Farmington building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Farmington, New Mexico.

Verified 2026-07-02 · Source

How to schedule

Inspections are requested through the building department below.

Address
805 Municipal Drive, Annex Building, 2nd Floor, Farmington, NM 87401
Phone
(505) 599-1304
Office hours
Mon–Fri 8:00 AM – 5:00 PM. No online permitting or online payment is available; applications and payment (check, money order, cashier's check, or credit card — Discover not accepted) must be made in person at the Annex Building.

Published scheduling rules

  • Call (505) 599-1304 to schedule inspections; requests must be made at least one business day in advance. (Residential Building Permit (New Construction))
  • Call (505) 599-1304 to confirm permit requirements and schedule inspections before starting work. (Residential Mechanical / HVAC Permit)
  • The Fire Marshal's Office is a separate contact from the general Building Inspection line: call (505) 599-1430, Option 1, versus (505) 599-1304 for general building permits. (Fire Sprinkler / Fire Alarm Permit)
  • A Certificate of Occupancy requires inspections from various departments depending on the nature of the occupant; inspections are scheduled and handled by the proper departments (Certificate of Occupancy / Change of Occupancy)
  • Schedule inspections by calling (505) 599-1304 at least one business day in advance; have your permit/application number ready. Electrical Service Connect inspections for the Farmington Electric Utility System are scheduled separately at (505) 599-8310, (505) 599-8312, or (505) 599-8317. (General)

Inspection sequence

Applies to: Fire Sprinkler / Fire Alarm Permit

  1. 1

    Flow Test / Rough-In Inspection

    Flow testing of the underground water supply for sprinkler systems and rough-in inspections, performed by the Fire Marshal's Office per its published Fire Inspections process.

  2. 2

    Hydro Pressure Test & Fire Supply Line Flush

    Hydrostatic pressure test and fire supply line flush, performed by the Fire Marshal's Office.

  3. 3

    Sprinkler Final Inspection

    Final inspection of the completed fire sprinkler system, required before the life safety system final is accepted.

  4. 4

    Building Final Inspection

    Building final inspection; the City requires final inspections (including life safety system finals covering fire sprinkler, fire alarm, and hood suppression systems) prior to issuing a Certificate of Occupancy.

Applies to: Certificate of Occupancy / Change of Occupancy

  1. 1

    Departmental Final Inspections

    Inspections from various departments depending on the nature of the occupant (e.g., building, fire/life-safety), scheduled and handled by the proper departments before a Certificate of Occupancy is issued.

  2. 2

    Business License Inspection

    A separate business inspection completed to obtain a business license from the City Clerk's office, in addition to the departmental final inspections.

Sources & verification

Verified against official sources. Last reviewed 2026-07-02.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Farmington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Farmington building permits

Get alerts for Farmington

We'll email you when Farmington's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.