Swimming Pool / Spa Permit in Mesquite, Nevada

Required for installation of in-ground or above-ground swimming pools, spas, and water features in Mesquite. Governed by the 2024 International Swimming Pool and Spa Code (ISPSC) with Southern Nevada and City of Mesquite amendments.

Verified 2026-06-30 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Pool/Spa Permit — water surface area$34.10/sq ft of water surface areaMesquite City Code §7-1-3, Table 3-J (Ord. B23-009): Swimming Pools and Spas water surface = $34.10/sq ft. Compute total valuation, then apply Table 3-A
Pool Deck$5.00/sq ftTable 3-J: Pool (kool) Deck = $5.00/sq ft — used for valuation of pool deck area
Pool Electrical/Plumbing$6.50/sq ftTable 3-J: Pool Electrical/Plumbing = $6.50/sq ft — added to total project valuation
Sewer Impact Fee (Residential)$190.00 per poolTable 3-J: Sewer Impact (Res) = $190.00/pool
Plan Review Fee65% of building permit feeMesquite City Code §7-1-3, Item 9
Administrative Fee10% of building permit feeMesquite City Code §7-1-3, Item 10

Review timeline

~520 business days

Typical estimate — confirm current times with the Mesquite building department

Inspection process

  1. 1

    Pre-Gunite / Pre-Pour

    Before shell is poured — verify shell reinforcement, plumbing rough-in, and barrier footing

  2. 2

    Barrier / Fence

    Pool barrier/fence must be in place and verified per 2024 ISPSC requirements before any water is placed

  3. 3

    Final

    Equipment operational, barrier complete, electrical verified, drainage verified

Tips

Frequently asked questions

How is the swimming pool permit fee calculated in Mesquite?
Mesquite uses a valuation-based approach. The water surface area is valued at $34.10/sq ft; the pool deck at $5.00/sq ft; electrical/plumbing at $6.50/sq ft. Sum these valuations, then apply Table 3-A to compute the building permit fee. A 65% plan review fee, 10% admin fee, and $190.00 sewer impact fee also apply. Contact the Building Division at (702) 346-2835.

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Mesquite building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Mesquite

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.