Winnemucca building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Winnemucca, Nevada.

Verified 2026-07-03 · Source

How to schedule

Inspections are requested through the building department below.

Address
90 W. Fourth Street, Winnemucca, NV 89445
Phone
(775) 623-6319
Office hours
City of Winnemucca Building Department, 90 W. Fourth Street, Winnemucca, NV 89445. Phone (775) 623-6319, fax (775) 623-6321 (per City of Winnemucca Basic Design Criteria handout) / (775) 623-6090 or (775) 623-6321 listed as fax on different department handouts. This is a distinct department from the Humboldt County Building Department (25 W. Fourth Street, (775) 623-6322), though both offices are located on Fourth Street in Winnemucca and jointly co-authored the Single Family Residence Permit Guide. All inspections require 24 hours notice; call (775) 623-6319 to schedule.

Published scheduling rules

  • All inspections must be requested at least one business day in advance; after-hours call-ins are logged the next business day. Call (775) 623-6319 to schedule. (Residential Building Permit (New Construction / Single-Family Dwelling))
  • Before demolishing any non-residential structure containing plumbing fixtures, an inspection must be scheduled so the number of plumbing fixtures can be counted and recorded; a sewer/water connection fee credit will be applied to a new structure built on the same property if the new permit is obtained within five years of the sewer/water fixture demolition and the number of removed plumbing connections is on record (Demolition Permit)
  • A final inspection must be requested upon completion of the demolition; before scheduling the final inspection, all concrete and debris must be removed from the lot, all holes and depressions filled in, and the lot rough-graded (Demolition Permit)

Inspection sequence

Applies to: Residential Building Permit (New Construction / Single-Family Dwelling)

  1. 1

    Exterior Utilities

    Building sewer, cleanouts, water lines, electrical conduit (customer side)

  2. 2

    Foundation Inspection

    Setbacks, footings, rebar, anchor bolts, Ufer ground, postholes; for manufactured homes: blocking and tie-downs

  3. 3

    Stemwall/Basement Walls/Retaining Wall

    Forms, rebar, hold-downs, anchor bolts; grout lifts checked at 4', 8', and 12' vertical/horizontal rebar placement

  4. 4

    Preslab

    Underslab plumbing, pipes wrapped, slab base, slab thickness, visqueen, insulation

  5. 5

    Underfloor Inspection

    Framing, plumbing, mechanical ducts, electrical, gas line, access

  6. 6

    Underfloor Insulation

    Stemwall insulation (no vents), floor joist insulation (vents)

  7. 7

    Roof Sheathing Inspection

    Roof sheathing nailing, trusses, roof framing, clips, bracing, vents

  8. 8

    Shear/Braced Wall Nailing

    Exterior shear/braced wall nailing, hold-downs, drag straps, header

  9. 9

    All Roughs

    Framing, plumbing, mechanical, electrical, sewer and water line tests

  10. 10

    Insulation

    Walls, ceiling (if batts), baffles at eave vents, insulation markers for blow-in insulation

  11. 11

    Lath

    Lath nailing/staple, seal penetrations, foam board, building paper, weep screed

  12. 12

    Drywall Nailing

    Drywall nailing inspection prior to taping/finishing

  13. 13

    Utilities

    Temporary electrical, temp gas, water test, sewer test

  14. 14

    Final Inspection

    Required on all permits; final sign-off is required for occupancy — the signed-off inspection card is the Certificate of Occupancy

Applies to: Residential Addition / Remodel Permit

  1. 1

    Foundation/Footing

    Setbacks, footings, rebar, anchor bolts for addition foundations

  2. 2

    Framing (All Roughs)

    Framing, plumbing, mechanical, electrical rough-in for the addition, and connection to the existing structure

  3. 3

    Insulation

    Walls, ceiling, and floor joist insulation verified before drywall

  4. 4

    Final Inspection

    Required on all permits; final sign-off is required for occupancy

Applies to: Demolition Permit

  1. 1

    Plumbing Fixture Count (non-residential structures only)

    Scheduled before demolition of any non-residential structure containing plumbing fixtures, to count and record fixtures for the sewer/water connection fee credit

  2. 2

    Sewer Line Exposure

    Sewer line must be exposed at the property line, cut and plugged, and inspected/approved before covering

  3. 3

    Final Inspection

    Requested upon completion; all concrete and debris removed, holes/depressions filled, lot rough-graded

Applies to: Plumbing Permit

  1. 1

    Underground/Preslab

    Underslab plumbing, pipes wrapped, before concrete pour

  2. 2

    Rough-In

    After pipes installed, before walls are closed (part of the combined 'All Roughs' inspection)

  3. 3

    Final

    All fixtures connected and verified per the 2012 UPC; sewer/water line tests recorded under 'Utilities' on the inspection card

Applies to: Commercial / Industrial Building Permit

  1. 1

    Phased inspections per inspection record form (job card)

    The job card issued with the permit lists the required inspections for the specific project; they must be performed in the sequence shown, called in 24 hours in advance, and no work may be covered before it receives an approved inspection. The guide prints the County inspection line ((775) 623-6322); for City of Winnemucca projects the City Building Department inspection line is (775) 623-6319 per the City's own handouts documented elsewhere in this record. The guide publishes no fixed commercial inspection list — it is project-specific via the job card.

  2. 2

    Final

    Fire code review must be completed, and all required agency approvals (water and sanitation verification) presented, before the final inspection is requested; a certificate of occupancy is issued after passing all required inspections including the final — consistent with the 'signed-off job card IS the Certificate of Occupancy' practice documented in the department note

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring, box placement, and service connections verified before walls are closed (covered under the 'All Roughs' combined inspection on new construction)

  2. 2

    Final

    Devices installed and panel verified per the 2011 NEC

Applies to: EV Charger Installation Permit

  1. 1

    Rough-In

    Charger circuit wiring and connections verified before walls are closed, where applicable

  2. 2

    Final

    Charger installed and connections verified per the 2011 NEC

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and mechanical equipment rough-in before walls are closed; gas piping tested before concealment (part of the combined 'All Roughs' inspection)

  2. 2

    Final

    Equipment operational and verified per the 2012 UMC

Applies to: Re-Roofing Permit

  1. 1

    Roof Sheathing Inspection

    Roof sheathing nailing, trusses, roof framing, clips, bracing, vents

  2. 2

    Final Inspection

    Roofing materials and installation verified complete

Applies to: Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before cover, per the 2017 NEC as referenced in the joint Submittal Guide

  2. 2

    Final

    Racking, roof/ground-mount attachment, electrical connections, and required NEC warning/rapid-shutdown signage verified

Winnemucca building permits

Get alerts for Winnemucca

We'll email you when Winnemucca's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.