Change of Occupancy / Certificate of Occupancy in Elko, Nevada
Elko Municipal Code Section 2-1-4(A)(1) requires anyone who 'changes the occupancy capacity of a building or structure' to first obtain a building permit — the same general permit-application mechanism used for demolition and other regulated activities under Title 2, Chapter 1; no distinct change-of-use-specific application, checklist, or fee schedule is separately published by the City. Section 2-1-9 (Certificate of Occupancy) separately and additionally requires that no building or structure be used or occupied, and no change in the existing occupancy classification be made, until the building official has issued a Certificate of Occupancy (or, for a 'shell' building not yet intended for occupancy, a Certificate of Completion).
Verified 2026-07-22 · Source
When you need this permit
- A permit is required before 'changing the occupancy capacity' of a building or structure, per Elko Municipal Code Section 2-1-4(A)(1) — submitted via the universal Building Permit Application Form (Bldg box checked, work described as a change of occupancy/use); no distinct change-of-use-specific application, checklist, or fee schedule is published (confirmed by review of the Building Forms, Building Fees, and Building Codes/Design Standards pages, the same gap this data set's Demolition Permit entry documents for that activity)
- No building or structure may be used or occupied, and no change in the existing occupancy classification of a building, structure, or portion thereof may be made, until the building official has approved it for use/occupancy by issuing a Certificate of Occupancy, per Elko Municipal Code Section 2-1-9(A)(1)
- A Certificate of Occupancy does not approve or waive any violation of the Code and creates no warranty or guarantee, express or implied (Section 2-1-9(A)(1)); a final inspection is equivalent to a Certificate of Occupancy for buildings classified in Occupancy Group U
- A Certificate of Completion (rather than a Certificate of Occupancy) may be issued for a building constructed as a 'shell' and not yet intended for occupancy (Section 2-1-9(A)(1))
- Buildings/structures that were compliant when built and occupied but were later rendered noncompliant solely by a subsequent Code amendment are not required to obtain a new Certificate of Occupancy to continue that existing use — unless the use or occupancy is thereafter discontinued or abandoned for twelve (12) months or more, in which case a new Certificate of Occupancy certifying compliance with then-current Code requirements is required before any subsequent use (Section 2-1-9(A)(3))
- The building official may temporarily suspend or permanently revoke a Certificate of Occupancy/Completion if it was issued in error, based on incorrect information, if written conditions were not completed, or if the building is found in violation of the Code (Section 2-1-9(B)(2))
- The City will not provide water service to a building or structure that has not received a Certificate of Occupancy (Section 2-1-9(D))
- Occupying or authorizing occupancy of a building without a required Certificate of Occupancy subjects the property owner to the Title 2 penalty provisions cross-referenced at Section 2-1-12 (Section 2-1-9(C))
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final
Building inspected for compliance with the applicable Title 2 requirements for the proposed use/occupancy before a Certificate of Occupancy (or Certificate of Completion) is issued, per Section 2-1-9(B)(1)
See the full Elko inspection guide — scheduling & re-inspection fees →
Tips
- No dedicated change-of-occupancy/change-of-use permit application, checklist, or fee schedule exists in the Elko Municipal Code or on the City of Elko Building Department website — the same gap documented for this data set's Demolition Permit entry. Change of occupancy is handled under the universal Building Permit Application using the standard valuation-based Table 1 fee, per Municipal Code Section 2-1-4(A)(1)'s general permit requirement covering anyone who 'changes the occupancy capacity' of a building.
- The City will not provide water service to a building that has not received a Certificate of Occupancy (Section 2-1-9(D)) — a practical enforcement mechanism distinct from any fine or penalty.
- If a legally grandfathered use is discontinued or abandoned for 12 months or more, a brand-new Certificate of Occupancy showing compliance with then-current Code requirements is required before resuming any use, even though the original use never needed one (Section 2-1-9(A)(3)).
- No review-timeline figure (published or coded) exists specifically for change of occupancy; the Municipal Code's only relevant timing provision is the same 10-day post-approval permit-issuance clock (Section 2-1-5(N)) applied to all building permits, not a plan-review duration. Call the Building Department at (775) 777-7220 to confirm current expected turnaround.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Elko building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Elko
Change of Occupancy / Certificate of Occupancy in other cities
Compare change of occupancy / certificate of occupancy fees across Nevada →