Skip to main content
PermitBase

Sign Permit in Farmington, New Mexico

Required for installation of most signs in Farmington. 'Signs' is explicitly listed among work requiring a permit on the City's 'Do I need a Construction Permit?' page. Sign standards (permitted sign types, height/area limits, and which signs may be exempt) are governed by UDC Article 5 — Development Standards, Section 5.8 — Signs, of the Farmington Code of Ordinances. The City's own published FAQ on the topic does not itemize the exempt/prohibited sign list online and instead directs applicants to the Planning Division and to the ordinance text directly.

Verified 2026-07-22 · Source

When you need this permit

  • Sign installation is explicitly listed among work requiring a permit on the City's 'Do I need a Construction Permit?' page
  • Governed by UDC Article 5 – Development Standards, Section 5.8 – Signs, of the Farmington Code of Ordinances
  • Applications and payment made in person only at 805 Municipal Drive, Annex Building, 2nd floor — no online permitting or payment
  • Questions about which signs are allowed without a permit, or which signs are prohibited, are directed by the City's own FAQ to the Planning Division at (505) 599-1301

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Filing fee
Not published — contact the department

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Farmington?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection

    The City of Farmington requires a final inspection for ALL permits issued, per the Building Inspection Division's published permit process; this applies to sign permits as with any other permit type.

See the full Farmington inspection guide — scheduling & re-inspection fees →

Tips

  • The City's own FAQ ('What signs are allowed without a permit? Are there prohibited signs?') does not list specific exemptions online — it refers applicants directly to UDC Article 5, Section 5.8 and to the Planning Division at (505) 599-1301. That FAQ page has since been retired from the live FAQ list; the answer text is preserved in the Wayback Machine archive cited below.
  • Farmington's monthly Building Permit Reports track sign permits as their own distinct category (e.g., 14 sign permits issued in October 2025, per the City's published reports) — confirming this is an actively used permit type, not a rarely issued one.
  • As with all Farmington permits, applications and payment must be made in person at 805 Municipal Drive, Annex Building, 2nd floor — there is no online sign permit application or payment option.

Frequently asked questions

Yes. Signs are explicitly listed among the work requiring a permit on the City's 'Do I need a Construction Permit?' page, and sign standards are governed by UDC Article 5, Section 5.8 (Signs) of the Farmington Code of Ordinances.

Farmington does not publish a plan-review timeline for this permit. Contact City of Farmington Community Development Department — Building Inspection Division at (505) 599-1304 for current turnaround.

You'll need: Sign Permit Application; Sign Plans/Drawings. See the required-documents checklist on this page for details on each.

Farmington requires 1 inspection(s) for a sign permit, in order: Final Inspection. Schedule each through City of Farmington Community Development Department — Building Inspection Division ((505) 599-1304).

Apply through City of Farmington Community Development Department — Building Inspection Division at 805 Municipal Drive, Annex Building, 2nd Floor, Farmington, NM 87401. Phone: (505) 599-1304, email: buildingdept@farmingtonnm.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. No online permitting or online payment is available; applications and payment (check, money order, cashier's check, or credit card — Discover not accepted) must be made in person at the Annex Building.. Official information: https://www.farmingtonnm.gov/887/Building-Inspection.

Farmington, New Mexico has adopted: 2021 New Mexico Commercial Building Code (2021 IBC as amended) — 14.7.2 NMAC; 2021 New Mexico Residential Building Code (2021 IRC as amended) — 14.7.3 NMAC; 2021 New Mexico Existing Building Code (2021 IEBC as amended) — 14.7.7 NMAC; 2021 New Mexico Earthen Building Materials Code — 14.7.4 NMAC; 2009 New Mexico Non-Load Bearing Baled Straw Construction Building Code — 14.7.5 NMAC; 2021 New Mexico Residential Energy Conservation Code (2021 IECC as amended) — 14.7.6 NMAC; 2021 New Mexico Historic Earthen Buildings Code — 14.7.8 NMAC; 2021 New Mexico Commercial Energy Conservation Code — 14.7.9 NMAC; 2021 New Mexico Plumbing Code (2021 UPC as amended) — 14.8.2 NMAC; 2012 New Mexico Swimming Pool, Spa and Hot Tub Code Phase III (2012 USPSHTC as amended) — 14.8.3 NMAC; 2021 New Mexico Mechanical Code (2021 UMC as amended) — 14.9.2 NMAC; 2012 New Mexico Solar Energy Code (2012 USEC as amended) — 14.9.6 NMAC; 2020 New Mexico Electrical Code (2020 NEC as amended), effective March 28, 2023 — 14.10.4 NMAC; 2012 New Mexico Electrical Safety Code (2012 NESC as amended) — 14.10.5 NMAC; 2021 International Fire Code — adopted by the City of Farmington; 14.5.1 NMAC General Provisions, 14.5.2 NMAC Permits, and 14.5.3 NMAC Inspections (Construction Industries Division rules) — adopted and amended by Chapter 7 of the City of Farmington Code of Ordinances. Local amendments apply — see the Farmington overview page for the full list.

The City has not published an itemized exempt-sign list on its current site. Its FAQ on the subject (now retired from the live FAQ list but preserved in web archive) directed applicants to UDC Article 5, Section 5.8 (Signs) and to contact the Planning Division at (505) 599-1301 for specifics.

Sources & verification

Verified against official sources. Last reviewed 2026-07-22.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Farmington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.