Demolition Permit in Winnemucca, Nevada
Required to demolish any building over 200 square feet, any one-story-or-taller building, or any building with plumbing fixtures, within Winnemucca city limits. Requires a completion/surety bond before work begins.
Reviewed 2026-07-03 · Source
When you need this permit
- A demolition permit is required to demolish any building over 200 square feet; or one story in height; or any building with plumbing fixtures, per the City of Winnemucca 'Demolition Permit' handout
- A completion (surety) bond must be posted before beginning demolition, in the amount of $0.50 per square foot of the building to be demolished or $500.00, whichever is greater
- Before demolishing any non-residential structure containing plumbing fixtures, an inspection must be scheduled so the number of plumbing fixtures can be counted and recorded; a sewer/water connection fee credit will be applied to a new structure built on the same property if the new permit is obtained within five years of the sewer/water fixture demolition and the number of removed plumbing connections is on record
- The sewer line must be exposed at the property line, cut and plugged, and inspected/approved by the Building Department before it may be covered
- A final inspection must be requested upon completion of the demolition; before scheduling the final inspection, all concrete and debris must be removed from the lot, all holes and depressions filled in, and the lot rough-graded
- A Demolition Permit Supplement form must be completed, specifying the address, owner, contractor, number of each type of plumbing fixture, type of structure, type of construction, number of stories, and total floor area (used to calculate the bond value at $0.50/sq ft)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
City of Winnemucca 'Demolition Permit' handout; Show full citationHide
City of Winnemucca 'Demolition Permit' handout; posted before demolition begins and released upon Building Department approval of the completed demolition. CITATION NOTE (2026-07-16): the source PDF is no longer reachable at its original winnemuccacity.org URL (the City's site has migrated to a new platform) and no live successor document was found on winnemuccacity.org or humboldtcountynv.gov after checking the Building Department's Handouts, Application Forms, and Permits pages. This bond figure is retained from the 2020 Wayback capture but is NOT independently confirmed current — verify directly with the Building Department, (775) 623-6322 (Humboldt County) or (775) 623-6319 (City), before relying on it.Review timeline
Inspection process
- 1
Plumbing Fixture Count (non-residential structures only)
Scheduled before demolition of any non-residential structure containing plumbing fixtures, to count and record fixtures for the sewer/water connection fee credit
- 2
Sewer Line Exposure
Sewer line must be exposed at the property line, cut and plugged, and inspected/approved before covering
- 3
Final Inspection
Requested upon completion; all concrete and debris removed, holes/depressions filled, lot rough-graded
See the full Winnemucca inspection guide — scheduling & re-inspection fees →
Tips
- No demolition-permit-specific review timeline is published by the City of Winnemucca; the 'Demolition Permit' handout describes bonding, inspection, and final-inspection requirements but states no plan-review turnaround figure. Confirm current turnaround directly with the Building Department at (775) 623-6319.
- If you plan to rebuild on the same lot, obtain the new building permit within five years of the demolition's sewer/water fixture removal to preserve the connection-fee credit — the credit depends on the plumbing fixture count being on record from the pre-demolition inspection.
- Do not cover the exposed, cut, and plugged sewer line at the property line until the Building Department has inspected and approved it.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-03.
Applications & forms
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Winnemucca building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Winnemucca's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Winnemucca yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Winnemucca lands. Privacy.
Other permits in Winnemucca
Demolition Permit in other cities
Compare demolition permit fees across Nevada →