Required for demolition of structures in Mesquite. The city's permit portal and general building permit page list demolition as a distinct permit type.

Verified 2026-06-30 · Source

When you need this permit

  • Full or partial demolition of any structure
  • Demolition of accessory structures above a minimum threshold
  • All utilities must be disconnected before demolition begins

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Demolition Permit — Dwelling StructureMesquite City Code §7-1-3, Table 3-J: Dwelling Structure demolition = $45.00/sq ft
Valuation-based: $45.00/sq ft (Table 3-J, Ord. B23-009), then Table 3-A applied to valuation
Demolition Permit — Commercial StructureMesquite City Code §7-1-3, Table 3-J: Commercial Structure demolition = $85.00/sq ft
Valuation-based: $85.00/sq ft (Table 3-J, Ord. B23-009), then Table 3-A applied to valuation
Plan Review FeeMesquite City Code §7-1-3, Item 9
65% of building permit fee
Administrative FeeMesquite City Code §7-1-3, Item 10
10% of building permit fee

Review timeline

Plan reviewTypical estimate — confirm current times with the Mesquite building department
~2–10 business days

How long did your Demolition Permit permit actually take in Mesquite?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Site Verification

    Verify utilities have been disconnected and site is cleared per approved demo plan

  2. 2

    Final

    Site cleared, demolition waste removed, site stabilized

See the full Mesquite inspection guide — scheduling & re-inspection fees →

Tips

  • Confirm utility disconnections (electric, gas, water, sewer) before demolition begins.
  • Contact the Building Division at (702) 346-2835 or buildingpermits@mesquitenv.gov for required demolition documentation.

Frequently asked questions

Yes. A demolition permit is required in Mesquite. The permit fee is valuation-based: residential structures are valued at $45.00/sq ft (Table 3-J); commercial at $85.00/sq ft. Apply at mesquite.onlinegovt.com or contact the Building Division.

In Mesquite, the published Demolition Permit — Dwelling Structure is: Valuation-based: $45.00/sq ft (Table 3-J, Ord. B23-009), then Table 3-A applied to valuation. Additional published fees: Demolition Permit — Commercial Structure — Valuation-based: $85.00/sq ft (Table 3-J, Ord. B23-009), then Table 3-A applied to valuation; Plan Review Fee — 65% of building permit fee; Administrative Fee — 10% of building permit fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a demolition permit in Mesquite typically runs 2–10 business days. This is an estimate, not a published figure — confirm current review times with City of Mesquite Building Division (Development Services) at (702) 346-2835.

You'll need: Demolition Permit Application. See the required-documents checklist on this page for details on each.

Mesquite requires 2 inspection(s) for a demolition permit, in order: Site Verification, Final. Schedule each through City of Mesquite Building Division (Development Services) ((702) 346-2835).

Apply through City of Mesquite Building Division (Development Services) at 10 E. Mesquite Blvd., Mesquite, NV 89027. Phone: (702) 346-2835, email: buildingpermits@mesquitenv.gov. Office hours: Mon–Thu 7:30 AM – 5:00 PM (Fri–Sun closed). Official information: https://www.mesquitenv.gov/resources/building-divison.

Mesquite, Nevada has adopted: 2024 International Building Code (IBC) — with Southern Nevada and City of Mesquite amendments; adopted Ord. B25-013, eff. Aug. 12, 2025; 2024 International Residential Code (IRC) — with Southern Nevada and City of Mesquite amendments; adopted Ord. B25-012, eff. Aug. 12, 2025; 2024 International Energy Conservation Code (IECC) — adopted with City of Mesquite amendments, eff. Aug. 12, 2025; 2024 Uniform Mechanical Code (UMC) — published by IAPMO; adopted with City of Mesquite amendments, eff. Aug. 12, 2025; 2024 Uniform Plumbing Code (UPC) — published by IAPMO; adopted with City of Mesquite amendments, eff. Aug. 12, 2025; 2023 National Electrical Code (NEC) — adopted with City of Mesquite amendments, eff. Aug. 12, 2025; 2024 International Swimming Pool and Spa Code (ISPSC) — Southern Nevada amendments with City of Mesquite amendments; adopted Ord. B25-009, eff. Aug. 12, 2025; 2024 International Existing Building Code (IEBC) — Southern Nevada amendments; adopted Ord. B25-011, eff. Aug. 12, 2025; 1997 Uniform Administrative Code (UAC) — with City of Mesquite amendments governing permit issuance and fee collection; fee schedule last amended Ord. B23-009, Jul. 11, 2023. Local amendments apply — see the Mesquite overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Mesquite building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.