhere in this record), governed by the 2018 IBC/IRC as locally adopted
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Town of Stevensville Electrical Permit Application, Commercial fee table — the same table already documented in the Electrical Permit entry; Show full citationHide
Town of Stevensville Electrical Permit Application, Commercial fee table — the same table already documented in the Electrical Permit entry; the Town's own MEP fee documents do not carry a distinct flat residential-solar line, so solar is billed on total electrical-work value using this valuation tier, consistent with the Montana DLI Building Codes Bureau's own statement that 'the fee is based on the total value of the electrical work, including solar.'Review timeline
Inspection process
- 1
Rough-In / Prior to Covering
Interconnection wiring, disconnect placement, and conduit before energizing; installer must call for inspection prior to covering electrical work, per the same mechanism documented for Stevensville's general Electrical Permit entry.
- 2
Final
Panel/array wiring complete, disconnect labeled, system verified per the 2017 NEC before permit final and utility interconnection.
See the full Stevensville inspection guide — scheduling & re-inspection fees →
Tips
- Stevensville is one of the few jurisdictions in this batch that is FULLY DLI-certified for Electrical, so solar PV permitting stays entirely local rather than being split between the Town and the State — confirm this distinction if you are used to a neighboring Montana town (e.g., Toole County or Townsend) that routes electrical, including solar, to the state DLI Building Codes Bureau instead.
- The exact permit type depends on who performs the work: a licensed Montana electrical contractor uses the standard Electrical Permit (select 'solar'); a non-electrician solar installer uses an Alternate Energy Permit with solar information; and a qualifying homeowner may use the homeowner electrical permit option — confirm which applies with the Building Office, (406) 777-5271 ext. 105.
- No Montana statewide fee cap (of the kind Colorado's C.R.S. § 24-48.5-113 provides) applies here — Stevensville's own Commercial valuation-based Electrical Permit fee tiers govern the full cost of the interconnection work.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Stevensville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Stevensville's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Stevensville yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Stevensville lands. Privacy.
Other permits in Stevensville
Residential/Commercial Solar Photovoltaic (PV) Permit in other cities
Compare residential/commercial solar photovoltaic (pv) permit fees across Montana →
Look up this fee in a different city →
Now live
Build your Stevensville project checklist
Describe your project once and get every permit, document, and fee it triggers in Stevensville — in one checklist. Free, for any city and any number of projects.
Get started →